HomeMy WebLinkAboutWoodruff Construction, LLC - CO#3 - Hangar No. 4 - 7.19.2021 CHANGE ORDER NO. 3 (FINAL) Owner Waterloo Regional Airport, City of Waterloo,Iowa Date June 18, 2021 Project Hangar No. 4 Improvements Owner's Contract No. State Contract No. 21613 Contractor Woodruff Construction Date of Contract Start July 20,2020 You are directed to make the following change in the Contract Documents. Description: ITEOM DESCRIPTION UNIT RICE QUANTITY AMOUNT 105 Skim Coat Dry Wall(Delete) SFT $ 1.30 (1,100) $ (1,430.00) 107 Install,Mud and Tape Dry Wall SFT $ 3.82 (112.5) $ (429.75) TOTALS $ (1,859.75) Reason for Change Order: Item 105 -This item was removed and will be completed in a later phase of the project. Item 107—Work within this item was reduced and will be completed in a later phase of the project. CONTRACT PRICE CONTRACT TIMES (Calendar Date) Substantial Final completion completion Original: $ 105,213.75 Original: 11/15/2020 Previous C.O.s (ADD): $ 779.74 Previous C.O.s (ADD): 0 This C.O. (Deduct): $ (1,859.75) This C.O. (ADD): 28 Days Contract Price with all REVISED: 12/13/2020 approved Change Orders: $ 104,133.74 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order. Hangar#4 Improvements CO-3 (FINAL) Project No—60614052 1 THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By, 3 7/7/2021 Engineer(Authorized Signature) Date APPROVED: By: Qven � H��`F July 19,2021 Owner(Authorized Signature) Date ACCEPTED By: 6/22/21 C cto (Authorized Signature) Date Hangar#4 Improvements CO-3 (FINAL) Project No—60614052 2