Loading...
HomeMy WebLinkAbout2001-599-10.22.2001 • SCE-+ C'J C\ Q "-i H H W ti r-+ LT? C> 'sue" p 0, This Resolution prepared by NancyEckert, City r-i street Waterloo, Iowa.tIT Clerk, 715 Mulberry E-+ !z' ' ,_, C [-17 `; > RESOLUTION NO. 2001-599 x F-H E--r a'C,' 01 C� a) RESOLUTION APPROVING TIMELINE FOR TRAIL SYSTEM • H IMPROVEMENTS AND EXPANSION FOR TRAIL SEGMENTS. Q .r `r BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, o tythat the attached timeline for trail system improvements and R:, EileXpansion for trail segments, be and the same is hereby approved. Qi o 0 PASSED AND ADOPTED this 22hd day of October, 2001 . t cr 0 F-I F-, Jo R. Ro f, Mayor ATTEST: r.d., Nancy Ec t, City Clerk + bd Prairie- Sergeant Road > Was let in Fall of 2001. Anticipated completion is Summer 2002. > This project is included in the city 2002 budget(bonds) with a match of$101,078.58. > The City is dedicated to repairing the recreational trail bridge over Black Hawk Creek with this project. Anticipated costs to the city are$55,000. This amount is included in the city 2002 budget. Donald Street > Anticipated to be let in 2004. City will begin work on discussions with neighbors (as it goes in front yards) and preliminary design ahead of that time. > This project would need to be included in the city 2004 budget(bonds) with a match of$140,000. ➢ This project includes$150,000 for 2003 and$114,000 for 2004 in Surface Transportation Program funds allocated by the Metropolitan Planning Organization. River walk ➢ Anticipated to be let in Summer of 2003. This is a part of the Vision Iowa Funds and the timely completion of the trail is contingent upon award of these funds. > This project would need to be included in the 2003-2005 budgets (bonds),with an estimated cost of$3,567,000 (with$2,000,000 in Vision Iowa funds). Cedar River Trail > Anticipated to be let in summer of 2002. City has already begun nonparticipating design (by Earthtech) to expedite trail completion. > This project is included in the city 2002 budget(bonds) with a match of$206,647.00. > This project includes$150,000 in local enhancement funds for 2002 (allocated by Metropolitan Planning Organization) and$328,000 in State enhancements funds (grant)for 2002. 218/CVLT Phase I > Anticipated to be let in Summer 2002. City is currently working to get design done (by Earthtech). ➢ This project is included in the city 2002 budget(bonds)with a match of$184,501.00. > This project includes$505,000 in State enhancement funds. Trolley Car Trail ➢ Will be let with the 218/CVLT Phase Ito get a better bid > This project is included in the city 2002 budget(bonds)with a match of$25,785.00. > This project includes$136,000 in local enhancement funds for 2001 (allocated by the Metropolitan Planning Organization). • Sergeant Road resurfacing > City applied for National Recreational Trails Program grant last month. If awarded,funds would be available in October 2002,with anticipated letting in summer of 2003. ➢ This project would need to be included in the city 2003 budget(bonds)with a match of$72,000.00. 18th Street Bridge > The 18th Street Bridge estimates for design(currently working to begin public hearings for design) included a trail on one side of the bridge,with a recreational trail being extended to the 218 trail thus,eliminating the temporary Black Hawk Street segment. > The 18th Street Bridge funds have been awarded and we are working to get under design. The first public meeting is anticipated to be set for November 8th.