HomeMy WebLinkAbout2003-199-03.31.2003 • rr, b • 0
tri t:C
O n E-i
E
c) • z
s• E-4
t4hiS :,R )8olution prepared by Nancy Eckert, City Clerk, 715 Mulberry
pctre4t, Waterloo, Iowa.
X Hi • RESOLUTION NO. 2003-199
tx1
s RESOLUTION PRELIMINARILY APPROVING PLANS,
c) 6.‹
- 1-10 SPECIFICATIONS, FORM OF CONTRACT, ETC. , FOR
ti-t cv) C.J F.Y. 2003 TRAFFIC SIGNAL MATERIALS FOR E. SAN
• >4 .1-4
0
n MARNAN DRIVE AND HAMMOND AVENUE, CONTRACT NO.
(-4 s k,11
672 .
0- -1
(1
WHEREAS, the City Council previously instructed the
,
cc' I-Superintendent of Traffic Operations to prepare and file plans,
'-cspecifications, form of contract and preliminary estimate of
cost,- etc. , for the construction of the F.Y. 2003 Traffic Signal
-144terals for E. San Marnan Drive and Hammond Avenue, Contract
1/41,
SNo._ 672, in the City of Waterloo, Iowa, as specified in the
specifications, and
WHEREAS, the Superintendent of Traffic Operations has filed
said plans, specifications, form of contract and preliminary
estimate of costs, etc. , and the Council of the City of Waterloo,
Iowa, having considered the same.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
WATERLOO, IOWA, that said plans, specifications, form of contract
and preliminary estimate of cost, etc. , be, and the same are
hereby preliminarily approved.
PASSED AND ADOPTED this 31st day of March, 2003 .
Jo n R. ooff, May
ATTEST:
Ntigkkozer___Sancy Eck , City
Clerk