Loading...
HomeMy WebLinkAboutVJ Engineering - Clark Street Utility Extension - 10.18.2021 vj engineering 1501 technology pkwy, suite 100 cedar falls, iowa 50613 ph: (319) 266-5829 fax: (319) 266-5160 engineering— surveying September 24, 2021 Iowa Department of Natural Resources Attn: Wastewater Engineering Section 502 E. 9th Street Des Moines, IA 50319-0034 Re: Clark Street Utility Extension Waterloo, Iowa Please find enclosed for your review and approval the following information: 1) Application Fee Form 2) Application Fee in the amount of$100.00 3) Wastewater Section Construction Permit Application Packet (2 copies) a) Sewage Treatment Agreement b) Schedule A— Construction Permit Application c) Schedule B — Collection System d) Schedule C — Lateral Sewer Extension 4) Construction Plans (2 copies) Should you have any questions, please contact our office. Sincerely, Dan Arends, P.E. VJ Engineering Enclosures o IOWA DEPARTMENT OF NATURAL RESOURCES CASHIER'S USE ONLY 0945-542-NPDE-CP-0570 Wastewater Disposal System Construction Permit 32-3202 Application Fee Form Owner Owner Name: 3 Stooges, LLC Address: PO Box 203 City, State, Zip: Waterloo, IA 50704 p Project Identification: Clark Street Utilities Extension p [■ $100 Fee enclosed Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources". Place it and the check or money order on top of other Construction Permit Application documents. Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by Iowa Code 4556.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by Iowa Code 4556.197 and Iowa Administrative Code 567 IAC 64.16(3)"c". The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump stations,treatment units or a combination thereof.The fee shall be submitted with the certified engineering documents necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents necessary to constitute a construction permit application. The application fee is not necessary when submitting a planning document but must accompany construction permit application documents.A fee should accompany each permit application received on or after July 1,2006. Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions regarding the application fee, please contact Donna Gomm at 515-725-8427 or Donna.GommP, dnr.iowa.gov Signature of Owner or Representative: Printed Name: Tony Fischels Telephone or email contact: 319-415-8870 Mail to: Iowa Department of Natural Resources Wastewater Engineering Section 502 East 9th Street Des Moines, IA 50319-0034 11/2014 cmc DNR Form 542-1245 Iowa Department of Natural Resources Wastewater Section @go Construction Permit Application SCHEDULE A,Construction Permit Application Exhibit 11A APPLICANT ENGINEER Owner: 3 Stooges, LLC Firm: VJ Engineering Address: PO BOX 203,Waterloo, IA 50704 Address: 1501 Technology Pky,Ste 100,Cedar Falls, IA 50613 Representative: Tony Fischels Project Officer: Daniel Arends Phone Number: 319-415-8870 Phone Number: 319-266-5829 Email: tony.fischels@gmail.com Email: darends@vjengineering.com Project Identification: Clark Street Utilities Extension Estimated Start Date*: .10/15/2021 Estimated Completion Date: 5/1/2022 PLEASE RESPOND TO ALL QUESTIONS Yes No 1. Has an engineering report,facilities plan or other information previously been submitted for this project? ❑ ❑X If Yes: Project Identity: Date Submitted. 2. Does the project and construction permit application,as submitted,follow the recommendations,design loadings, 0 ❑ construction schedule, permit limits,and conclusions of the approved engineering report or facilities plan? If No: Provide the design basis and technical information justifying all changes. 3.Are there three complete sets of plans and specifications accompanying this application? Q ❑ For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,three sets of plans and specifications may be requested. 4.Are approved standard specifications a part of this application? ❑ 0 If Yes: Approved Standard Specifications of (municipality or firm): Date Approved: 5. Does each set of plans and specifications or engineering report accompanying this application contain a 0 ❑ "professional engineering seal"executed in conformance with 5426.16,Code of Iowa? If No: Processing will be delayed pending receipt of applicable design schedules and certified plans,specifications or engineering report. 6. Is this a joint wastewater and water supply project? X❑ ❑ If Yes: A construction permit application for the water supply project should be submitted separately to the Water Supply Section.A Water Supply permit fee may be required. 7. Is the applicant to provide treatment of effluent resulting from this construction? ❑ 0 If No: A Sewage Treatment Agreement executed by the authority providing treatment must accompany this form. 8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ X❑ If Yes: A new or amended permit to operate may be requested prior to the receipt of a construction permit. 9. Is any waterline located within 10 feet;or any private or public well,lake,or public recreation area located within ❑ 0 400 feet of the proposed construction? If Yes: Identify and locate the facility(ies)relative to the proposed construction. 10.Will construction inspection be conducted by a licensed engineer employed by the applicant? ❑ 0 If No: Name of Engineering Firm Conducting Inspection: VJ Engineering 11.Will this project utilize CWSRF loan funds? ❑ 0 CERTIFICATION APPLICANT ENGINEER I certify that I am the authorized representative of the owner I certify that all aspects of the design included in this application and state that the project identified above is approved by the conform to applicable standards contained in Chapter 567 IAC owner. 64,or that an explanation and justification for any proposed variations from such standards is attached.I am familiar with the information contained in this application and,to the best of my knowledge, such information is complete and accurate. Signature G�� Date � � Signature T l ;, Date 20210928 *Estimated ConstrucW Start Da �omplete applications must be submitted at least 120 days in advance of the date for starting construction in ac dance w� Rules 567 IAC 60.4 and 64.2 Please complete the Schedule Checklist on the following page of this form. 11/2015 cmc DNR Form 542-3129;28A DOCUMENT CHECKLIST Identify all categories included in this project.Also,identify schedules attached to this application. Schedule Title Attached Included in Project Submittal Date B Collection System ❑ ❑ C Lateral Sewer Extension x❑ ❑ D Trunk&Interceptor Sewer ❑ ❑ E Wastewater Pump Station ❑ ❑ F Treatment Project Site Selection ❑ ❑ G Treatment Project Design Data ❑ ❑ H1 Schematic Flow Diagram ❑ ❑ H2 Treatment Process Loading and Removal Efficiency ❑ ❑ H3 Mechanical Plant Reliability ❑ ❑ 1 Screening,Grit Removal and Flow Measurement ❑ ❑ J Septic Tank System ❑ ❑ _ K1 Controlled Discharge Pond ❑ ❑ _. K2 Aerated Pond ❑ ❑ K3 Anaerobic Lagoon ❑ ❑ L Setting Tanks ❑ ❑ M Fixed Film Reactor-Stationary Media ❑ ❑ N Rotating Biological Contactor ❑ ❑ 0 Aeration Tanks or Basins ❑ ❑ P Gas Chlorination ❑ ❑ Q Sludge Digestion and Holding ❑ ❑ R1 Sludge Dewatering and Disposal ❑ ❑ R2(A&B) Low Rate Land Application of Sludge ❑ ❑ R3 Land Application of Sewage Sludge(To be developed) ❑ ❑ S Land Application of Wastewater(To be developed) ❑ ❑ Sewage Treatment Agreement Q ❑ Identify any categories included in this project which are not provided in the above list of schedules. 11/2015 cmc DNR Form 542-3129;28A Iowa Department of Natural Resources DNR USE ONLY D Wastewater Section Project No. Construction Permit Application Permit No. SCHEDULE C, Lateral Sewer Extension Date Prepared Project Identity 9/24/2021 Clark Steet Utilities Extension Date Revised 1. Design Basis Initial Design Year (2031) Residential Service Area Acres Acres Population 10 Persons 15 Persons Flow(100 GPCD) GPD GPD BODS(0.17/#/d/cap) #/day #/day Industrial Service Area 2.78 Acres 2.78 Acres Rated Flow 100 GPD 150 GPD BODS 1.7 #/day 1.7 #/day Other 0 Acres 0 Acres Rated Flow 0 GPD 0 GPD BODS 0 #/day 0 #/day Total BODS 1.7 #/day 2.55 #/day Total Flow 100 GPD 150 GPD Peak Hourly Flow 100 GPD 150 GPD 2. Pipe Diameter 8 Inch 10 Inch 12 Inch Material TRUSS Joint Elastomeric Minimum Slope 0.40 % % % Maximum Manhole Space 238 ft. ft. ft. Total Sewer Length 238 ft. ft. ft. Maximum Cover 10.5 Minimum Cover 6 3. Construction specifications(indicate ASTM Number or other standard included in the specifications).A brief description is required in each part. A. Bedding class Section 02222 pg.3 Part 2.2 Bedding B. Pipe laying Section 02728 pg. 6 Part 3 Execution C.Compaction Section 02222 pg.7 Part 3.8 Backfill D. Manhole Section02728 pg.3 Manholes E.Specified maximum infiltration/exfiltration rate lowas Wasterwater Design Standard 200 GPDPMPI F. Infiltration/exfiltration test procedures Section 02728 pg.7 Part 3.5 Tests G.Alignment&grade test procedures (1) During construction Stake&batterboard Laser Sec.02728 pg.4 Part 3.2 (2)After construction Lamping Other H. Deflection test procedures Section 02728 pg.7 Part 3.5 Tests 4.Are detailed manhole drawings included: ®Yes ❑ No Typical frame and cover assembly Neenah R 1643 Are manhole covers nonvented: ®Yes ❑ No Manhole diameter 48 in. Manhole opening diameter 24 In Material Reinforced Concrete 5. Minimum sewer&water main separation: Horizontal 10 ft. Vertical 18 in. Are specifications included Section 02728 Page 7 Part 3.3 Potable Water and Sewer Conflict 6.Stream, road,or railroad crossing protection Section 02728 Page 7 Part 3.4 Are specifications included Yes 11/2015 cmc DNR Form 542-3096;28C Iowa Department of Natural Resources Wastewater Section Construction Permit Application Sewage Treatment Agreement INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a private subdivision connecting to a municipal system.This agreement must be executed by the parties who are owners at the time the permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists;i.e.,service contracts between municipalities. However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER Owner: 3 Stooges, LLC Firm: VJ Engineering 1501 Technology Parkway,Ste 100 Address: PO BOX 203,Waterloo, IA 50704 Address: Cedar Falls, IA 50613 Representative: Tony Fischels Project Officer: Daniel Arends Phone Number: 319-415-8870 Phone Number: 319-266-5829 Project Identification: Clark Street Utilities Extension _ Owner and System Receiving Wastes: City of Waterloo-Waterloo Wastewater Treatment Plant CERTIFICATION I am the authorized representative of the owner identified above and state that the proposed sanitary sewage facilities shall be constructed in accord i th ans and specifications and all wastes contributed by this project shall be discharged to the treatment syst v Signature _ Title: Date AGREEMENT TO PROVIDE SEWAGE TREATMENT I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary sewage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 4558,Code of Iowa,and the rules of the Department of Natural Resources.This agreement shall be construed in any way to affect any local ordinances, sewer service agreements,or fee systems entered into between the parties. Name: Quentin Hart Title: Mayor Signature GZ"e-,i`["' Har4 Date 10/18/2021 Phone: 11/2015 cmc DNR Form 542-3219;29