HomeMy WebLinkAboutPeterson Contractors, Inc. Final Qty Summary - Cont. No. 991 - 10.4.2021 CITY OF WATERLOO,IOWA
FINAL QUANTITY SUMMARY
PROJECT: FY 2020 Newell Street RISE Project -; CONTRACT NO. 991
Date Prepared:.. September 1, 2021 AMOUNT: $ $14,596.97 INCREASE
TO: Peterson Contractors Inc. Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the
following extra work on your contract dated June 8,2020.
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities
B. Reason for ordering change or extra work:
As-built quantities varied for some bid items
C. Settlement for cost of work to be made as follows:
Compensation already made to Contractor through bid items
See attached summary
Total Net Increase $14,596.97
CITY OF WATERLOO
10/4/2021
�'�^4"J H�.�-� ���"`"
BY: Peters Contractors Inc.
Mayor Date C TRAC R
B
Date
ATTEST:
Y, F4,R, 10/4/2021 PRINTED NAME:
City Clerk Date
TITLE:
APPROVED:
a. 1/
Vcity Engineer Daie
FY 2020 Newell Street RISE Project RM-8156(766)-90-07
Final Quantity Summary
Item nbact UM Total Change Chores
Rambo. DamcnNon Lanka Quantity Pit" Caere ammuty Amount
law
Ex"vau", cWsc m. ReadxaY/W BonarCYK5.71230
6.00 5515.0 0.00 f
2 TaPoail, Spead CY 6.50 2.1 so.N M S
3 apM. sNPAM Sbckple 6.50 2,190.00 0.00 f
6ub9rMe SYWiaeBm Maledak PPNmerOM u,50 gg g
MaQAM Su6bve. S'Thick 1]8.00 2,314.N 3,18 i (165.70)
noukier FiNSWno. Eaton
5225.60 24.00 W f
SIaMNd Or Sip Form PLorlleM Cement Concrete Pavement, Clea C. CMaa20uraWW 91n. SY N1.52 5,734.05 M25 $ 623.02
a 50Nedno. DYNamY. Class ACrvaM1M sbne ND.00 27.55 55 S 103.00
movIVOISiDn EACH $150Uo 2.00 0.00 f
10 Aprons, Conuele, 10 !73. Die. EACNi1.0:$7.35
100 00 S
11 ficlon, Law Chstrance Coherent, Equivalent Diameter 301n. EACN $2,23.00 p.0o S12 Cutter, LowCbors"t C"saleS an<e PI". EgQvabnl Uaq larW in. LF $1 ]000 0.00 s
EACH $2.9000 f
11 IMake. 5W-54f FACH 6.33.00 oo $
15 oke Ealeraion UNL 6W-542 EACH 1.00 $2,0100 o0 f
16 IMake, SW645, LO • tY EACH 1.00 1500.00 f
i7 ManholeMiusenenI. Mele1 EACX 1.00 9x0too a.m s
IB min, I-Min dinal, IShouWeN 0 In, Dia.
2,117.00 0.00 S
19 SUMrain PNer,filn., AS PerPkn EACX 3.111.00 !050.00 4.00 0.00 S
M 6uMrain OutlN, DR.tOI EACH 6.00TV2.M12718
00 6W 0.00 $
21 storm menforavily MNn, Trenched, Retfinced Cenaate A" (RCP), MM (Clant lID.1s In If 15x.0000 45x.00 O.OD 5
II Storm Sawe<OL Main, Trammed, RNnlorced Concrete Pl" (RCP), 2000D (Claaa 110.18173 ' LF 1)5.0000 1]800 0.00 i
23 war Pipe Lacs Than Or Equal Te 38 In. IF 155.000 155.00 00 f
24 R nn SM?
TON 47.20M 12].38 00.10 S 3.367.508Y ],311. 153,311.002B samw Canute EACH 2.000 2.00 2) PalmedPevemeMM2r ", WalakumoOlgo entbNM ETA 13.850 1)95 00 f
26 PaInlM 8ym0oN PM LageMc. PreformEACH 00000 0.00 S
2B LS 10000 1.00pm0 4
]0bol Ly I,pp 00 0.00 8
31 Waley Maln. Tranched, Ducclelmn Pi" (UP), 161n, LF 568.00 5108.00 606.00 38.00 $ 4101.00
32 Fre Hydrant Assembly EACH 1.00 58,000.00 1.00 0.00 3
33 mova101Flre HYdnnl Assembly EACH 00 $1.500.00 1.00 00 5
6 I'ulef le ln. Oale V9Na NIP) EACH J.00 5]200.00 0.00 f
35 Remove Md0.ein91a1 Fenu Gale EACH W S1,DOOmO100 000 S
38 0.emova101Walermain LF 500.00 no 600.00 00 0f
37 special Death Control. WOM EkaeWol Nal 112.00 $16.00 101.0 -10.40 f (166.40)
MuWWn0. 10100d Ca0ubee Fiber ACRE2.13 6.150.00 3.54 41 f 2,167.50
la Seeding And Femleng (Rm0 ACRE 1.16 51.275.00 ].M 190 S 2,122.50
40 Seetling And FaN3Enp Nr6an) ACRE 0.67 $1,000.00 0.14 .0.53 3 (1007.00)
41 SAFence LF 1,933.00 $1.75 1.292.00 -641 .00 $ (1,121.]5)
43 SIX Fence ForWN CM1e<tr LF 199.00 ov11.95 258.00 59.00 f 2512,-05
13 Removal Of Not Or sial Force Duch Checks LF 2,132.00 10.35 711.W -1421.00 f (407.6)
Malnlename 0161E Fence Or 518 Fan" For OXM Check
LF 2,133.00 $0.25 4113.00 f (533.00)
45 SUMIZed Construction Enhance. EW03 LF 100.00 67.50 401.04 S (4.750.00)
46 OPOnThuoal Curb Intake SeQmenl Fiber, EC-602 LF 40.00 6].W 41.W -5.00 5 (67.50)
47 Maintenance 010pm-TNaa1Cw61nNka 5eafmanl Fifer EACH $25.00 Jme 1 (100.0%
48 Removal Of Can inner Curb Intake SeQmenl Firer EACH 1.00 550.00 1.00 000 5
49 MoW$aafo". Eloapn Cement EACH 4,pp 15000013M
15.007`7.60.00
TOTAL CHANGE USE SIO ITEMS ! 1
C.O. 41 Rank Check Dam LF so 525.00 S
emoval of Rock Cha<k Om EACH 32x0.0 20.00 $
ROTAL CHANGE C,O. /i i 500.00
.rl Nnalai Conaele Pl" Agon LeaalNan M' EACH 32,120.00 0.00 t
enhde, MOM Sewer, SW-401. 40 In., W%SW601C Covar EACH 6,8$p.OD 00 S
Lowe! OECr O0n, Trenched, Reudweed Connote A" (RCP). 20000 (C1w 111).24 in 328 5]920 0.011 3
TOTAL CNANOE C.p. /S s
. p EacavIVIAL9on NMUEU . R0adwe am Senuw cal 56,00 1,110.00 0.00
TOTAL C WINCE C.O. N s
70, 41 palMM S mbek end Le ends, Walerban$ w SoNenl EACH 3 Si]2.0 3.00
TOTAL CHANGE C.O. N 00 s
.O. AS Ev"vatlon. Chas to CY 120 128,00
1
3'Ma"dem Slone, 6- Degh 6Y 3314 60.00 33.10 000 $
"to Seed. ferti$ae AM Mukh - I AL 0.05 $2x000.00 05 i 1.100.00
aw Walde - Inolei, Mainitln am mamma 20e $7.)0 21 0 19.00 S 146.]0
TOTAL CHANGE C.U. 45
i 1,111.30
TOTAL INCREASE
696.6
Lose Con PfPd<e uu 794.so
n moan
Cn" s 21 M.11320
CM1en 4 546 BMm0
Chen e8 31071.00
/ s nen20
FnNOuan Summa $he SWAT
tra<IAmouM 37]1,038.17
lawmal
Ilen
RNeinea s 65551.91
malPaM "FIVaaer 3731, 3e
Page f or t