HomeMy WebLinkAboutLodge Construction - CO#13 Cont. No. 1015 - 5.17.2021 CITY OF WATERLOO IOWA
CHANGE or EXTRA WORK ORDER NO. 13
PROJECT: F.Y. 2020 COURTLAND ST, JEFFERSON ST AND MULBERRY STREET
RECONSTRUCTION PROGRAM, CONTRACT NO. 1015
Date Prepared: April 29, 2021 AMOUNT: 8,551.00 INCREASE
TO: LODGE CONSTRUCTION INC. , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the
following extra work on your contract dated Aril 6 2020 .
A. Description of change to be made or extra work to be done:
13001 Remove and Replace Sidewalk, 4 inch PCC
13002 Remove and Replace Light Pale, Conduit, etc.
13003 Excavate and Replace Contaminated Soil
B. Reason for ordering change or extra work:
13001-13303 Cleanup of soil contaminated due to an underground storage tank discovered
during the project requires removal and replacement of sidewalk, light base and
pole, removal of contaminated soil and replacement with acceptable soil.
C. Settlement for cost of work to be made as follows:
13001 Remove and Replace Sidewalk, 4 inch PCC
22 SY @ $73.00/SY = $1,606.00
13002 Remove and Replace Light Pole, Conduit, etc.
1 LS @ $4,950.00 = $4,950.00
13003 Excavate and Replace Contaminated Soil
21 CY @ $95.001CY = $1,995.00
TOTAL INCREASE $ 8,551.00
BY: c e H��4 5/17/2021 LODGE CONSTRUCTION , INC._
Mayor Date CONTRACTOR
BY: S C
ATTEST: -
Kelley TITLE,5/1712021 Date
TITLE: ��-��
City Clerk Date
OVED:
y ZE
it4D to
Change Order No. 13 Contract No. 1015 Page 1/1