Loading...
HomeMy WebLinkAboutCardinal Construction CO #15 - 5 Sullivan Bros Addition Renovation Project �mb1A Document G701 — 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION- Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:015 Addition and Renovation,Waterloo,IA. Project No:20-23943 Date:September 08,2020 Date:May 18,2021 OWNER:(Name and address) ARCHITECT:(Nenne and address) CONTRACTOR:(Name and address) City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc. 71.5 Mulberry Street 314 EasI 4th Street 1246 Martin Road Waterloo,LA 50703 Waterloo,LA 50703 Waterloo,TA 50701 THE CONTRACT IS CHANGED AS rOLLOVdS: (Insert a detailed descilption offhe change and,if applicable,altaeh or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives) A. PR 13: Cost for Electrical Plans: To remove circuitry from two can lights and bypass them to feed the remaining two lights........................................................Add $960.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$960.00. The original Contract Sum was $ 5,516,300.00 The net change by previously authorized Change Orders $ 139,012.30 The Contract Sum prior to this Change Order was $ 5,655,312.30 The Contract Stun will be increased by this Change Order in the amount of $ 960.00 The new Contract Sum including this Change Order will be $ 5,656,272.30 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be August 13,2021. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SINNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc.(ISG) Cardinal Construction,Inc. City of Waterloo ARCHITECT(Finn name) G CTOR(Niru:name) OWNER(Finn n�a ne)rx-1 f Nom/ SIGNATURE SIG ATURE SIGNATURE Nathan Compton,Architect Katy Susong,President Quentin Hart,Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE May 18,2021 May 18,2021 6/7/2021 DATE DATE DATE AIA Document G701"—2017,CopyrightO 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Arcnitecls.""AIA,"the AIA Logo,and'`AIA Contract Dora-ments'are registered trademarks and may nol be used without pennissioii-This document was produced by AIA software at 12:46:21 ET on 05118!2021 under Order No.8114132283 which expires on Orli 212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Nofes: (3139ADA40)