HomeMy WebLinkAboutCardinal Construction CO #6_-_5_Bros_Addition_Renovation - 8.16.21 == Document G10101 Change Order PROJECT:(Nance and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:016 Addition and Renovation,Waterloo, IA. Project No:20-23943 Date:September 08,2020 Date:July 22,2021 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Nance and address) City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc. 715 Mulberry Street 314 last 4th Street 1246 Martin Road Waterloo,IA 50703 Waterloo,IA 50703 Waterloo,lA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, r,'j'applieable,attach or reference specific erhibils.Also include agreed upon adjustnrerus attributable to executed Construction Change Directives) A. COR-012: Replace existing sanitary waste piping and'/4"water piping that had been damaged by freezing temperatures before project started. Includes PVC for the waste pipe and fittings,and copper pipe and fittings for the water.Replace all the pipe and fittings under second floor in the southeast corner. Includes insulation on the copper water lines. . . . . . . . . . .. .. . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . .. . .. . . . . .. . . . . . . . . . .. . .ADD $5,115,00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO THE CONTRACT SUM`.65,115.00 The original Contract Sum was $ 5,516,306.00 The net change by previously authorized Change Orders $ 139,972.30 The Contract Sum prior to this Change Order was $ 5,656,272.30 The Contract Sum will be increased by this Change Order in the amount of $ S,1 15.00 The new Contract Sum including this Change Order will be $ 5,661,387.30 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be August 13,2021 NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Grout,Inc,(ISG) 4ar0i 1 Construction,Inc. _City of Waterloo ARCHITECT(Finn name) ACTOR(Fina name) OWNER(Finn name) SIGNATURE SMVTURE SIGNATURE Nathan Compton,Architect Katy Susong,President_ Quentin Hart,Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE July 22,2021 July 23,2021 m 8/16/2021 DATE DATE DATE AIA Document G701'"—2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.'rho"American Institute of Architects.""AIA,"the AIA Logo,and"AIA Contract Documenls"are registered trademarks and may not be used without permission.This document l was produced by AIA software at 14:35:41 ET on 07/22/2021 under Order No.9281462824 which expires on 0711212022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract DocumentsO Terms of Service.To report copyright violations,a-mall copyright@aia.org. User Notes: (359ADA4C)