Loading...
HomeMy WebLinkAboutAECOM - Professional Services Agreement - FY22 Hangar 4 Improvements - 12.20.2021 AECOM 319-232-6531 tel PECOM 501 Sycamore Street 319-232-0271fax Suite 222 Waterloo,Iowa 50703 www.aecom.com FY 2022 VERTICAL INFRASTRUCTURE PROJECT IDOT PROJECT NO. 91220AL0200 IDOT CONTRACT NO. 3345 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description -See Attachment Scope of Services -See Attachment Compensation Compensation for services for this project shall be a cost plus fixed fee not-to-exceed Thirty-Seven Thousand Five Hundred Dollars ($37,500.00). See attached Exhibit B, Consultant Cost Summary. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. ("ATS") and the City of Waterloo ("Client") dated February 4, 2020. APPROVED: APPROVED: CITY OF WATERLOO, IOWA AECOM TECHNICAL SERVICES, INC. By By Quentin M. Hart, Mayor Douglas W. Schindel, P.E. Associate Vice President 12/20/2021 Date Date December 6, 2021 AL=Com SCOPE OF SERVICES FY 2022 VERTICAL INFRASTRUCTURE PROJECT MOT PROJECT NO. 91220ALO200 IDOT CONTRACT NO. 3345 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA I. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2022 Vertical Infrastructure Project. The project identified in the grant is described as follows: Project will provide for continuation of remodel of the Hangar No. 4 main office area. Elements include replacement of HVAC rooftop unit, removal and replacement of the HVAC ductwork, replacement of the suspended ceiling, replacement of fluorescent lights with LED type units, replacement of the electrical wiring and breaker panels for this office area, replacement of the telecom system with new wiring and wall jacks, replacement of the carpet and remodel of the office restroom areas. II. Scope of Services The work to be performed by ATS includes the following tasks: 1. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and interior lighting information will be compiled as background information for the project. 2. Final Design. This task consists of the preparation of the final bid documents for this project, including specifications, drawings (as required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications. This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost. This task consists of the preparation of an estimate of construction cost based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. AL=COM 6. Bid Assistance. This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. Project will be bid as one bid package. 7. Bid Document Interpretation. This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review. This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\Secure—DCS\Administration\AGREE\PROFWLO 2022 IDOT CSVI.doc Exhibit B FY 2022 Vertical Infrastructure Project Waterloo Regional Airport Waterloo, Iowa IDOT PROJECT NO. 91220ALO200 Engineering Services Consultant Cost Summary I. Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 20 $96.75 $1,935.00 Project Professional 88 $72.40 $6,371.20 Staff Professional 64 $52.70 $3,372.80 Professional 0 $31.90 $0.00 CADD Operator II 0 $37.45 $0.00 CADD Operator 1 40 $24.00 $960.00 Senior Technician 0 $43.60 $0.00 Technician 0 $30.35 $0.00 Project Support 24 $36.55 $877.20 $13,516.20 236 11. Payroll Burden and Overhead Costs 130.70% $17,665.67 111. Direct Project Expenses Category Units Rate/Unit Amount Mileage 1200 0.560 672.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 1,000 0.06 60.00 Color Copies 100 0.22 22.00 Plan Copier 50 0.50 25.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 800.00 $1,579.00 IV. AECOM Estimated Actual Costs $32,760.87 Rounded $32,800.00 V. Subcontract Expense $0.00 VI. Estimated Actual Costs $32,800.00 Vi 1. Fixed Fee (15% of Items I & 11) Rounded $4,700.00 Vill. Maximum Amount Payable $37,500.00 Exhibit B Waterloo Regional Airport Waterloo,Iowa MOT PROJECT NO.91220AL0200 Engineering Services Staff Hour Estimate Item Description Senior Project Staff CADD CADD Senior Project No. Prof Prof Prof Prof O erator II O erator I Technician Technician Support Totals 1 Data Collection and Review 2 8 10 2 Final Design 40 40 40 120 3 Final Project S ecifications 2 16 16 34 4 Estimate of Probable Construction Costs 8 8 5 Quality Review 8 8 6 Bid Assistanc 1 8 J236 7 Bid Document Interpretation 8 8 Resident Review 24 9 Project Administration 8 8 Total Design Services 20 88 64 0 0 40 0 0 24