Cardinal Construction CO#2 - 5 Bros 2nd Floor Reno - 9.20.2021
�4-A1,A1A Document G701 " - 2017 Change Order PROJECT:(Naive and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Five Sullis an Brothers Convention Center Contract For:General Construction Change Order Number:002 271d Floor Renovation,Waterloo. IA. Project No:20-24695 Date:May 26,2021 Date:September s,2021 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:fNaure and address) City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc. 715 Mulberry Street 314 East 4th Street 1246 Martin Road Waterton,IA 50703 Waterloo,IA 50703 Waterloo,IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable,attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Con (ruction Change Directives) A. COR 02: Cost for folding partition structures.................................................................... Add $5,024.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$5,024.00. The original Contract Sum was $ 1,810,800.00 The net change by previously authorized Change Orders $ 0.00 The Contract Surn prior to this Change Order was $ t,810,800.00 The Contract Sum will be increased by this Change Order in the amount of $ 5,024.00 The new Contract Sum including this Change Order will be $ 1,815,824.00 The Contract Time will be unchanged by zero(0)days. The new date of Substantial Completion will he December 23,2021;New Feral Completion Date: January 7,2022. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I_&S Group,Inc.(ISG) aid' al.Construction,Inc. City of Waterloo ARCHITECT(Finn name) ACTOR(Firm name) OWNER(Finn name) SIGNATURE V41TURE SIGNATURE Nathan Compton,Architect/Project Katy Susong,President Quentin Hart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE September 8,2021 September 8,2021 9/20/2021 DATE DATE DATE AIA Document G701" 2017.Copyright©1979,1987,2(100.2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute or Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 11:26:00 ET on 09/08/2021 under Order No.9281462824 which expires on 07112/2022,is not for resale,is licensed for one-lime use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3139ADMA)