HomeMy WebLinkAboutCedar Valley Construction Co., LLC - CO#2 Pavement East Passenger Terminal Apron - 11.15.2021 CHANGE ORDER NO. 2
Owner: Waterloo Regional Airport, City of Waterloo,Iowa Date: October 28,2021
Project: Reconstruct West Terminal Apron& Clean/Reseal Joints East Terminal Apron,
Reconstruct Taxiway B East of Runway 18/36 and Tree Removals
Reconstruct Taxiway C South of Runway 12/30 Runway Safety Area
Owner's Contract No. FAA AIP Project No.3-19-0094-046
Contractor: Cedar Valley Construction Co.LLC
Date of Contract Start: April 6,2021
You are directed to make the following changes in the Contract Documents. Description:
Item Description Unit Unit Price Quantity Amount
No.
100 Partial Depth Patching,Finished SF $110.00 90 $9,900.00
101 Mobilization for Partial Depth Patching LS $3,300.00 1 $3,300.00
i
I
Total Change Order $13,200.00
Reason for Change Order:
Patching needed within East Terminal Apron to allow for proper joint sealing.
ALO FAA AIP 3-19-0094-047 CO-2 Project No—60642636
1
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $ 4,116,725.00 Original: 150
Previous C.O.s(DEDUCT):$ 336,220.00 Previous C.O.s (ADD): 0
This C.O. (ADD): $ 13.200.00 This C.O. (ADD): 4
Contract Price with all REVISED: 154
approved Change Orders: $ 4,466,145.00
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time
allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: Z?awcZl' 3. 10/28/2021
Engineer(Authorized ignature) Date
APPROVED:
By: GZ -k„ H14 11/15/2021
Owner(Authorized Signature) Date
ACCE D:
By: 1
Conti or(Authorized Signature) Date
ALO FAA AIP 3-19-0094-047 CO-2 Project No—60642636