Loading...
HomeMy WebLinkAboutWoodruff Construction CO#4, Cont. No. 994 - 9.7.2021 ,eM I STRAND Strand Associates, Inc.° 910 West Wingra Drive of Madison, WI 53715 EXCELLENCE IN ENGINEERING (P)608.251.4843 August 23, 2021 CHANGE ORDER NO. 4 PROJECT: F.Y. 2020 Wastewater Treatment Plant Biosolids Modifications Project OWNER: City of Waterloo, Iowa CONTRACT: City Contract No. 994 CONTRACTOR: Woodruff Construction Description of Change 4a Provide polyvinyl chloride (PVC) domestic water pipe ADD $0.00 instead of copper, and replace copper pipe previously installed in Structure 180 with PVC pipe in accordance with the enclosed Cost Proposal Request (CPR) 010 dated April 16, 2021. 4b Provide lintel for louver 330-03 in Structure 330 in ADD $1,895.00 accordance with the enclosed CPR 012 dated May 20, 2021, and cost proposal dated June 1, 2021. 4c Amend Contract Substantial Completion date and ADD $0.00 Contract Final Completion date for time lost to wet weather between May 1, 2020 and July 1, 2020, as summarized in the enclosed letter from Woodruff Construction dated July 7, 2021. 4d Provide monorail crane modifications in Structure 180 ADD $2,435.00 in accordance with the enclosed cost proposal dated July 14, 2021. 4e Provide rotating disc gate valve on the existing 4-inch ADD $2,928.00 W2 line in Structure 180 in accordance with the enclosed cost proposal dated July 16, 2021. 4f Provide additional door removal and replacement in ADD $16,759.00 Structures 240 and 330 in accordance with the enclosed CPR 01 1 dated July 23, 2021 and cost proposal dated July 28, 2021. ADD TOTAL VALUE OF THIS CHANGE ORDER: $24,017.00 SKFI dP,S:\NIA0\4400--4499\446,\009\COOsIrOCIIUp\Chanee Orders\004\COd docs �ooa lilincis j indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com Strand Associates, Inc: City of Waterloo, Iowa—Woodruff Construction Contract 994, Change Order No. 4 Page 2 August 23, 2021 Contract Price Adjustment Original Contract Price $16,587,300.00 Previous Change Order Adjustments $54,718.10 Adjustment in Contract Price this Change Order $24,017.00 Current Contract Price including this Change Order $16,666,035.10 Contract Substantial Completion Date Adjustment Original Contract Substantial Completion Date January 2, 2022 Contract Substantial Completion Date Adjustments due to previous Change Orders 14 Days Contract Substantial Completion Date Adjustments due to this Change Order 33 Days Current Substantial Contract Completion Dates including all Change Orders February 18, 2022 Contract Final Completion Date Adjustment Original Contract Final Completion Date March 3, 2022 Contract Final Completion Date Adjustments due to previous Change Orders 14 Days Contract Final Completion Date Adjustments due to this Change Order 33 Days Current Final Contract Completion Dates including all Change Orders April 19, 2022 pk This document shall become a supplement to the Contract and all provisions will apply hereto. off:RANDALL A.•: .N ED =w: WIRTZ 0: 16137 , GINEER—Strand Associ• s, Inc.° Date /OWN ���`, APPROVED 8/23/2021 CON TOR—W o ru f GKVtruction Date PROVED H"-l- _'; 9/7/2021 OWNER—City of Waterloo, Iowa Date SKH dl\S:\MAD\4400--4499\4463\009\Construction\Change Orders\004\CO4 docs www.strand.com