Cardinal Construction CO#9 - 5 Sullivan Bros Penthouse Chiller - 11.1.21
AFV I T Document G701Ty - 2017 Change Order PROJECT: (None and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 5 Sullivan Brothers Convention Center Contract For: General Construction Change Order Number: 009 Penthouse Chiller for the City of Project No. 19-23141 Waterloo, IA. Date: March 27, 2020 Date: October 14, 2021 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (N me and address) City of Waterloo i & S Group, Inc. (iSG) Cardinal Construction. Inc. 715 Mulberry Street 314 East4th Street 1246 Martin Road Waterloo, IA 50703 Waterloo, IA 50703 Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description ofthe change and, if applicable, attach or reference speck exhibits. Also include agreed npwr adjustments attributable to executed Construction Change Directives) A. Cost for As-Built drawings. ,,, ., ,',, I'll I Pistil 1 111111*4 1*1141* 11*01 ,, pow l,W04 I *I P,..... .4Add $39000.00 REDUCE SPECIFIED AS-BUILT ALLOWANCE FROM $3,000.00 TO ZERO, CONTRACT SUM REMAINS UNCHANGED FOR THIS PORTION OF THE CHANGE ORDER, B. COR 10: Cost for adding the hydronic testing and balancing 1'or AHU 1 , 2 and 5 ... .. ... . .. . ... .Add $15094.51 REDUCE SPECIFIED ROOF ASBESTOS ABATEMENT ALLOWANCE FROM $1,612.92 TO $518941 CONTRACT SUM REMAINS UNCHANGED FOR THIS PORTION OF THE CHANGE ORDER, kkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk%% Yk4Y%Wt:tkfkk**kkk-:. kk#k%:Ytxk% k% Ykkk kk% % kkkkR*kkkkk#kkk**% kt C. Credit to Owner for remaining balance of unused Roof Asbestos Abatement Allowance.... . ..Deduct ($515.41) REDUCE REMAINING BALANCE OF ROOF ASBESTOS ALLOWANCE FROM $518.41 TO ZERO. CONTRACT SUM REDUCED DOWN BY ($518.41 ). The original Contract Sum was $ 1 , 1 141000.00 The net change by previously authorized Change Orders $ 265865.08 The Contract Sun prior to this Change Order was $ 1114005.08 The Contract Sam will be decreased by this Change Order in the amount of $ 51 SAL � The new Contract Sum including this Change Order will be $ 1 , 140,346.67 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be August 7, 2020, NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. AIA Document (3701 " . 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:43:19 ET on 10/14/2021 under Order No.9281462824 which expires on 07/12/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentse Terms of Service. To report copyright violations, e-mail copydght@aia.org. User Notes: (3B9ADA4D) NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc.(ISG) Cardinal Construction,Inc. City of Waterloo ARCHEI CT(Fi�nr name) T ACTOR(Finn name) OWNER(IFirm name!} /`G// � C�.aii-flit Hc.r-t :un SIGNATURES ATURE SIGNATURE Nathan Compton,Architect/Project Katy Susong,President Quentin Bart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE October 14,2021 10/18/21 11/1/2021 DATE DATE DATE AIA Document 0701'"—2017,Copyright b 1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document 2 was produced by AIA software at 16:43:19 ET on 10/14/2021 under Order No.9281482824 which expires on 07/12/2022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3139ADA4D)