Loading...
HomeMy WebLinkAboutWoodruff Construction CO#4 - 5 Bros 2020 Skywalk - 5.17.2021 AIAw1 - Document G701 ' — 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 5 Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:004 2020 Skywalk Improvements,Waterloo, Project No: 19-23770 LA, Date:May 07,2020 Date:May 10,2021 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Mune and address) City of Waterloo 1&S Group,Inc.(ISG) Woodruff Construction,LLC 715 Mulberry Street 314 East 4th Street 1717 Falls Avenue Waterloo,IA 50703 Waterloo,LA 50703 Waterloo,lA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,ifapplicable,attach or reference specific exhibits.Also include agreed capon adjustments attributable to executed Construction Change Directives) A. PR 08: Cost to perform work related to Commercial Street-Skywalk Leak Fixes.............Afld 595,540.00 (Remove&replace curtain wall;metal tvall panels&flashings; recaullfing, tvcall framing&=infill, insulation and hall finishing). TOTAL AMOUNT Ol++"'PHIS CHANGE ORDER,ADD TO CONTRACT SUM$95,540.00. NOTE: Per PR 08-Construction to be performed on T&M NTE amt as noted above;professional design fees to be addressed per AIA doe G802 Amendment for Professional Pees. The original Contract Sum was $ 199,890.00 The net change by previously authorized Change Orders $ 17,044.00 The Contract Sum prior to this Change Order was $ 216,934.00 The Contract Sum will be increased by this Change Order in the amount of $ 95,540.00 The new Contract Sung including this Change Order will be $ 312,474,00 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will he August 21,2020(original contract date):August 1,2021 (added scope). NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,111c.(ISG) Woodruff Construction,LLC City of Waterloo ARCCXTECT(Firm name) CONTRA (Flan can: OWNER(Finn name) a Eo SIGNATURE SI�JATURE SIGNATURE Nathan Compton,Architect/Project John Mallen,Project Manager Quentin Hart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE May 10,2021May 12th, 2021 5/17/2021 DATE DATE DATE AIA document G701'--2017.Copyright @ 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,'AlA,"the AA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 17:16:44 ET on 0 511 112 0 2 1 under Order No.8114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org, User Notes: (3139ADA40)