HomeMy WebLinkAboutWoodruff Construction - CO #5 - 5 Sullivan Bros 2020 Skyewalk Improvement - 10.4.2021 -rti Document G701 ' - 2017 Change Order PROJECT: (Name and«ddrEvs) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 5 Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:005 2020 Skywalk Improvements.Waterloo, Project No: 19-23770 IA. Date:May 07,2020 Date:September 8,2021 OWNER:(Name and address) ARCHITECT:(Nance and address) CONTRACTOR: (Nacre and address) City of Waterloo I&S Group,Inc.(ISG) Woodruff Construction.LLC 715 Mulberry Street 314 East 4th Street 1717 Falls Avenue Waterloo,[A 50703 Waterloo, IA 50703 Waterloo,IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Inverl a detailed description of the change and,if'applirahle, attach or reference speck exhibits.Also include agreed upon adjusinrents attributable to executed Com.sirtrctlon Change Directives.) A. PR 09: Credit to Owner for"Cost to Perfonn Work per CO 04-Skywalk Leak Fixes"; (Original NTE quote was$95,540.00 less actual T&Manrount of'$88,407.00)..............Deduct ($7,133,00) TOTAL AMOUNT OF THIS CHANGE ORDER,DEDUCT FROM CONTRACT SUM($7,133.011). The original Contract Sum was $ 199,890.00 The net change by previously authorized Change Orders $ 112,584.00 The Contract Sum prior to this Change Order was $ 312,474,00 The Contract Stun will be decreased by this Change Order in the amount of $ 7,133.00 The new Contract Sum including this Change Order will be $ 305,341.00 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be August 21,2020(original contract);August 1,2021 (added scope). NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede tate Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. 1&S Group,Inc.(ISG) Woodruff Construction,LLC City of Waterloo ARCHITECT(Firm mane) CONTRACTOR(Fir name) OWNER(!'irrn name) 0v2,41*,1 Har °S SIGNATURE Si ATURE SIGNATURE Nathan Compton,Architect/Project John Mallen,Project Manager Quentin Dart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE September 8,2021 9/9/21 10/4/2021 DATE DATE DATE AIA Document G701"-2017.Copyright O 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Instilule of Architects,""AIA,"the AIA Logo,and"AIA Conlract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 12:23:43 ET on 09/08/2021 under Order No.9281462824 which expires on 07!9212022,is not for resale,is licensed for one-time use only,and may only be used In accordance with the AIA Contract Documentsa Terms of Service.To report copyright violations,e-mail copyright@aiaorg. User Notes: (3139ADA41P) WOODRUFF CONSTRUCTION LLC 1717 Falls Ave Waterloo IA 50701 - Phone (319) 233 .3349 - Fax (319) 233.3369 Ci y—( of Waterloo NO, 4 715 Mulberry St, Waterloo, IA 50703 DATE: 08/30/21 JOB NO. : 19-23770 PROJECT: Skywalk Improvements Terms: Net 10 BILLING RETENTION TOTAL DUE Supervision Labor - 35 hours ((V $85/h $2,975.00 $2, 975,00 Materials $200.00 $200.00 Infill Curtain Wall Panels Labor • 70 hours 0 $60/h $4,200,00 $4,200.00 Material $800,00 $800.00 Equipment $2,000,00 $20000.00 CR Glass $56,500,00 $56,500.00 D&G Metal Works $ 11 ,700.00 $11 ,700.00 Markup (1079) $7,837.50 $7,837.50 Insurance/Bond (2,8%) $2194.50 $2,194.50 Total Amount Due $88,407.00 Please Remit To: Woodruff Construction 501 Greenfield Dr. Tiffin, IA 52340 A minimum Finance Charge of 1 .5% per month or 18% annually applies to all past due invoices