HomeMy WebLinkAboutCardinal Construction Co., - CO #26 - 5 Bros Addition Reno - 12.20.2021 AIA Document G701 Cr-ill Change Order PROJECT:(Name and address) CONTRACT INFORMATION; CHANGE ORDER INFORMATION: Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:026 Addition and Renovation,Waterloo,IA, Project No: 20-23943 Date: September 08,2020 Date:December 10,2021 OWNER:(Name and address) ARCHITECT:(Name and adelres.$) CONTRACTOR:(Name and address) City of Waterloo 1&S Group,Inc,(ISG) Cardinal Construction,Inc. 715 Mulberry Street 3 14 Fast 4th Street 1246 Martin Road Waterloo,to 50703 Waterloo,IA 50703 Waterloo,to 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,ij'applicable,attach or reference specific exhibits.Also include agreed upon adjastinents attributable to evecated Canwraction Change Directives.) A. COR 19: Cost to add 3"roof drain to Skywalk to drain area of Skywalk roof where water is trapped and flowing over the side of the building and into the new intake louver..........................Add ` 6,608.011 TOTAL AMOUNT Or, THIS CIFIANGE ORDER,ADD TO CONTRACT SUM$6,608.00. The original Contract Stan was $ 5,516,300.00 The net change by previously authorized Change Orders $ 421,749.30 The Contract Sum prior to this Change Order was $ 5,938,049,30 The Contract Sum will be increased by this Change Order in the amount of $ 6,608.00 The new Contract Sum including this Change Order will be $ 5,944,657.30 The Contract Time wilt be unchanged by Zero(0)days. The new date of Substantial Completion will be August 22,2021. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc-(ISG) C d' 1 Construction,Inc. City of Waterloo _ ARCHITECT(Firm name) CrIACTOR(Firm name) OWNER(Firm naane) G?-4-, Hina- SIGNATURE SIGNATURE SIGNATURE Nathan Compton,Architect ^� Katy Susoug,President Quentin Hart,Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE 12/20/2021 December 10,2021 December 13,2021 DATE DATE DATE AIA Documant 6701'–2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architecis.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents'are registered trademarks and may not be used wilheut permission,This document was produced by AIA software at 15:19:56 CT on 12110!2021 under Order No.9281462824 which expires on 0711212022,is not for resale,is licensed for one- time use only,and may only be used in accordance with the AIA Contract Documents'Terms of Service,To report copyright violations,e-mail copyright@aia.org. User Notes: (3R9AUA4C)