Kidder Construction, Inc. - Substantial Completion - Public Works Truck Wash - 6.7.2021
T =WOMEN - IA Document G7042017 Certificate of Substantial Completion PROJECT: (name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION: Public Works Truck Wash Area Contract For: General Construction Certificate Number: 001 Improvements for the City of Waterloo, Project No: 19-23490 Iowa. Date: July 30, 2020 Date: Much 18, 2021 DOWNER: (name and address) ARCHITECT: (name and address) CONTRACTOR: (name and address) City of Waterloo I & S Group, Inc. (ISG) Kidder Construction, Inc. 715 Mulberry Street 314 East 4th Street 6036 Foulk Road Waterloo, IA 50703 Waterloo, IA 50703 PO Box 2242 Waterloo, IA 50704 The Work identified below has been reviewed and found, to the Architect's best knowledge, information, and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated below is the date established by this Certificate. (Identify the Work, orportion thereof, that is substantially complete.) Substantial Completion Date: December 30, 2020 Nathan Compton, I & S Group, Inc. (ISG) ArehitecNProject Manager Date Executed: March 18, 2021 ARCHITECT (Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION WARRANTIES The date of Substantial Completion of the Project or portion designated above is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: (Identify warranties that do not commence on the date of Substantial Completion, if any, and indicate their date of commencement.) WORK TO BE COMPLETED OR CORRECTED A list of items to be completed or corrected is attached hereto, or transmitted as agreed upon by the parties, and identified as follows: (Idents the list of Work to be completed or corrected.) See attached punchlist: ISG The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment, whichever occurs fust. The Contractor will complete or correct the Work on the list of items attached hereto within Thirty (30) days from the above date of Substantial Completion. Cost estimate of Work to be completed or corrected: $3,000 (see attached punchlist) The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work, insurance, and other items identified below shall be as follows: (Note: Owner 's and Contractor's legal and insurance counsel should review insurance requirements and coverage.) The Owner shall be responsible for maintenance, heat, utilities, insurance and damage caused by the Owner's personnel. The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion: AIA Document G704" . 2017. Copyrlght © 1983, 1978, 1992, 2000 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:00:31 ET on 03/18/2021 under Order No.8114132283 which expires on 07/12/2021 , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA3D) S' 1 Kidder Construction,Inc, CONTRACTOR(Firm SIGNATURE PRINTED NAME AND TITLE DATE Name) Ove_ -1,-,i HrE s,oxlo 6/7/2021 City o€Waterloo Quentin Hart OWNER(Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE I AIA Document G704-—2017.Copyright B 1963,1878,1992,2000 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and'AIA Contract Documents"are registered trademarks and may not be used without permission.This document 2 was produced by AIA software at 17:00:31 ET on 03118/2021 under Order No.8114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (369ADA3D) - - �` RE USE ' ,iLINISTRUTS AT e, leeee,e lee REMOVE AND REUSE _ PVC PIPING { _ II� 1 , \ rr -Tee ve lee RE USED PVC e -- -- _ ' PIPING ISUPPORTS WITHIN 6" � OF ELBOWS (TYP) 150# CLASS lee - - ,SCHEDULE 40 'GALVANIZED PIPE let -,0# CLASS II ii OHEDULE80 (' LVANIZED PIPE f; I 1p i LL / T SUPPORTS 6" OF ELBOWS (TYP)