HomeMy WebLinkAboutLodge Construction - CO#13 Cont. No. 1015 - 5.17.2021 CITY OF WATERLOO IOWA CHANGE or EXTRA WORK ORDER NO. 13 PROJECT: F.Y. 2020 COURTLAND ST, JEFFERSON ST AND MULBERRY STREET RECONSTRUCTION PROGRAM, CONTRACT NO. 1015 Date Prepared: April 29, 2021 AMOUNT: 8,551.00 INCREASE TO: LODGE CONSTRUCTION INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated Aril 6 2020 . A. Description of change to be made or extra work to be done: 13001 Remove and Replace Sidewalk, 4 inch PCC 13002 Remove and Replace Light Pale, Conduit, etc. 13003 Excavate and Replace Contaminated Soil B. Reason for ordering change or extra work: 13001-13303 Cleanup of soil contaminated due to an underground storage tank discovered during the project requires removal and replacement of sidewalk, light base and pole, removal of contaminated soil and replacement with acceptable soil. C. Settlement for cost of work to be made as follows: 13001 Remove and Replace Sidewalk, 4 inch PCC 22 SY @ $73.00/SY = $1,606.00 13002 Remove and Replace Light Pole, Conduit, etc. 1 LS @ $4,950.00 = $4,950.00 13003 Excavate and Replace Contaminated Soil 21 CY @ $95.001CY = $1,995.00 TOTAL INCREASE $ 8,551.00 BY: c e H��4 5/17/2021 LODGE CONSTRUCTION , INC._ Mayor Date CONTRACTOR BY: S C ATTEST: - Kelley TITLE,5/1712021 Date TITLE: ��-�� City Clerk Date OVED: y ZE it4D to Change Order No. 13 Contract No. 1015 Page 1/1