Change Order
PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
Five Sullivan Brothers Convention Center Contract For:General Construction Change Order 10 12
Addition and Renovation,Waterloo, IA. Project No:20-23943
Date:September 08,2020 Date:April 8,2021
OWNER:(Name and address) ARCHITECT:(Nance and address) CONTRACTOR:(Nance and address)
City of Waterloo I&S Group,Inc.(ISG) Cardinal C'onstruchon, Inc.
715 Mulberry Street 314 East 4th Street 1246 Martin Road
Waterloo,IA 50703 Waterloo,IA 50703 Waterloo,1A 50701
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description aj'the change and.if applicable,attach or reference specific exhibits.Also include agreed upon adjustments
ataributaable to executed Consinfelion Change Direclives)
A. PR 02Revised: Electrical changes- Revised pricing with no data cabling or devices,
just pipe and wire completed...............................................................................Add $5,465.14
TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$5,465.14.
The original Contract Sum was $ 5,516,300.00
The net change by previously authorized Change Orders $ 131,215.16
The Contract Sum prior to this Change Order was $ S,647,S15.16
The Contract Stun will be increased by this Change Order in the amount of $ 5,465.14
The new Contract Sum including this Change Order will be $ 5,652,980.30
The Contract Titue will be unchanged by Zero(0)days.
The new date of Substantial Completion will be August 13,2021.
NOTE:This Change Order does not include adjustments to the Contract Sunt or Guaranteed Maximum Price,or the Contract
Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
I&S Group,Inc.(ISG) Cardinal Construction,Inc. City of Waterloo
ARCHITECT(Firm name) C CTOR(Firm name) OWNER(Finn na+ne)
SIGNATURE SIG ATURE SIGNATURE
Nathan Compton,Architect Katy Susong,President Quentin Dart,Mayor
PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE
April 8,2021 April 8,2021 5/3/2021
DATE DATE DATE
AIA Document S701'"—2017.Copyright(D 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.Tho"American
Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered lradernews and may not be used without permission.This document
was produced by AIA software at 13:21:17 ET on 04/08/2021 under Order hto.8114132283 which expires on 07112/2021,is not for resale,is licensed for one-lime
use only,and may only be used in accordance with the AIR Contract Documentse Terms of Service.To report copyright violations,e-mail copyright@eia.org.
User Notes: (3139ADA311))