Loading...
HomeMy WebLinkAboutWoodruff Construction - Five Sullivan Bros. CC Skywalk Improvements Project - 12.20.2021 *I Document G704I 2017 Certificate of Substantial Completion PROJECT: (name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION: 5 Sullivan Brothers Convention Center Contract For: General Construction Certificate Number: 001 2020 Skywalk Improvements, Waterloo, Project No: 19-23770 IA. Date: May 07, 2020 Date: September 09, 2021 OWNER: (name and address) ARCHITECT: (name and address) CONTRACTOR: (name and address) City of Waterloo I & S Group, Inc. (fSG) Woodruff Construction, LLC 715 Mulberry Street 314 East 4th Street 1717 Falls Avenue Waterloo, IA 50703 Waterloo, IA 50703 Waterloo, IA 50701 The Work identified below has been reviewed and found, to the Architect's best knowledge, information, and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated below is the date established by this Certificate. (Identify the Work, a portion thereof, that is subsIanHall) cmnplete.) Substantial Completion Date: November 02,2020 (original contract) - See punchlist. Substantial Completion Date: August 01, 2021 (added scope - Skywalk Leak Issues/Fixes) Nathan Compton, Dated Executed: I @ S Group, Inc. (TSG) Architect/Project Manager September 09, 2021 ARCHITECT (Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION WARRANTIES The date of Substantial Completion of the Project or portion designated above is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: (Identify warranties that do not commence on the date of Substantial Completion, ifany, and indicate their date ofcommencement.) WORK TO BE COMPLETED OR CORRECTED A list of items to be completed or corrected is attached hereto, or transmitted as agreed upon by the parties, and identified as follows: (Identify the list of Work to be completed or corrected.) See attached punclist: ISG The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing; the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment, whichever occurs first. The Contractor will complete or correct the Work on the list of items attached hereto within Thirty (30) days from the above date of Substantial Completion. Cost estimate of Work to be completed or corrected: $2,500.00 (see attached punchlist) The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work, insurance, and other items identified below shall be as follows: (Note: Owner 's and Contractor's legal and insurance counsel should review insurance reguiremen/s and coverage.) The Owner shall be responsible for maintenance, heat, utilities, insurance and damage caused by the Owner's personnel. The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion: AIA Document G7040 — 2017, Copyright© 1963, 1978,. 1992, 2000 and 2017 by The American Institute of Architects, All rights reserved. The "American Institute of Architects; "AIA," the AIA Logo, "G704," and "AIA Contract Documents' are registered trademarks and may riot be used without permission. This document was produced by AIA software at 12:54:19 ET on 09/10/2021 under Order No.9281462824 which expires on 07/1212022, is not for resale, Is licensed for one-time use only, and may only be used In accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA52) Woodruff Construotion, s — Will McAllister,Project Y1z)11e?_1)_.?-.-t LLC � _Manager -- CONTRACTOR(Firm SIGNATURE PRINTED NAME AND TITLE DATE Name) City of Waterloo Quentin Hart,_Mayor 12/20/2021 OWNER(FirmNanme) SIGNATURE PRINTED NAME AND TITLE DATE AIA Document G70491—2017.Copyright® 1963,1978,1992,2000 and 2037 by The American Institute of Architects.Ail rights reserved_The"American Institute of Architects,""AIA,"the AIA Logo,"G704,'and"AIA Contract Documents"are registered trademarks and may not hn used without permission.This 2 document was produced by AIA software at 12:54;19 ET on 09/10/2021 under Order No.9281462824 which expires on 0711212022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentsa Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (389ADA52) Final Punch List ■ Project Name: Five Sullivan Convention Center Skywalk Improvements - City of Waterloo, Iowa Meeting Date: November 2, 2020 Comm No.: 1 IMPORTANT NOTE: The following list of deficiencies shall be signed and returned to our office within 7 days of the above date. All items should be marked corrected unless Itis impossible to do so. If this is the case, we request some explanation for each item that cannot be corrected at this time. Until this final list is corrected, no consideration will be given to approving the release of final retainage. Please check the Yes column for the corrected items and the No column for the items not corrected. 1 Ceiling Patch ceiling adjacent to Door 202B 2 Door 202B Screw holes in continuous hinge 3 Door 2028 Color of continuous hinge 4 Door202B Wall base at adjacent wall 5 Door 2026 Clean up dust 6 Door 2028 Clean paint off of adjacent existing handrails 7 Door202A Affix.wall base B Door202A Doors stuck open 9 Door 202A Color of continuous hinge 10 Door 201A Remove old door stops on walls and patch gypsum 11 Door 201A Adjust closer, door doesn't fully close 12 DOor2OA Clean paint off of existing steel 13 Door 201A Install wall base 14 All Doors Install permanent pulls 15 Roof Install roof drain strainers Architecture + Engineering + Environmental + Planning ISGInc.LOm FINAL PUNCH LIST Project Name: Five Sullivan Convention Center Skywalk Improvements - City of Waterloo. Iowa Meeting Date: November 2, 2020 Comm No.: 16 Roof Pond ingwater by Five Sullivan Brothers - Check Architecture + Engi nn ering * FovlroamemAI + Planning se2 Of I I I