HomeMy WebLinkAbout2002-398-07.01.2002 C\) Z ee8
0 n FH
o'l H Z ic m CI tt)
tri '00C CC t: 0.)
E-4 F--1 H tri H E- a;
1---- C) m R I
0
M
cv u-This Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry
• '3'St.r9in- raterloo, Iowa.
f-i ' W U I-1 r.xi
RESOLUTION NO. 2002-398
C. Ho t(r"
N 21
I RESOLUTION PRELIMINARILY APPROVING PLANS,
tw c) to
O i-i 0 • 0 t- :::-?:. SPECIFICATIONS, FORM OF CONTRACT, ESTIMATE OF
COST, ETC. , FOR F.Y. 2003 HANNA
0 t."1 BOULEVARD/RAINBOW DRIVE BOX CULVERT-PHASE II
CD 0 0 CC t7J 7'
c) eft N tX E--1 0 cu AND RAINBOW DRIVE BOX CULVERT, CASTLE HILL
1 1:; ti tr1 i7-1 tri WATERSHED, CONTRACT NO. 639.
() 0 <1 • rs-i U
a; > C) :)-f t!,-; ••
co tH -E' • IgHEREAS, the City Council previously instructed the City
cIngineerpto prepare and file plans, specifications, form of
contract'7 and preliminary estimate of cost, etc. , for the
,-• - •
41construction of the F.Y. 2003 Hanna Boulevard/Rainbow Drive Box
Culvert-Phase II and Rainbow Drive Box Culvert, Castle Hill
Watershed, Contract No. 639, in the City of Waterloo, Iowa, as
specified in the specifications, and
WHEREAS, the Engineers have filed said plans, specifications,
form of contract and preliminary estimate of costs, etc. , and the
Council of the City of Waterloo, Iowa, having considered the same.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
WATERLOO, IOWA, that said plans, specifications, form of contract
and preliminary estimate of cost, etc. , be, and the same are
hereby preliminarily approved.
PASSED AND ADOPTED this 1st day of July, 2002.
John R. Roof , Mayor
ATTEST:
Nancy Ecker0,, City Clerk