HomeMy WebLinkAboutIDOT Agreement Addendum Park Ave Bridge 8.30.21 September 2019 IOWA DEPARTMENT OF TRANSPORTATION Addendum to Agreement No. 2-20-CHBP-005 for a Competitive Highway Bridge Program (CHBP) Project Recipient: City of Waterloo Project No: BRM-CHBP-8155(770)--NB-07 BRM-CHBP-8155(771)--NB-07 Iowa DOT Agreement No: 2-20-CHBP-005-A CFDA No. and Title: 20.205 Highway Planning and Construction This addendum between the City of Waterloo, Iowa (hereinafter referred to as the Recipient) and the Iowa Department of Transportation (hereinafter referred to as the Department). Iowa Code Sections 306A.7 and 307.44 provide for the Recipient and the Department to enter into agreements with each other for the purpose of financing transportation improvement projects on streets and highways in Iowa with Federal funds. The Competitive Highway Bridge Program (CHBP)funding was made available by Division L of the Consolidated Appropriations Act, 2018, which appropriated $225 million to be awarded by the United States Department of Transportation for a competitive highway bridge program. Federal funds are available for replacement or rehabilitation of specific bridges, which were included in the grant application and made a part of Iowa's $33,442,000 Grant Award. The highway bridge replacement or rehabilitation projects included in the grant application demonstrate cost savings by the bundling of multiple highway bridge projects. Federal-aid Swap Highway Bridge Program (HBP) funds are also available, under 761 Iowa Administrative Code (IAC) Chapter 161. The DOT and the Recipient previously entered into the following agreement for the above referenced project:Agreement No. 2-20-CHBP-005 was executed by the Recipient and the DOT on April 6, 2020, and April 8, 2020, respectively; and Pursuant to the terms of this agreement, applicable statutes, and administrative rules, the Department agrees to provide Competitive Highway Bridge Program funding to the Recipient for the authorized and approved costs for eligible items associated with the project. Under this agreement, the parties further agree as follows: 1. 80% of the eligible construction project costs incurred after the effective date of this agreement shall be paid from CHBP funds up to a maximum of$3,413,750 for(770) and $3,413750 for(771), which is 55% of the construction cost estimate at the time of grant application submittal. The Recipient shall receive reimbursement for costs of authorized and approved eligible project activities from CHBP funds, but at no time will the CHBP reimbursed amount exceed $3,413,750 for(770) and $3,413750 for(771). 2. Eligible construction project costs incurred after the effective date of this agreement shall be paid from Federal-aid Swap HBP Funds, as outlined in 761 IAC Chapter 161 and Local Systems Instructional Memorandum (I.M. 1.100, up to a maximum of$2,836,250 for(770)and $2,836,250 for(771). The Recipient shall receive reimbursement for costs of authorized and approved eligible project activities from Federal-aid Swap HBP funds, but at no time will the Federal-aid Swap HBP reimbursed amount exceed $2,836,250 for (770) and $2,836,250 for(771). 3. The Recipient shall pay for all project costs not reimbursed with CHBP funds or Federal-aid Swap HBP funds. 4. The Recipient shall let the project for bids through the Department. The project(s) shall have all necessary clearances in place in order to be authorized by FHWA on or before September 21, 2021, and let to contract by October 31, 2021. 5. It is the intent of both (all) parties that no third party beneficiaries be created by this Addendum. 6. If any section, provision, or part of this Addendum shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Addendum as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Addendum cannot be fulfilled. 7. All previously executed agreement(s) and or addendum(s)will remain in effect except as amended herein. Page 2 8. This Addendum, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the Recipient and DOT regarding this project. All previously executed agreements will remain in effect except as amended herein. Any subsequent change or modification to the terms of this Addendum will be in the form of a duly executed amendment to this document. IN WITNESS WHEREOF, each of the parties hereto has executed this agreement 2-20-CHBP-005-A as of the date shown opposite its signature below. City Signature Block By �'� "' H`r Date August 30 20 21 Mayor Title of city official Kelley Felchle certify that I am the City Clerk of Waterloo, and that Quentin Hart who signed said Agreement for and on behalf of the city was duly authorized to execute the same by virtue of a formal resolution duly passed and adopted by the city on the 30th day of August -' 20 21 Signed y1t �44 " ` Date August 30 12021 City Clerk of Waterloo, Iowa IOWA DEPARTMENT OF TRANSPORTATION Highway Administration By Date 20 Nicole Moore, P.E. Director, Local Systems Bureau