Loading...
HomeMy WebLinkAboutCardinal Construction, Inc - 5 Sullivan Bros 2nd Floor Renovation Project - 6.7.2021 OWNER A -*&jrA1A Document A101 - 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the Twenty-sixth day of May in the year Two Thousand Twenty-one ADDITIONS AND DELETIONS: (In words, indicate day, month and year.) The author of this document has added information needed for its BETWEEN the Owner: completion.The author may also (Name, legal status, address and other information) have revised the text of the original AIA standard form.An Additions and City of Waterloo Deletions Report that notes added 715 Mulberry Street information as well as revisions to the Waterloo,IA 50703 standard form text is available from Telephone Number: 319-291-4311 the author and should be reviewed.A Fax Number: 319-291-4286 vertical line in the left margin of this document indicates where the author and the Contractor: has added necessary information and where the author has added to or (Name, legal status, address and other information) deleted from the original AIA text. Cardinal Construction,Inc. This document has important legal 1246 Martin Road consequences.Consultation with an Waterloo,IA 50701 attorney is encouraged with respect Telephone Number: 319-232-5400 to its completion or modification. The parties should complete A1010-2017,Exhibit A, Insurance for the following Project: and Bonds,contemporaneously with (Name, location and detailed description) this Agreement.AIA Document A2010-2017,General Conditions of Five Sullivan Brothers Convention Center 2nd Floor Renovation, the Contract for Construction,is Waterloo,IA. adopted in this document by reference.Do not use with other general conditions unless this document is modified. The Architect: (Name, legal status, address and other information) I&S Group,Inc. (ISG) 314 East 4th Street Waterloo,IA 50703 Telephone Number: 319-234-1515 The Owner and Contractor agree as follows. Init. AIA Document A101®—2017.Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977, 1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order / No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General, Supplementary, and other Conditions),Drawings, Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement,and Modifications issued after execution of this Agreement,all of which form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations,or agreements, either written or oral.An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents,except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: (Check one of the following boxes) [X] The date of this Agreement. [ ] A date set forth in a notice to proceed issued by the Owner. [ ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected,then the date of commencement shall be the date of this Agreement. § 3.2 The Contract Time shall be measured from the date of commencement of the Work. § 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Contractor shall achieve Substantial Completion of the entire Work: (Paragraph deleted) [ ] Not later than ( )calendar days from the date of commencement of the Work. Inst. AIA Document A101®—2017.Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 2 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) [X] By the following date: Commence Date: July 01,2021 Substantial Completion Date: October 15,2021 Final Completion Date: October 29,2021 § 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Contractor shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3,liquidated damages,if any, shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be One Million Eight Hundred Ten Thousand Eight Hundred Dollars and Zero Cents($1,810,800.00),subject to additions and deductions as provided in the Contract Documents. Base Bid: $1,555,500.00 Alt#1 (Add) 23,000.00 Alt#2(Add) 45,300.00 Alt#3 (Add) 187,000.00 TOTAL CONTRACT SUM $1,810,800.00 § 4.2 Alternates § 4.2.1 Alternates,if any, included in the Contract Sum: Item Price Alt#1: To provide and install replacement of ceiling, $23,000.00 lighting,diffusers and other ceiling-hosted items in Room 216-Corridor. Alt#2: To provide and install replacement of ceiling, lighting,diffusers and other ceiling-hosted items in Room 215-Serving Pantry and 227-Corridor. $45,3000.00 Alt#3:Remove and replace VAV boxes and associated equipment and controls. $187,000.00 § 4.2.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Agreement.Upon acceptance,the Owner shall issue a Modification to this Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance N/A § 4.3 Allowances,if any,included in the Contract Sum: (Identify each allowance) Item Price None listed. § 4.4 Unit prices,if any: (Idents the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable) Init. AIA Document A1010-2017.Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 3 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order / No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) Item Units and Limitations Price per Unit($0.00) None listed. § 4.5 Liquidated damages,if any: (Insert terms and conditions for liquidated damages, if any) DIVISION 00—00 7300 SUPPLEMENTARY CONDITIONS- ARTICLE 15.1.7-LIQUIDATED DAMAGES A.In the event that Substantial Completion of the Work has not occurred on or before the date provided on the bid form by the bidder,then commencing on the following day,and continuing for each day or fraction thereof until Substantial Completion of the Work is established,the Contractor shall pay to the Owner,at the sole option of the Owner,the amount of Five Hundred and No/100 Dollars($500.00)per diem("Damage Amount"). B.The Contractor and the Owner agree that in the event the Substantial Completion of the Work does not occur on or prior to the date provided on the bid form by the bidder,the Owner will suffer damages in an amount which may,due to the special nature of the Project,the Owner's business and the Owner's reliance upon the Substantial Completion date,be impractical or extremely difficult to ascertain.The Owner and the Contractor agree that the Damage Amount is a reasonable estimate of the damages that the Owner will suffer in the event that Substantial Completion of the Work does not occur on or prior to the Substantial Completion Date. C.Payment of liquidated damages shall be in the form of a Change Order reducing the Contractor's Contract Sum by the amount of the liquidated damages. If the Contractor refuses to sign the Change Order for liquidated damages,the Owner reserves the right to unilaterally reduce the Contract Sum by the amount of the liquidated damages.If the amount of the liquidated damages exceeds the remaining unpaid balance of the Contract,the Contract Sum shall be reduced by the amount of the unpaid balance and the Contractor shall pay the Owner the difference between the liquidated damages and the unpaid balance. § 4.6 Other: (Insert provisions for bonus or other incentives, if any,that might result in a change to the Contract Sum) ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect,the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the last day of a month,the Owner shall make payment of the amount certified to the Contractor not later than the Fifteenth(15th)day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than Fifteen( 15)days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the Init. AIA Document A1010—2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 4 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order / No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) various portions of the Work.The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy,as the Architect may require.This schedule of values shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 In accordance with AIA Document A201TM-2017,General Conditions of the Contract for Construction,and subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: § 5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction,or,if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Construction Change Directives that the Architect determines,in the Architect's professional judgment,to be reasonably justified. § 5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; .2 The amount,if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201-2017; .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment,or nullify a Certificate of Payment in whole or in part,as provided in Article 9 of AIA Document A201-2017; and .5 Retainage withheld pursuant to Section 5.1.7. § 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work,the Owner may withhold the following amount,as retainage,from the payment otherwise due: (Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law) Five(5%) § 5.1.7.1.1 The following items are not subject to retainage: (Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc) § 5.1.7.2 Reduction or limitation of retainage,if any,shall be as follows: (If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion ofportions of the Work as provided in Section 3.3.2, insert provisions for such modifications) § 5.1.7.3 Except as set forth in this Section 5.1.7.3,upon Substantial Completion of the Work,the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows: (Insert any other conditions for release of retainage upon Substantial Completion) Init. AIA Document A1016—2017.Copyright @ 1915,1918,1925,1937,1951,1958, 1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 5 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order / No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) § 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor,the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201-2017. § 5.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 Final Payment § 5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of AIA Document A201-2017,and to satisfy other requirements,if any, which extend beyond final payment;and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: Minus no more than 200%of the value of the work not satisfactorily completed. § 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located. (Paragraph deleted) oda ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017,unless the parties appoint below another individual,not a party to this Agreement,to serve as the Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) § 6.2 Binding Dispute Resolution For any Claim subject to,but not resolved by,mediation pursuant to Article 15 of AIA Document A201-2017,the method of binding dispute resolution shall be as follows: (Paragraph deleted) [ ] Arbitration pursuant to Section 15.4 of AIA Document A201-2017 [X] Litigation in a court of competent jurisdiction [ ] Other(Specify) If the Owner and Contractor do not select a method of binding dispute resolution,or do not subsequently agree in writing to a binding dispute resolution method other than litigation,Claims will be resolved by litigation in a court of competent jurisdiction. ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2017. /nit. AIA Document A1010—2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 6 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) § 7.1.1 If the Contract is terminated for the Owner's convenience in accordance with Article 14 of AIA Document A201-2017,then the Owner shall pay the Contractor a termination fee as follows: (Paragraph deleted) § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2017. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2017 or another Contract Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 The Owner's representative: (Name, address, email address, and other information) Quentin Hart 715 Mulberry Street Waterloo,IA 50703 Telephone Number: 319-291-4311 § 8.3 The Contractor's representative: (Name, address, email address, and other information) Katy Susong 1246 Martin Road Waterloo,IA 50701 Telephone Number: 319-232-5400 § 8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days'prior notice to the other party. § 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A 10 1 Tm-2017,Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum. Refer to: Supplementary Instructions to Bidders, Article 7 Performance Bond and Payment Bond (7.03). § 8.5.2 The Contractor shall provide bonds as noted in the Supplementary Instructions to Bidders,Article 7 and ARTICLE 15 Supplementary General Conditions. § 8.6 Notice in electronic format,pursuant to Article 1 of AIA Document A201-2017,may be given in accordance with AIA Document E203TM-2013,Building Information Modeling and Digital Data Exhibit,if completed,or as otherwise set forth below: N/A § 8.7 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: Inst. AIA Document A1010-2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,"and"AIA Contract Documents"are 7 registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order / No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) .1 AIA Document A10IT14--2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A201TM-2017,General Conditions of the Contract for Construction .3 Drawings Number Title Date Title of Drawings exhibits: Exhibit"A" 4/16/21 .4 Specifications Section Title Date Pages Title of Specifications exhibit: Exhibit"B" 4/16/21 3 .5 Addenda,if any: Number Date Pages Addenda#1 4/30/21 32 Addenda#2 5/07/21 24 Addenda#3 5/11/21 6 Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9. .6 Other Exhibits: N/A (Check all boxes that apply and include appropriate information identifying the exhibit where required.) [ ] AIA Document E204Tm-2017, Sustainable Projects Exhibit,dated as indicated below: (Insert the date of the E204-2017 incorporated into this Agreement) [ ] The Sustainability Plan: Title Date Pages [ ] Supplementary and other Conditions of the Contract: Document Title Date Pages .9 Other documents,if any, listed below: (Paragraph deleted) � This Agreement entered into as of the day and year first written ove:f F r Q"e�"+"' H`�+ 6/7/2021 J OWNER(Signature) CT R(Signature) Quentin Hart,Mayor Ka song,President (Printed name and title) (Printed name and title) /nit. AIA Document A1010-2017.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,"A101,'and"AIA Contract Documents"are $ registered trademarks and may not be used without permission.This document was produced by AIA software at 11:18:33 ET on 05/26/2021 under Order ! No.8114132283 which expires on 07/12/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (1328565049) Five Sullivan Brothers Convention Center 2nd Floor Renovations Project#20-24695 Exhibit f , HEED` I[ Ex 'S_HEET#J SHEET TITLE GENERAL 8G1-10 TITLE SHEET 8GI-21 CGDE DATA &CODE DATA PLAN-1 ST FLOOR � 8G1-22 CODE DATA.PLAN-2ND FLOOR ARCHITECTURAL 8A1-01 INTERIOR ASSEMBLY TYPES 8A111" DEMOLITION PLANS u � - 8A1.22 SECOND FLOOR PLAN BA1-32 REELECTED CEILING PLAN BA -41 FIRST FI-OOR FINISH PLAN BAI-42 SECOND FLOOR FINISH PLAN &INTERIOR FINISH SCHEDULES 8A1-62 SECOND FLOOR SIGNAGE PLAN SA3-12 BUILDING SECTIONS 8A3-21 WALL SECTIONS& DETAILS 8A3-22 DETAILS 8A5-11 ENLARGED FLOOR PLANS, PLAN DETAILS, & DOOR SCHEDULE. 8A6-11 INTERIOR ELEVATIONS STRUCTURAL 8SA-11_ SECOND FLOOR ROOF FRAMING PIAN 8S6-11 I FRAMING DETAILS MECHANICAL 8MI.11 SECOND FLOOR HVAC DEMOLITION PLAN _ 13M1-12 PENTHOUSEMECHANICAL DEMOLITION PLAN ALTERNATE##4 - 8M1-21 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN 8 12-1.1 SECOND FLOOR HVAC CEILING PLAN 8M2"12 SECOND FLOOR ABOVE CEILING HVAC PLAN 8M2-13 PENTHOUSE.MECHANICAL PLAN -ALTERNATE#4 8M2-21 SECOND FLOOR HYDRONIC PIPING PLAN 8M3-11 MECHANICAL CALLOUTS,SECTIONS;AND ELEVATIONS 8M3-12 MECHANICAL CALLOUTS,SECTIONS,AND ELEVATIONS 884-12 HVAC AND HYDRONIC DETAILS BM5-11 I IVAC AND HYDI: ONIC SCHEDULES ELECTRICAL BEI.82A SECOND FLOOR ELECTRICAL DEMOLITION PLAN-AREA A 8E2-12A SECOND FLOOR POWER PLAN-AREA A 8E2-13A PENTHOUSE ELECTRICAL PLAN SE2-22A SECOND FLOOR LIGHTING PLAN -AREA A BE2-32A SECOND FLOOR SYSTEMS PLAN-AREA A _ 8124-12 ELECTRICAL"SYMBOLS, SCHEDULES ANL7 DETAILS - µ8E:5-11 PANELBOARD SCHEDULES 8E.5-21 LIGHTING 5CHEDULE3 TECHNOLOGY 811-42A SECOND FLOOR TECNOLOGY DEMOLITION PLAN-AREA A - 8T2-12A SECOND FLOOR TECHNOLOGY PLAN-AREA A 8T4-11 TECHNOLOGY DETAILS, RISERS,&SCHEDULES SECTION 00 0110 "B" TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 2.01 DIVISION 00 --PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0000- Project Manual Cover B. 00 0105-Certifications Page C. 00 0110-Table of Contents D. 00 1113- Notice of Public Hearing E. 00 2113- Instructions to Bidders F. 00 3113 - Bidding and Construction Schedule G. 00 4100 - Bid Form 1. Attachment-- Bidder Status Form 2. Attachment-- MBE-WBE Certified Contractors List 3. Attachment-- MBE-WBE -CCO-1 Compliance Form Index 4. Attachment-- MBE-WBE - CC0-1A Contract Compliance Program Policy 5. Attachment-- MBE-WBE - CCO-2 Subcontractors Bid Request Form 6. Attachment-- MBE-WBE - CCO-3 Letter Solicting for Subcontractors 7. Attachment-- MBE-WBE- CC04 Pre-Bid Contact Form 8. Attachment-- MBE-WBE - CC04A Pre-Bid Contact Information Form Instructions 9. Attachment-- MBE-WBE - CCO-5 Letter of Intent to Bid 10. Attachment-- MBE-WBE - CCO-6 Certificate of Accomplishment 11. Attachment-- Exemption Form - City of Waterloo H. 00 7200- General Conditions 1. Attachment--AIA Document A201, 2017 Edition I. 00 7300- Supplementary Conditions SPECIFICATIONS 3.01 DIVISION 01 --GENERAL REQUIREMENTS A. 01 2000 - Price and Payment Procedures B. 01 3000-Administrative Requirements 1. Attachment-- Shop Drawing Submittal Form C. 014000-Quality Requirements D. 01 5000-Temporary Facilities and Controls E. 01 6000- Product Requirements 1. Attachment-- Substitution Request Form F. 01 7000 - Execution and Closeout Requirements G. 01 7800 -Closeout Submittals 3.02 DIVISION 02 -- EXISTING CONDITIONS 3.03 DIVISION 03 --CONCRETE A. 03 3000-Cast-in-Place Concrete 3.04 DIVISION 04 -- MASONRY 3.05 DIVISION 05 -- METALS A. 05 4000- Cold-Formed Metal Framing B. 05 7313- Glazed Decorative Metal Railings 1. Attachment-- Product Data 3.06 DIVISION 06 --WOOD, PLASTICS, AND COMPOSITES A. 06 1000- Rough Carpentry Project No. 20-24695 Section 00 0110 - Page 1 of 3 Five Sullivan Brothers -Convention Center 2nd Floor Renovation B. 064100 -Architectural Wood Casework 3.07 DIVISION 07 --THERMAL AND MOISTURE PROTECTION A. 07 8400 - Firestopping B. 07 9200-Joint Sealants 3.08 DIVISION 08 --OPENINGS A. 08 1113- Hollow Metal Doors and Frames B. 08 7100- Door Hardware 3.09 DIVISION 09 --FINISHES A. 09 2116- Gypsum Board Assemblies B. 09 5100 -Acoustical Ceilings C. 09 6500 - Resilient Flooring D. 09 6813-Tile Carpeting E. 09 7200-Wall Coverings F. 09 9123- Interior Painting 3.10 DIVISION 10 --SPECIALTIES A. 10 1400-Signage B. 10 2239- Folding Panel Partitions C. 10 2240 - Folding Panel Partion Pocket Doors D. 10 2600 -Wall and Corner Protection E. 10 4400 - Fire Protection Specialties 3.11 DIVISION 11 --EQUIPMENT 3.12 DIVISION 12 --FURNISHINGS A. 12 3600 -Countertops 3.13 DIVISION 13 --SPECIAL CONSTRUCTION 3.14 DIVISION 14--CONVEYING EQUIPMENT 3.15 DIVISION 21 --FIRE SUPPRESSION 3.16 DIVISION 22 --PLUMBING 3.17 DIVISION 23 --HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) A. 23 0010 - Basic Mechanical HVAC Requirements B. 23 0130.51 - HVAC Air-Distribution System Cleaning C. 23 0519- Meters and Gauges for HVAC Piping D. 23 0553- Identification for HVAC Piping and Equipment E. 23 0593 -Testing, Adjusting, and Balancing for HVAC F. 23 0713 - Duct Insulation G. 23 0719 - HVAC Piping Insulation H. 23 0923 - Direct-Digital Control System for HVAC I. 23 0993 - Sequence of Operations for HVAC Controls J. 23 2113 - Hydronic Piping K. 23 2114- Hydronic Specialties L. 23 2500 - HVAC Water Treatment M. 23 3100 - HVAC Ducts and Casings N. 23 3300 -Air Duct Accessories O. 23 3319 - Duct Silencers P. 23 3600 -Air Terminal Units Project No. 20-24695 Section 00 0110- Page 2 of 3 Five Sullivan Brothers-Convention Center 2nd Floor Renovation Q. 23 3700 -Air Outlets and Inlets R. 23 4000 - HVAC Air Cleaning Devices S. 23 7313 - Modular Indoor Central-Station Air-Handling Units 3.18 DIVISION 26 --ELECTRICAL A. 26 0010 - Basic Electrical Requirements B. 26 0505 -Selective Demolition for Electrical C. 26 0519 - Low-Voltage Electrical Power Conductors and Cables D. 26 0526 - Grounding and Bonding for Electrical Systems E. 26 0529 - Hangers and Supports for Electrical Systems F. 26 0533.13-Conduit for Electrical Systems G. 26 0533.16- Boxes for Electrical Systems H. 26 0553 - Identification for Electrical Systems I. 26 0583 -Wiring Connections J. 26 0923 - Lighting Control Devices K. 26 0943 - Lighting Control System L. 26 2416 - Panelboards M. 26 2726 -Wiring Devices N. 26 2813 - Fuses O. 26 2816.13- Enclosed Circuit Breakers P. 26 2816.16- Enclosed Switches Q. 26 5100 - Interior Lighting 3.19 DIVISION 27 --COMMUNICATIONS A. 27 1000 -Structured Cabling B. 27 4000 -Audio Video Systems 3.20 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY A. 28 1000-Access Control B. 28 4600 - Fire Detection and Alarm 3.21 DIVISION 32 -- EXTERIOR IMPROVEMENTS 3.22 DIVISION 33 --UTILITIES END OF SECTION Project No. 20-24695 Section 00 0110 - Page 3 of 3 Five Sullivan Brothers -Convention Center 2nd Floor Renovation