Loading...
HomeMy WebLinkAboutAECOM Supplemental Agreement No. 1 Shaulis Road Phase IIAAECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA LA PORTE ROAD / HESS ROAD CORRIDOR IMPROVEMENTS STBG-SWAP-8155(760)--SG-07 PHASE IIA - FINAL DESIGN SHAULIS ROAD TO 400' SOUTH OF SAN MARNAN DRIVE SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated October 28, 2019, for preliminary and final design of improvements to the La Porte Road / Hess Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for Phase IIA, Final Design, of the La Porte Road / Hess Road Corridor Improvements Project from Shaulis Road to 400' south of San Marnan Drive. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION This project consists of improvements to the La Porte Road/Hess Road Corridor from just north of Mitchell Avenue to the Shaulis Road intersection, including modifications to the existing traffic operations, safety improvements, access management changes, transit accommodations, bike/pedestrian facilities and corridor aesthetics. As described in the original agreement, the design services have been split into three phases. Phase I - Preliminary Engineering Phase II - Final Design Phase III - Construction -Related Services This supplemental agreement is for Phase IIA, Final Design, which includes final design services on the La Porte Road / Hess Road Corridor from just north of Shaulis Road to 400' south of San Marnan Drive which will be the first phase of the final design. The final design services include geotechnical review, grading, paving, bicycle and pedestrian facilities, storm and sanitary sewers, culvert extensions, roadway conflict lighting, access management modifications, landscaping, aesthetics, right-of-way activities and RAISE grant assistance. Phase IIA, Final Design, will be separated into two divisions as follows: Division I - Final Design (SWAP Funding): The following design elements are included in this division of Phase IIA -Final Design: • Design of 2-lane Hess Road from Shaulis Road roundabout to Grimm Street, with left -turn lanes at existing and proposed intersections • Design of 3-lane (with TWLTL) Typical Cross Section for La Porte Road from Grimm Street to Bopp Street • Design of 5-lane (with TWLTL) Typical Cross Section for La Porte Road from Bopp Street to 400' south of the San Marnan Drive • Shared -use path along the west side for the entire length of project • Extension of existing crossroad culverts • New storm sewer system designed for a 10-year storm event AECOM • Conflict lighting at intersection locations • Construction staging based on roadway closure and detour routes • Corridor aesthetic enhancements • Utility coordination Page 2 The final design under this phase will be split into a maximum of two construction packages for Hess Road bidding based on funding availability. The section from Grimm Street to 400' south of San Marnan Drive will be designed to verify final roadway cross section and typical sections north of Grimm Street. These plans will be prepared for future funding. The following roadway elements are not included in the construction project: • Side roads beyond the immediate intersection with Hess Road / La Porte Road • Detailed hydrologic and hydraulic modeling of Crossroads Creek and the Crossroads Creek diversion. It is anticipated that any impacts to the floodway along the east ditch line of LaPorte Road will be mitigated through on -site grading that will provide equal conveyance which will not require detailed modeling. • FEMA LOMR or CLOMR permitting • Wetland mitigation design • Additional construction packages beyond the two described previously • Completion of Categorical Exclusion (CE) document Division II - RAISE Grant Assistance, Sanitary Sewer Design and ROW Exchange (Local Funding): The design services included in this division includes assistance in preparation of RAISE grant applications, including grant writing, benefit/cost analysis and presentation graphics for application. Division II also includes final design of sanitary sewer improvements in the corridor, as well as ROW documents for property transfer between the City of Waterloo and the Iowa DOT. II. SCOPE OF SERVICES PHASE IIA - FINAL DESIGN Division 1- Final Design (SWAP Funding) Geotechnical Engineering - Tasks 1-2. The soil borings and geotechnical engineering activities will be completed by Terracon Consultants. The scope of geotechnical engineering activities is intended to provide the necessary design recommendations for the grading and paving of the project. The following tasks are included in this scope: Task 1 - Soil Borings. Soil borings will be obtained to determine the subsurface conditions in the corridor. The number and depth of borings, as well as the number and type of samples obtained, will be sufficient to complete the geotechnical engineering and recommendations for the project. It is anticipated that soil borings will be obtained at approximate 400' intervals for the Phase IIA project limits. Task 2 - Geotechnical Engineering, Report and Recommendations. The geotechnical engineering will include the necessary laboratory testing, classifications and geotechnical engineering analysis required to develop the final geotechnical engineering recommendations for the project, including subgrade treatment recommendations and pavement thickness. Q-Sheets will be developed for inclusion in the plans to show boring locations and soil profiles. AECOM Page 3 Final Design - La Porte Road / Hess Road, Shaulis Road to 400' South of San Marnan Drive - Tasks 3-27. The following tasks lead to the completion and submittal of final grading, drainage and paving construction plans for the project. Preliminary design of this segment was completed as part of the initial design activities in Phase I - Preliminary Engineering, and the final construction plans will be based on the previously developed preliminary plans. Final design will be completed in accordance with Iowa DOT Standards and prepared for an Iowa DOT letting. Ritland Kuiper Landscape Architects (RKLA) will complete the tasks associated with landscaping and aesthetics. HR Green will complete the tasks associated with the box culvert extension and roadway conflict lighting design. The following tasks are included: Task 3 - Title and Legend Sheets Task 4 - Typical Sections and Details Task 5 - Bid Items and General Notes a. Bid Item and Quantity Listing b. Estimate Reference Information c. General Notes Task 6 - Tabulations and Quantities Task 7 - Plan and Profile Sheets a. Mainline La Porte / Hess Road b. Side Road Connections Task 8 - Geometric Layout Sheets Task 9 - Staging and Traffic Control Design Task 10 - Intersection Details Task 11 - Storm Sewer Design Task 12 - Pipe Culvert Extensions Task 13 - Box Culvert Extension (Completed by HR Green) Task 14 - Limited Hydrologic / Hydraulic Review of Crossroads Creek and Crossroads Creek Diversion Task 15 - Roadway (Conflict) Lighting Design (Completed by HR Green) Task 16 - Signing and Pavement Markings Design Task 17 - ADA Sidewalk Details Task 18 - Soils and Earthwork Design Task 19 - Temporary Erosion Control Design/SWPPP Task 20 - Subdrainage Design Task 21 - Landscaping/Aesthetic Enhancements Design (Completed by RKLA) Task 22 - Design Cross Sections Task 23 - Quality Control Review Task 24 - Printing and Submittals Task 25 - Construction Cost Opinion Task 26 - Special Provisions Task 27 - Field Review Right -of -Way Activities - Tasks 28-31. The following tasks include final right-of-way design and preparation of acquisition plats and descriptions for necessary property acquisition of the project. The City of Waterloo will complete the property acquisitions. For the purpose of estimating staff hours, a total of 25 temporary easements and 5 partial acquisition plats and legal descriptions were estimated. The following tasks are included: Task 28 - Property Surveys, Location of Property Pins Task 29 - Preparation of Acquisition Plats and Legal Descriptions Task 30 - Right -of -Way Staking Task 31 - Coordination with Right -of -Way Acquisition Staff AECOM Page 4 Public Meetings - Tasks 32-36. These tasks include preparation for and attendance at public informational activities, as needed, for this project. These activities will include one public informational meeting, two presentations at City Council meetings or work sessions, and up to ten meetings with individual property owners or neighborhood groups. These tasks will also include the use of social media to maintain an on-line presence throughout the design and construction process. The following tasks are included: Task 32 - Public Informational Meeting (1) Task 33 - Council Meetings (2) Task 34 - Property Owner Meetings (10) Task 35 - Social Media Outreach - Project Website Task 36 - Renderings of Corridor and Aesthetics Project Administration, Permitting and Meetings - Tasks 37-45. These tasks include project administration, coordination and meetings throughout the project development. Wetland delineation for the project corridor will be completed by Stantec. Permitting for the project is anticipated to include the NPDES construction permit, Iowa DNR Flood Plain and USACE Section 404 Permit. These tasks also include pre -letting activities and general project administration. The following identifies tasks leading to the completion of project administration, meetings and coordination during the design phase of the project. Task 37 - Utility Company Coordination Task 38 - Presentation Materials Task 39 - Wetland Delineation (Completed by Stantec) Task 40 - NPDES, Iowa DNR Flood Plain and USACE Section 404 Permit Applications Task 41 - Assistance with Utility Agreements Task 42 - Project Meetings Task 43 - Project Team Coordination Task 44 - Pre -letting Activities Task 45 - Project Administration Division 11— Local Funding RAISE Grant Assistance - Tasks 46-53 This Scope of Work includes tasks for the preparation of a RAISE (formerly BUILD and TIGER) Grant Application. It includes the following tasks to be completed by the CONSULTANT: RAISE Application Review Documents and Project Information Document Project Benefits and Innovations / Preliminary Assessment of Project Against RAISE Guidance Multimodal Connectivity Identify Innovations / Partnerships Economic Analysis - Benefit Cost Analysis (BCA) and Equity Considerations Consistency with Local Plans & Technical Feasibility Grant Application Draft and Final Application and Supplemental Materials It also assumes that the following tasks to be completed by the Client: Provide Required Project Information Secure Support Letters AECOM Certifications and Letters of Commitment for Funding Submission of the Application Assistance Coordinating with Project Partners (as needed) The tasks for the RAISE Grant Application are described below. Page 5 Task 46 - Review Documents and Project Information. The project team will review relevant reports including past analyses, state and county economic data and development strategies, infrastructure conditions reports, etc. and identify materials for use in the RAISE application. The information obtained will be updated as needed. Potential project documents include the environmental documents prepared to date for the project, economic and real estate analyses, the project financial plan, operating plan, and land -use plans. The key objective of this task is to understand the project's benefits, the available data and any gaps, and how the project fits into larger strategies for the region. For example, the RAISE guidance notes that projects that align with local climate plans are welcomed. Task 47 - Document Project Benefits and Innovations / Preliminary Assessment of Project Against RAISE Guidance. The project team will identify and highlight any creative aspects to the project as currently planned. The US Department of Transportation will give priority to projects in the 2021 round that address past racial inequities, that connect communities to economic opportunity, and that stimulate long-term growth, especially in economically distressed areas. Projects also benefit from innovative strategies to pursue the five long-term outcomes: safety, environmental sustainability, quality of life, economic competitiveness and state of good repair. In particular, under the quality of life and partnership merit criteria, "the Department seeks to use the RAISE program to encourage racial equity in two areas: (1) incorporating planning and adopting policies related to racial equity and reducing barriers to opportunity; and (2) investing in projects that either proactively address racial equity and barriers to opportunity, including automobile dependence as a form of barrier, or redress prior inequities and barriers to opportunity." Task 48 - Multimodal Connectivity. The project team will document the connectivity of the project to the broader transportation network in Waterloo (trails, transit, pedestrian accommodations for example) and to community activity centers. Connections to other transportation services will be highlighted. The RAISE Notice of Funding Opportunity (NOFO) language particularly highlights project qualities that "include physical -barrier -mitigating land bridges, caps, lids, linear parks and multimodal mobility investments that either redress past barriers to opportunity or that proactively create new connections and opportunities for underserved communities that are underserved by transportation." Task 49 - Identify Collaboration / Partnerships. The project team will identify and document any public / private collaborations, how the project supports other projects and initiatives in the area, especially any partnerships with non -transportation public agencies and any local plans to sustain / revitalize the city. Task 50 - Economic Analysis. The project team will assemble and verify data for the economic analysis. Estimates of benefits for each of the five long-term outcomes - state of good repair, economic competitiveness, quality of life, sustainability and safety - will be prepared as applicable. The team will determine that costs are accurate and comprehensive and will estimate economic benefits as delineated in federal guidance. The team will advise the Client on modifications to the project that will increase its eventual benefit/cost score. The project's location in or proximity to existing opportunity zones or areas of persistent poverty (as defined in the NOFO) will be documented. In addition, the project's impact on local transportation inequities will be described and explained. AECOM Page 6 Task 51 - Consistency with Local Plans and Technical Feasibility. The project team will describe the planning activity that led to the development of the project, its technical feasibility, and its consistency with the local community's and region's goals and larger planning initiatives. In particular, the NOFO language indicates that USDOT is seeking projects that support Climate Action Plans or apply environmental justice screening tools in the planning stage. Projects should include components that reduce emissions, promote energy efficiency, increase resiliency, and redevelop existing infrastructure. The Department seeks to fund projects that, to the extent possible, target at least 40% of resources and benefits towards low-income communities, disadvantaged communities, communities underserved by affordable transportation, or overburdened communities. Task 52 - Grant Application. The project team will draft the project narrative including description, project parties, grant funds sources and uses, and description of how the project's qualities align with the selection criteria. The draft will include a schedule, introductions, transitions and concluding statements in the project narrative. The team will create a map of the project and surrounding area. The team will assure the technical analysis meets AECOM's quality standards, and that text, maps, and graphics convey the suitability of the project for the RAISE discretionary program. Task 53 - Draft and Final Product. AECOM will submit the first draft of the RAISE Grant document to the Client for review and comment. The project team will revise the draft based on the Client's comments and issue a final draft. AECOM will submit the final product to Client with all supporting databases and document in a format suitable for electronic submittal. Deliverables Draft RAISE Grant Document (proposed on a rolling basis) Final RAISE Grant Document Economic Assessment Technical Memorandum and Workbook Completed Form 424 (with support from public agency partner) Technical Advice, as Requested Sanitary Sewer Design - Tasks 54-56. These tasks include analysis and design for improvements to the existing sanitary sewer system along the Phase IIA project limits. The sanitary sewer plans and special provisions will be incorporated into the roadway construction plans and will not be a stand-alone set with a separate construction letting. Task 54 - Service Area Review Task 55 - Review of Existing Sewer Conditions Task 56 - Final Design, Specifications and Construction Drawings for Phase IIA ROW Exchange (Iowa DOT / City of Waterloo) - Tasks 57-59. These tasks include property survey, research and documentation required to assist the City in exchanging excess ROW from the Iowa DOT to the City of Waterloo for purposes of economic development. These properties are located along La Porte Road, Hess Road, Texas Street and the U.S. Highway 218 and U.S. Highway 20 corridor. Task 57 - Property Surveys, Location of Property Pins Task 58 - Preparation of Acquisition Plats and Legal Descriptions Task 59 - Right -of -Way Staking AECOM PHASE IIB - FINAL DESIGN - 400' South of San Marnan Drive to Hawthorne Avenue Page 7 The scope for final design services for the project between San Marnan Drive and Hawthorne Avenue is not included in this Scope of Services but will be determined at the time the services are needed and defined under a future amendment to this agreement. PHASE III - CONSTRUCTION -RELATED SERVICES The scope for construction -related services will be determined at the time the services are needed and defined under a future amendment to this agreement. Construction -related services include construction staking, on -site field review, materials testing, contract administration during construction and right-of-way staking, including new property pins. III. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article VI of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement is $993,500.00, as stated below and as shown in Attachment A, and shall be integrated with the fees in the original agreement. Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Estimated Actual Costs Fixed Fee (Prime Only) Contingency (Prime Only) Contingency (Subs) Maximum Amount Payable Original Agreement S.A. No. 1 Total Division I (SWAP) Division I (SWAP) Division I $305,700.00 $736,100.00 $1,041,800.00 26,200.00 69,800.00 96,000.00 21,200.00 54,700.00 75,900.00 2,900.00 8,200.00 11,100.00 $356,000.00 $868,800.00 $1,224,800.00 Original Agreement S.A. No. 1 Total Division II (Local) Division II (Local) Division II (Local) $160,400.00 $101,500.00 $261,900.00 8,600.00 13,000.00 21,600.00 6,800.00 10,200.00 17,000.00 5,500.00 0.00 5,500.00 $181,300.00 $124,700.00 $306,000.00 AECOM Page 8 IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated October 28, 2019. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: APPROVED FOR CITY OF WATERLOO APPROVED FOR AECOM GL/e/IIi/� Her I By: By: Printed Name: Quentin Hart Printed Name: Douglas W. Schindel, P.E Title: Mayor Title: Associate Vice President Date: August 2, 2021 IOWA DEPARTMENT OF TRANSPORTATION Accepted for SWAP Authorization* Date: July 26, 2021 By: Printed Name: Kent L. Ellis, PE Title: Local Systems Field Engineer Date: *The Iowa DOT is not a party to this agreement. However, by signing this agreement, the Iowa DOT is indicating the work proposed under this agreement is acceptable for SWAP funds. O:\Administration\AGREE\SUPPLE\SA1 WAT La Porte Hess Road lmpr .docx La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa COST ANALYSIS - Division I - SWAP I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.1 Senior Professional 48 $93.13 $4,470.24 2.1 Project Professional 0 $70.67 $0.00 2.2 Project Professional 1,316 $70.10 $92,251.60 2.5 Project Professional 24 $69.21 $1,661.04 3.1 Staff Professional 180 $55.18 $9,932.40 3.2 Staff Professional 24 $54.47 $1,307.28 3.4 Staff Professional 308 $53.82 $16,576.56 3.6 Staff Professional 560 $50.35 $28,196.00 4.1 Professional 670 $35.10 $23,517.00 4.5 Professional 620 $28.85 $17,887.00 5.2 CADD Operator II 0 $41.01 $0.00 6.1 CADD Operator I 798 $30.41 $24,267.18 7.2 Senior Technician 24 $40.77 $978.48 8.4 Technician 48 $23.50 $1,128.00 9.2 Project Support 314 $33.58 $10,544.12 $232,716.90 4934 II. Payroll Burden and Overhead Provisional Costs 130.70% $304,160.99 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 2000 0.56 1,120.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 6000 0.06 360.00 Color Copies 9600 0.22 2,112.00 EDM Equipment 100 12.50 1,250.00 GPS Equipment 100 25.00 2,500.00 Miscellaneous, Other 2,400.00 $9,742.00 IV. AECOM Estimated Actual Costs $546,619.89 Rounded $546,600.00 V. Subcontract Expense HR Green $91,800.00 Terracon $58,500.00 RKLA $34,300.00 Stantec $4,900.00 $189,500.00 VI. Estimated Actual Costs $736,100.00 VII. Fixed Fee (13%) $69,794.13 Rounded $69,800.00 VIII. Contingency (10%) $54,660.00 Rounded $62,900.00 AECOM $54,700.00 HR Green $8,200.00 IX. Maximum Amount Payable $868,800.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa COST ANALYSIS - Division II - LOCAL I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount 1.0 Senior Professional 83 112.83 $9,364.89 1.1 Senior Professional 0 $93.13 $0.00 2.1 Project Professional 72 $70.67 $5,088.24 2.2 Project Professional 0 $70.10 $0.00 2.5 Project Professional 0 $69.21 $0.00 3.1 Staff Professional 172 $55.18 $9,490.96 3.2 Staff Professional 0 $54.47 $0.00 3.4 Staff Professional 0 $53.82 $0.00 3.6 Staff Professional 0 $50.35 $0.00 3.0 Staff Professional 122 $46.65 $5,691.30 4.1 Professional 0 $35.10 $0.00 4.5 Professional 0 $28.85 $0.00 5.2 CADD Operator II 200 $41.01 $8,202.00 6.1 CADD Operator I 50 $30.41 $1,520.50 7.2 Senior Technician 0 $40.77 $0.00 8.4 Technician 72 $23.50 $1,692.00 9.2 Project Support 68 $33.58 $2,283.44 $43,333.33 839 II. Payroll Burden and Overhead Provisional Costs 130.70% $56,636.66 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 500 0.56 280.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 1500 0.06 90.00 Color Copies 2400 0.22 528.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 600.00 IV. AECOM Estimated Actual Costs V. Subcontract Expense VI. Estimated Actual Costs VII. Fixed Fee (13%) VIII. Contingency (10%) $10,150.00 AECOM Rounded $1,498.00 $101,467.99 $101,500.00 $0.00 $101,500.00 $12,996.10 Rounded $13,000.00 Rounded $10,200.00 $10,200.00 IX. Maximum Amount Payable $124,700.00 La Porte Road/Hess Road - Shaulls Road to San Marnan Drive Phase 11A - Final Design City of Waterloo, Iowa AECOM Technica Services, Inc. Staff Hour Estimate Description of Work 1.1 Senior 1.0 Senior Prof Prof 2.1 Project 2.2 Project 2.5 Project 3.1 Staff 3.2 Staff 3.4 Staff 3.6 Staff 3.0 Staff 5.2 GADD 6.1 GADD 7.2 Senior 8.4 9.2 Project Prof Prof Prof Prof Prof Prof Prof Prof 4.1 Prof 4.5 Prof Op II Op I Technician Technician Support Total Division I - SWAP Funding Geotechmcal Engineering (Terracon) 1 Soil Borings 2 ,Gienoatie.chnslicganl En ineering, Report and Recams 3 Title and Legend Sheets 4 Typical Sections and Details 5 Bid Items and General Notes Afaiimett 4 4 4 4 11111 111111111 11.11 12 12 12 36 36 24 24 84 0 • Bid Item and Quantity Listing_ b Estimate Reference Information 18 18 8 8 • General Notes 12 6 Tabulations and Quantities 48 32 20 20 98 32 20 20 98 8 10 10 40 40 40 7 Plan and Profile Sheets 0 • Mainline La Porte/Hess Road b Side Road Connections 6 Geometric Layout Sheets 9 Staging and Traffic Control Design 10 Intersection Details 11 Storm Sewer Design 12 Pipe Culvert Extensions 13 Box Culvert Extension (HR Green) a Quadruple 120 RCB b Single 11Txti. RCB 14 Limited NSA Review of CR Creek and CR Creek Diversion 60 24 0 70 16 20 50 50 50 278 40 40 50 260 16 24 24 104 50 20 90 60 40 50 150 60 0 0 0 50 80 80 80 350 280 140 80 500 20 20 40 O 16 16 32 O 8 8 16 O 16 80 16 112 15 Roadway (Conflict) Ligh6n5 Design (FIR Green) 16 Signing and Pavement Markings Design 17 ADA Sidewalk Details 16 16 24 30 30 84 36 60 40 136 18 Soils and Earthwork Design 19 Temporary Erosion Control Design/SWPPP 20 Subdrainage Design 21 Landscaping/Aesthetic Enhancements Design OKLA) 22 Design Cross Sections 23 Quality Control Review 24 Printing and Submittals 25 Construction Cost Opinion 26 Special Provisions 27 Field Review Right -of -Way Activities 24 24 24 20 16 16 10 54 24 30 24 118 20 20 80 24 24 36 40 20 60 156 80 80 24 60 40 100 164 60 120 20 60 80 36 8 44 28 Property Surveys, Location of Property Pins 29 Preparation of Acquisition Plats and Legal Descriptions 30 Rp5ht-ol-Way Staking 31 ZInttoenz:Isl...Fij Right-Wumition Staff 32 Public Informational Meetings (1) 33 Council Meetings (2) 34 Properly Owner Meetings [10) 35 Social Media Outreach - Project Website 36 Renderings of Corridor and Aesthetics Troject Administration Permitting and Meetings 37 Utility Company Coordination 38 Presentation Materials O 12 24 24 60 O 140 140 O 24 24 48 48 48 16 16 60 30 30 76 30 30 76 40 30 130 20 20 20 __ 40 40 100 48 20 20 88 36 20 40 96 39 Wetland Delineation (Stantec) 40 Permit Applications (NPDES, Flood Plain, 404) 41 Assistance with Utility Agreements 42 Project Meetings 43 Project Team Coordination 44 Pre-lettin Activities 24 0 12 32 32 4 80 20 90 20 20 60 16 12 20 162 40 40 48 20 20 45 Project Admmistrahon Division I - SWAP Funding - Total 24 20 24 132 62 40 126 Division II - LOCAL Funding Division II - Local Funding 46 Review Documents and Project Inforrnation 47 Document Project Benefits and Inres/Prel Assessment of Pro' Against RAISE Guidance 48 Multimodal Connectivity 49 Identify Collaboration / Partnerships 50 Economic Analysis 51 Consistency with Local Plans and Technical Feasibility 52 Grant Application 53 Draft and Final Product 8 4 4 4 8 4 40 Sanitary Sewer Design 54 Service Area Review 24 55 Review of Existing Sewer Conditions 56 Final Design lanW e‘rhann. Ilgiaa DOT/City of Watedoe 24 24 8 27 12 20 4 8 90 4 4 50 148 4 8 48 40 64 40 64 120 20 164 57 Property Surveys,Location of Property Pins 58 Preparation of Acquisition Plats and Legal Descriptions 59 Right -of -Way Staking 48 0 0 48 96 100 40 140 24 24 48 Division LOCAL Fonda'',- Total "Ik 172 0 0 0 200 50 TOTAL HOURS 48 83 72 1,316 24 352 24 308 560 122 670 620 200 848 24 120 382 5,773 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa RKLA Staff Hour Estimate and Cost Analysis - Division I (SWAP Task No. Description of Work Senior LA 1 Senior LA 2 Landscape Architect Total Division I - SWAP Funding 21 Landscaping/Aesthetic Enhancements Design (RKLA) 30 120 20 170 36 Renderings of Corridor and Aesthetics 16 8 16 48 24 16 56 72 42 Project Meetings Division I - SWAP Funding - Total 54 184 60 298 Division 11- LOCAL Funding Division 11- LOCAL Funding - Total 0 0 0 0 TOTAL HOURS 54 184 60 298 Division I - SWAP Funding - Total SWAP Hours Hourly Rate Direct Labor Amount Estimated Expenses Direct Expense Costs Estimated Actual Costs Contingency (0%) - Rounded Maximum Amount Payable (Rounded) 54 184 60 $125.00 $125.00 $75.00 $6,750.00 $23,000.00 $4,500.00 $34,250.00 $0.00 Rounded $0.00 $34,250.00 $34,300.00 $0.00 $34,300.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa HR Green COST ANALYSIS - Division I - SWAP I. Direct Labor Cost Category Hours Rate/Hour Amount PIC 2 $126.65 $253.30 Senior Prof. (Roadway) 33 $67.29 $2,220.57 Senior Prof. (Electrical) 30 $67.96 $2,038.80 Senior Prof. (Structural) 68 $65.53 $4,456.04 Professional (Electrical) 97 $51.41 $4,986.77 Professional (Structutal) 119 $42.17 $5,018.23 Jr. Professional (Roadway) 73 $32.94 $2,404.62 Jr. Professional (Structutal) 219 $33.06 $7,240.14 Admin. Coordinator 15 $31.30 $469.50 656 $29,087.97 II. Payroll Burden and Overhead Costs 181.54% $52,806.30 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 260 0.56 145.60 Misc 0 0.00 $145.60 IV. Estimated Actual Costs (1+11+111) $82,039.87 Rounded $82,000.00 V. Fixed Fee (12%) $9,827.31 Rounded $9,800.00 VI. Contingency (10%) $8,203.99 Rounded $8,200.00 VII. Maximum Amount Payable (IV+V+VI) $100,000.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa HR Green Staff Hour Estimate Description of Work PIC Senior Prof. (Rdwy) Senior Prof. (Elec) Senior Prof. (Strut) Prof. (Electrical) Prof. (Structural) Jr. Prof. (Roadway) Jr. Prof. (Structural) Admin. Coordinator Total Division 1- SWAP Funding Geotechnical Engineering (Terracon) 1 Soil Borings 0 2 Geotechnical En ineerin , Re ort and Recommendations. Final Design 3 Title and Legend Sheets 0 0 4 Typical Sections and Details 0 5 Bid Items and General Notes 0 a Bid Item and Quantity Listing 0 b Estimate Reference Information 0 c General Notes 0 6 Tabulations and Quantities 0 7 Plan and Profile Sheets 0 a Mainline La Porte/Hess Road 0 b Side Road Connections 0 8 Geometric Layout Sheets 0 9 Staging and Traffic Control Design 0 10 Intersection Details 0 11 Storm Sewer Design 0 12 Pipe Culvert Extensions 0 13 Box Culvert Extension (HR Green) 0 a Quadruple 12'x6' RCB 1 12 43 76 141 5 278 b Single 10'x8' RCB 1 12 25 43 78 4 163 14 Limited H&H Review of CR Creek and CR Creek Diversion 0 15 Roadway (Conflict) Lighting Design (HR Green) 9 30 97 73 6 215 16 Signing and Pavement Markings Design 0 17 ADA Sidewalk Details 0 18 Soils and Earthwork Design 0 19 Temporary Erosion Control Design/SWPPP 0 20 Subdrainage Design 0 21 Landscaping/Aesthetic Enhancements Design (RKLA) 0 22 Design Cross Sections 0 23 Quality Control Review 0 24 Printing and Submittals 0 25 Construction Cost Opinion 0 26 Special Provisions 0 27 Field Review Right -of -Way Activities 0 0 28 Property Surveys, Location of Property Pins 29 Preparation of Acquisition Plats and Legal Descriptions 0 30 Right -of -Way Staking 0 31 Coordination with Right -of -Way Acquisition Staff Public Meetings ' 32 Public Informational Meetings (1) ® - _ 0 0 33 Council Meetings (2) 0 34 Property Owner Meetings (10) 0 35 Social Media Outreach - Project Website 0 36 Renderings of Corridor and Aesthetics Project Administration, Permitting and Meetings 0 0 37 Utility Company Coordination 38 Presentation Materials 0 39 Wetland Delineation (Stantec) 0 40 Permit Applications (NPDES, Flood Plain, 404) 0 41 Assistance with Utility Agreements 0 42 Project Meetings 0 43 Project Team Coordination 0 44 Pre -letting Activities 0 45 Project Administration 0 Division I - SWAP Funding - Total 2 97 73 15 Division 11- LOCAL Funding Division II - Local Funding RAISE Grant Assistance r 46 Review Documents and Project Information 0 47 Document Project Benefits and Inn's/Prel. Assessment of Proj. Against RAISE Guidance 0 48 Multimodal Connectivity 0 49 Identify Collaboration / Partnerships 0 50 Economic Analysis 0 51 Consistency with Local Plans and Technical Feasibility 0 52 Grant Application 0 53 Draft and Final Product 0 Sanitary Sewer Design 54 Service Area Review 0 55 Review of Existing Sewer Conditions 0 56 Final Design 0 ROW Exchange (Iowa DOT/City of Waterloo) 0 0 57 Property Surveys, Location of Property Pins 0 58 Preparation of Acquisition Plats and Legal Descriptions 0 59 Right -of -Way Staking Division 11- LOCAL Funding - Total 0 0 0 0 0 0 0 0 0 0 TOTAL HOURS 2 33 30 68 97 119 73 219 15 656 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa COST ANALYSIS - Division I - SWAP Staff Hour & Cost Estimate Terracon Consultants Direct Labor Cost Category Average - Technician II Average - Technician III Average - Technician V Average - Driller Average - Driller Helper Best, Heidi - Senior Admin. Ass. Kausalik, Kevin - Sen. CADD Op. Falk, Paul - Group Manager Miller, Gary - Project Engineer Cushman, Matthew - Senior Eng. Smith, Anna - Project Eng. Magner, Jeff - Regional Manager Average - Administrative 560 Payroll Burden and Overhead Costs III. Direct Project Expenses Category Drill Rig (Hours) Mileage Consumable & Misc. Supplies Traffic Control Subtotal IV. Estimated Actual Costs V. Fixed Fee (12%) VI. Contingency VII. Maximum Amount Payable Hours 85 65 30 30 30 5 85 30 180 20 5 5 5 575 Rate/Hour $17.74 $19.70 $25.11 $28.29 $19.10 $24.75 $27.25 $37.02 $35.10 $45.67 $37.74 $65.38 $18.48 Overhead FCCM(%) Amount $1,507.90 $1,280.50 $753.30 $848.70 $573.00 $123.75 $2,316.25 $1,110.60 $6,318.00 $913.40 $188.70 $326.90 $92.40 184.95% 1.070% Units Rate/Unit Amount 30 $62.87 $1,886.10 200 $0.56 $112.00 1 $550.00 $550.00 1 $3,800.00 $3,800.00 Rounded FCCM Rounded FF Less FCCM Attachment A $16,353.40 $30,245.61 $174.98 $6,348.10 $53,122.09 $53,100.00 $5,591.88 ($174.98) $5,400.00 $0.00 $58,500.00 La Porte Road/Hess Road - Shaulis Road to San Marnan Drive Phase IIA - Final Design City of Waterloo, Iowa COST ANALYSIS - Division I - SWAP Staff Hour & Cost Estimate Stantec Consultants I. Direct Labor Cost Category Hours Rate/Hour Amount Principal 4 $68.57 $274.28 Senior Environmental Scientist 26 $39.52 $1,027.52 Senior GIS Analyst 8 $41.68 $333.44 $1,635.24 38 II. Payroll Burden and Overhead Provisional Costs 158.57% $2,592.93 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 295 0.56 165.20 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 0 0.06 0.00 Color Copies 0 0.22 0.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 0.00 IV. Estimated Actual Costs V. Fixed Fee (12%) VI. Contingency (0%) $0.00 Rounded $165.20 $4,393.37 $4,400.00 $507.38 Rounded $500.00 Rounded $0.00 VII. Maximum Amount Payable $4,900.00