HomeMy WebLinkAboutCardinal Construction - CO #20 - 5 Sullivan Bros Addition and Reno - 10.4.2021 Document G701TM 2417
IRE37
Change Order
PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:020
Addition and Renovation,Waterloo,IA. Project No:20-23943
Date:September 08,2020 Date:September 20,2021
OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address)
City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc.
715 Mulberry Street 314 East 4th Street 1246 Martin Road
Waterloo,IA 50703 Waterloo,lA 50703 Waterloo,IA 50701
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description ofthe change and,if applicable,attach or reference specific exhibits.Also include agreed upon adjustments
attributable to executed Construction Change Directives.)
A.COR(PR 17): To add non-keyed removable mullion to Opening 100A only.......................Add $707.00
TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$707.00.
The original Contract Sum was $ _5,516,300.00
The net change by previously authorized Change Orders $ 402,114,30
The Contract Sum prior to this Change Order was $ 5,918,414.30
The Contract Stun will be increased by this Change Order in the amount of $ 707.00
The new Contract Sum including this Change Order will be $ 5,919,121.30
The Contract Time will be unchanged by Zero(0)days.
The new date of Substantial Completion will be August 13,2021.
NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract
Time,that have been authori2ed by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
I&S Group,Inc.(ISG) din 1 Construction,Inc. City of Waterloo +
ARCHITECT(Firm frame) CCTOR(Firm name) OWNER(Firm name) I
/G '' �.xve✓ITiil Hc,rT si���
SIGNATURE SZRATuRE SIGNATURE a
Nathan Compton,Architect Katy Susong,President Quentin Hart,Mayor
PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE
September 20 2021 September 20,2021 10/4/2021
DATE DATE DATE
AIA Document G701"—2017.Copyright Q 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American
Institute of Architects; 'AIA,"the AiA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without pennission.This document )
was produced by AIA software at 15:17:24 ET an 09/20/2021 under Order No.9281462824 which expires on 0711212022,Is not for resale,is licensed for one-time
use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mall copydght@aia.org.
User Notes: (389ADA4E) I.
I