HomeMy WebLinkAboutWaterloo Water Works - FY22 11th Street and Park Ave Bridge Replacements, Cont. No. 1013 - 8/16/2021 CITY OF WATERLOO
F.Y. 2022 11th Street and Park Avenue Bridge Replacements
CONTRACT No. 1013
AGREEMENT
I
NOW on this L day of . P-�ko'U—ST 2021,
the Waterloo Water Works and the City of Waterloo, lova•, enter into this Agreement for
and in consideration of the mutual covenants and promises contained herein and for other
good and valuable consideration, the receipt and sufficiency of which are hereby
acknowledged.
I. RECITALS
WHEREAS, the Park Avenue water main replacement is to be constructed in the
same corridors (Refer to E. AREA COVERED) in which the parties have some interest,
are proposed to be constructed beginning in calendar year 2021; and
WHEREAS, the parties presently have varying degrees of responsibilities for the
F.Y. 2022 11th Street and Park Avenue Bridge Replacements, Contract No. 1013, and
the replacement of the existing water main in the segment of Park Avenue listed below
in E. AREA COVERED; and
WHEREAS, the parties believe that savings can be realized through a joint
contracting venture and
WHEREAS, the parties believe that the payments to be made to the contractor
would best be handled by the City of Waterloo.
NOW, THEREFORE, the parties agree as follows:
II. TERMS OF AGREEMENT
A. PURPOSE. Refer to Recitals.
B. JURISDICTION. The jurisdiction for responsibility for design, inspection
and funding shall be: Division I — Road/Bridge Improvements (City of Waterloo)
Division II — Sanitary Sewer (City of Waterloo)
Division III —Waterloo Water Works
Division IV— Lighting and Signals (City of Waterloo)
C. FINANCING. The Waterloo Water Works and the City of Waterloo shall
share the costs for the Project according to the following:
Page 1 of 4
1. The Waterloo Water Works shall pay for the entire cost of
reconstruction or extension of the water mains along the proposed
corridors. (Division III)
2. The City of Waterloo shall pay for the entire cost of reconstruction or
extension of sanitary sewer and road improvements, if any, of Park
Avenue along the proposed corridor. (Division I, II and IV)
3. The City of Waterloo shall be responsible for administering the
payments to the contractor, to bill the Waterloo Water Works and the
Waterloo Water Works shall make payment within fifteen (15) days
of said billing.
4. Financing for this Project shall be the responsibility of each of the
parties hereto as reflected in this Agreement.
D. ADMINISTRATION OF AGREEMENT. Stanley Consultants, Inc. shall
prepare plans, specifications, estimate of quantities, estimate of cost, etc. and
include them in the contract as Division III. A licensed professional engineer in the
state of Iowa, shall sign the Division III Plans and Specifications.
The City of Waterloo shall follow the current City bidding procedures for the project
and administer the letting phase of this project. The construction phase of this
project shall be administered with City of Waterloo for Divisions I, II and IV and
Waterloo Water Works for Division 111. The Waterloo Water Works shall be notified
of all meetings involving said Project and shall have the right of review and
acceptance for each of the following phases for Division III:
1. Bid Award Approval;
2. Final Construction Approval_
E. AREA COVERED. The area covered by this Agreement shall be:
a. Park Avenue from approximately 60 feet southwest of the intersection
with Cedar Street northeast approximately 1,100 feet to the intersection
with Sycamore Street.
F. DURATION. This Agreement shall be in effect until completion of the
construction or termination by written agreement of all parties.
DATED this ! day of - ) 2021,
Page 2 of 4
CITY OF WATERLOO, IOWA
By:
1�
Quentin Hart, Mayor
City of Waterloo
ATTEST:
&W"
Kelley Felch , City Clerk
STATE OF IOWA, BLACK HAWK COUNTY, ss:
On this 1 6 day of q U5 f— , 2021, before me, the
undersigned, a Notary Public in and for the 9tate Of Iowa, personally appeared Quentin
Hart and Kelley Felchle, to me personally known, and who, being by me duly sworn, did
say that they are the Mayor and City Clerk, respectively, of the City of Waterloo, Iowa;
that the seal affixed to the foregoing instrument is the corporate seal of the corporation,
and that the instrument was signed and sealed on behalf of the corporation by authority
of its City Council as contained in the Resolution adopted by the City Council, under
Council Action No. Zo21- 550 of the City Council on the I &') day of
L �- , 2021, and that Quentin Hart and Kelley Felchle
acknowledged the execution of the instrument to be their voluntary act and deed and the
voluntary act and deed of the corporation, by it voluntarily executed.
Notary P Iic in for tWa 8tate of Iowa
*,,.L• NANCY HIGBY
F COMMISSION NO.788229
RAY C A+IMI I� pCP.IR
iow
Page 4 of 4
WATERLOO WATER WORKS
By:
Mary Potter Chair
Board of Trustees
Waterloo Water Works
ATTE
Chan Coon, General Manager and Board Secretary
STATE OF IOWA, BLACK HAWK COUNTY, ss:
On this ck� day of USL 2021, before me-, the
undersigned, a Notary Public in an for the State of Iowa, personally appeared Mary
Potter and Chad Coon, to me personally known, and who, being by me duly sworn, did
say that they arP the Roard of TrLJstP,P,S Chair and the General Manager and Board
Secretary, respectively, of the Waterloo Water Works; and that the instrument was signed
and sealed on behalf of the utility by authority of its Board of Trustees as contained in the
Resolution adopted by the Board of Trustees, on the oil sr day of
SaIu , 2021 and that Mary Potter and Chad Coon
acknowledged the execution of the instrument to be their voluntary act and deed and the
voluntary act and deed of the utility, by it voluntarily executed.
• -CARUA MANAHL
C0MMk%M W.MJ 814
Res
Notary Public in and for the State of Iowa # �•.► R �
Page 3 of 4