HomeMy WebLinkAboutS. Krozek/J. Luck - EZ Liner - 7/19-20/2021 FINANCE DEPT. STAFF ONLY
LINE ITEM USED 266-17-7120-1345
TRAVEL REQUEST FY 22 BUDGETED $3,000.00
CITY OF WATERLOO EXPENDED YTD 0.00
THIS REQUEST $385.00
LEFT AFTER THIS
REQUEST $2,615.00
DATE July 6, 2021
Original-Clerk/Finance Co - Department
NAME(S) AND POSITION(S): DATE:
Scott Krozek, Sign Foreman July 6, 2021
Jeremiah Luck, Equipment Operator
NAME OF CLASS/MEETING: DESTINATION: Orange City, Iowa
EZ Llner - Picking up new truck with One Day
Training for Truck Mounted Striping Machine DEPARTURE POINT
IF NOT WATERLOO:
DEPARTURE DATE: RETURN DATE: DATE(S) OF MEETING:
July 19, 2021 July 20, 2021 July 19 and 20, 2021
PURPOSE OF TRAVELITRAINING:
Previously approved on April 4,2021 for One day training for 2021-EZ Liner Model TS-AL120 Truck Mounted Striping Machine to be held in May.
Previously approved on April 4,2021 for One day training for 2021-EZ Liner Model TS-AL120 Truck Mounted Striping Machine to be held in May.
Previously approved on April 4,2021 for One day training for 2021-EZ Liner Model TS-AL120 Truck Mounted Striping Machine to be held in May.
WILL TRAVEL REQUIRE ADDITIONAL PERSONNEL: X COST $
YES NO
METHOD OF TRAVEL:
XX CITY VEHICLE PRIVATE VEHICLE
AIRFARE DEPARTING FROM:
ESTIMATE OF COST: BUDGET LINE ITEM:
220.00 LODGING TAXI X GRANT REIMBURSABLE
90.00 MEALS PARKING YES NO
REGISTRATION AIRFARE X REQUIRED CERTIFICATION
75.00 MILEAGE/FUEL MISCITOLLS YES NO
TOTAL FOR ALL: $ 385.00 TOTAL: $ 155.00 PER PERSON
I BELIEVE THIS TRIP SERVES A PUBLIC PURPOSE I APPROVE THIS TRAVEL REQUEST
AND IS NECESSARY AND BENEFICIAL TO THE
CITY OF WATERLOO
Sandie Greco L
DEPARTMENT HEAD MAYOR
July 6, 2021
DATE DATE
K:\Shared Goodies\Forms\Travel Request Form January 2010
_ m
gloom
February 22, 2021
City of Waterloo-(Sourcewell Member ID#2491)
625 Glenwood Street
Waterloo,IA 50703
Re: Sourcewell Contract No.052417-EZL Purchase of EZ Liner
Model TS-AL120 Truck Mounted Striping Machine-Price Sheet
Item Description List Price
18H TV-AL1 10 Isuzu NPR-HD FE2 Gas Chassis
w/Paint Striping Body $147,400.00
18C-04-01 Add'l Paint&Bead Line with Graco guns 3,580.00
18C-04-04 120 Gallon SS Tank w/Agitators 5,710.00
18C-07-05 Camera Guidance System 10,080.00
Subtotal $166,770.00
3%Discount ($5,004.00)
Net Amount Published Pricing $161,766.00
Sourced Goods
Whelen Traffic Advisor Model TAC850 $1,642.00
Additional expenses as a result of changes:
Customizing electrical system to include chassis cab switch box;
Change placard for chassis cab switch box for camera system;
Modifying paint&bead plumbing assemblies
Engineering Fee for Changes 1,000.00
Total for Sourced Goods $2.642.00
TOTAL AMOUNT F.O.B.Orange City,IA..........................................$164,408.00*
*NOTE: One-day of training to be available at the factory,when unit is picked up.
OPTIONS
Delivery to Waterloo,IA$1,300.00.
Two-days of training at Waterloo,IA$3,800.00.
A build-slot for May 17,2021 is being held for this project. To continue to hold this
built-slot a purchase order needs to be received by March 1,2021.
Respectfully submitted,
LINER
ZNorm SchalCen � 1"
Truck Project Design&Bid Manager I
EZ Liner • PO Box 140 • Orange City,[AS 1041
P:(712)737-4016 • TF:(800)373-4016 - e6ner.com