HomeMy WebLinkAboutMidwest Concrete, Inc. - Cont. No. 1033 - 6.21.21 FINAL.QUANTITY ADJUSTMENT Owner City of Waterloo Date: 5/25/2021 Project Waterloo Airport Water Main-Phase Owner's Contract No. 1033 Contractor: Midwest Concrete,Inc. Date of Contact Start 10/6/2020 Contract Amount: $ 254,230.32 You are directed to make the following changes in the Contract Documents. Description: 2 Replacement of Unsultable Backfill Materials $ 26.00 /CY x -273 LF $ (7,098.00) 20 121n Wattles $ 2.70 /LF x -1.410.6 LF $ (3,808.62) 22 Urban Seed Mix-Permanent $ 3,800.00 /AC x -0.33 AC $ (1,254.00) 23 Urban Seed Mix-Temporary $ 500.00 /AC x -0.34 AC $ (170.00) 24 Rural Seed Mix-Temporary $ 500.00 /AC x -0.9 AC $ (450,00) TOTALADDITIONS $ (12,780.62) Reason for Change Order 2 Reduction In completed quantity. 20 Reduction In completed quantity. 22 Reduction In completed quantity. 23 Reduction In completed quantity. 24 Reduction In completed quantity. CONTRACT PRICE CONTRACT TIMC To Substantial To Final Completion Completion Original: $ 254,230.32 Original Completion Date: 11/20/2020 12/18/2020 Previous C.O.s(ADD/DEDUCT) $ 357.56 This C.O.(ADD/DEDUCT) $ (12,780.62) Revised Completion Date: 12/23/2020 5/3/2021 Contract Price with all approved .Change Orders: $ 241,807.26 It Is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein, Including all Impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED• — B 1_ f Vcaner(Authorized Signature) Date CCEPTED: Contractor(Authorized Signature) Date ACCEPTED: BY: 2LL 2' 5/25/2021 AECOM Date CITY OF WATERLOO AECOM 60633175 _ BY: ¢^+^ H«4 6/21/2021 Project No. Fin@IQty Adj Mayor Date ATTEST: Kelley �elchle 6/21/2021 City Clerk Date