Loading...
HomeMy WebLinkAboutCardinal Construction, Inc. - CO #14 - 5 Sullivan Bros Addition and Renovation Project - 6.7.2021 C� llnle-, Document G701 ' - 2017 Change Order PROJECT:(Marne and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Five Sullivan Brothers Convention Center Contract For:General Construction Cbange Order Number:014 Addition and Renovation,Waterloo,IA. Project No:20-23943 Date:September 08,2020 Date: May 11,2021 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address) City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction.Inc. 715 Mulberry Street 314 East 4th Street 1246 Martin Road Waterloo,lA 50703 Waterloo,IA 50703 Waterloo,IA 5070t THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,if applicable, attach or reference,spec fie exhibits.Also include agreed upolr adjustments attributable to executed Construction Change Directives.) A. COR 11: Cost for changes noted for Mounted Displays during submittal process.................................Add $742.00 (reduced cost per credit adjustment per PR 03) TOTAL AMOUNT OF THIS CHANGE,ORDER,ADD TO CONTRACT SUM$742.00. The original Contract Sum was $ 5,516,300.00 The net change by previously authorized Change Orders $ 138,270.30 The Contract Sum prior to this Change Order was $ 5,654,570.30 The Contract Sunt will be increased by this Change Order in the amount of $ 742.00 The new Contract Sum including this Change Order will be $ 5,655,312.30 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be August 13,2021. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc.(ISG) ar ' al Construction,Inc. _ -� City of Waterloo ARCHITECT(Firer name) C CTOR(Pimi name) 0 ER(I1ilrn n[���Jne) VCV2�1`i i lar' 'sicxio SIGNATURE SI ATURE SIGNATURE Nathan Compton,Architect Katy Suson ,President Quentin Hart,Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE May 11,2021 May 11,2021 6/7/2021 DATE DATE DATE AIA Ooeument G701'—2017.Copyright(D 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects;"AIA,"the AIA Logo,and LWA Contract Documents"are registered trademarks and may not be used without permission.This document .� was produced by AIA software at 15:45:57 ET on 05/11/2021 under Order No.8114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract DocumentsM Terms of Service.To report copyright violations,e-mail copyright@ala.org. User Notes: (3139ADA44)