Cardinal Construction - CO #19 5 Sullivan Bros. - 10.4.2021
AA ® 'l Document G701 ' - 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Five Sullivan Brothers Convention Center Contract For: General Construction Change Order Number: 019 Addition and Renovation, Waterloo, IA. Project No: 20-23943 Date: September 08, 2020 Date: September 20, 2021 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Narne and address) City of Waterloo I & S Group, Inc. (ISG) Cardinal Construction. Inc. 715 Mulberry Street 314 East 4th Street 1246 Martin Road Waterloo, IA 50703 Waterloo, IA 50703 Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description ofthe change and, ifapplicable, attach or reference spec(fic exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. COR (PR19): Furnish and install a catwalk through the existing high truss roof as described.................................................................... $249,311.00 Pricing to furnish and install a catvalk through the existing high truss rooj'described below. Salvage 6x9 beams that were removed from the high truss roof. These members will be fabricated and installed as the 2'-6" pieces that will run perpendicular to the building. These memebers will be welded to the existing structure on one side and supported by angle iron hanging from above structure on other side. Two new 6x9 beams will span the l2' between each truss. These will be welded top flange to top flange. Angle iron will be installed over the above mentioned structure to create a toe kick around the perimeter of the building. 2'-6" wide bar grate will be installed inside of the above mentioned angle iron around the perimeter of the building. (Corners will not connect) A 1 /2" diameter rod will be welded to the existing vertical members of the Huss around the perimeter of the building to create tie off locations along the entire length of the cahvalk Roof frames will be added at the 4 cornets of the building to support new roof hatches that will be flashed into the existing roof membrane. Ladders will be installed at each of the 4 roof hatch locations to provide access to the newly installed cat walk-. Lead time/fabrication time will be approx. 8 weeks. We will need 8 weeks to install once material is on site. The translucent panels will take 8 weeks to install once the catwalk is complete. TOTAL AMOUNT OF THIS CHANE ORDER, ADD TO CONTRACT SUM $2499311.00. Note. Contractor is requesting additional 24 weeks from the date of approval. This allows 8 weeks for lead time of materials and fabrication, 8 weeks for installation of the catwalk and 8 weeks to install the translucent panels. The original Contract Sun was $ 52516.300.00 The net change by previously authorized Change Orders $ t52,803.30 The Contract Sum prior to this Change Order was $ 5,669, 103.30 The Contract Sum will be increased by this Change Order in the amount of $ 249.31 1 .00 The new Contract Sum including this Change Order will be $ 559185414.30 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be August 13, 2021. AIA Document G701'" — 2017. Copyright © 1979; 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects,""'AIA," the AIA Logo, and °AIA Coni act Documents" are registered trademarks and may not be used witheul permission. This document was produced by AIA software at 14:59:13 ET on 09/20/2021 under Order No.9281462824 which expires on 07/12/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract DocumenlseTerms of Service. To report copyright violations, e-mail copyright@ala.org. User Notes: (3B9ADA51) NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and tune have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. T&S Group,Inc.(TSG) 441 1 Construction,inc. City of Waterloo ARCHITECT(Firm name) CCTOR(Firer name) OWNER(Firm name) Qve�14in SIGNATURE sibAATURE SIGNATURE Nathan Compton,Architect Katy Susang,President Quentin Hart,Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE 10/4/2021 September 20,2021 September 20,2021 DATE DATE DATE AIA Document G701"-2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Dccuments"are registered trademarks and may not be used without permission.This document 2 was produced by AIA software at 14:59:13 ET on 09/20/2021 under Order No.9281462824 which expires on 07/1212022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract DocumentO Terms of Service.To report copyright violations,e-mail copyrighl@aie.org. !User Notes: (389ADA51)