HomeMy WebLinkAboutCommunity Electric, Inc. - CO#1 - FY21 Riverfront Stadium Electrical Repairs - 7.19.21 AIADocument G701 " -- 2017 Change Order PROJECT:(N ame and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: FY 2021 Riverfront Stadium Electrical Repair Project Contract For: General Construction Change Order Number:001 850 Park Rd., Date:May 18,2021 Date:June 08,2021 Waterloo,Ia 50703 OWNER:(Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Travis Niebols,Facilities/Project Manager MODUS Engineering Mike L.Palmer,President 1101 Campbell Avenue Waterloo,la 50701 214 E 4th Street Waterloo,la 50703 1510 Falls Avenue Waterloo,Ia 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives.) Summary of changes in the work along with the allowance -Cost of camera to inspect existing conduits -Additional conductors to the mezzanine panel -Removal of existing SPD -Deduct alternate -Mezzanine feeder elbow credit The original Contract Sura was $ 131,500.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 131,500.00 The Contract Sum will be decreased by this Change Order in the amount of $ 3,446.50 The new Contract Sum including this Change Order will be $ 128,053.50 The Contract Time will be decreased by Zero(0)days. The new date of Substantial Completion will be (unchanged). NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. MODUS Engineering Mike L.Palmer-,President City of Waterloo, Iowa ARCHIT CT(Fi me) CONTRACTOR(Firm name) OWNER(Firm/name) SIGNATURE I NATURE SIGNATURE SIG A URE Michael J.Brocka,Partner Mike L.Palmer, President Quentin Hart, Mayor PRINTED N ME ND TITLE PRINTED NAME ND TITLE PRINTED NAME AND TITLE 14 IL I f -I-dd July 19,2021 DATE DATE ddd — DATE AIA DOCLdnent G701`"—2017.Copyright OO 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.Th,e"Amer€can Institute of Architects,""AIA,"the AIA Logo,and'AIA Contract Documents are registered trademarks and may not be used without permissicn.This document was produced by AIA software at 16:39:49 ET on 0610812021 under Order No.0594029435 which expires on 01/0712022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3139ADA51D)