HomeMy WebLinkAboutIowa DNR - Sewage Treatment Agreement - 4/3/2006 Iowa Department of Natural Resources �� �V%
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e.,a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued,regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists;i.e.,service contracts between municipalities.
However,the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT ENGINEER
OWNER FIRM
Young Development,LC WAYNE CLAASSEN ENGINEERING,INC.
ADDRESS ADDRESS
P.O.BOX 1077,WATERLOO,IA 50704 P.O.BOX 898,WATERLOO,IA 50704
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
RICK YOUNG 319-234-4411 WILLIAM J.CLAASSEN,P.E. 319-235-6294
PROJECT IDENTIFICATION
2006 TRENT LANE SANITARY SEWER EXTENSION,WATERLOO,IA
OWNER AND SYSTEM RECEIVING WASTES
CITY OF WATERLOO,IA
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGNATURE TITLE DATE
2— / —oC
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner,and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project,in accordance with the provisions of Chapter 455B,Code of Iowa,and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances,sewer
service agreements,or fee systems entered into between the parties.
SIGNATURE TYPED OR PRINTED NAME
/ Timothy Hurley
TITLE PHONE NUMBER DATE
Mayor 319-#2914301 /'. 3-6'6
DNR form 29(Nov 00) 7 542-3219
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
APPLICANT ENGINEER
OWNER FIRM
YOUNG DEVELOMENT,LC. WAYNE CLAASSEN ENGINEERING AND SURVEYING,
INC.
ADDRESS ADDRESS
P.O.BOX 1077, WATERLOO,IA 50704 P.O.BOX 898,WATERLOO,IA 50704
REPRESENTATIVE TELEPHONE I PROJECT OFFICER TELEPHONE
RICK YOUNG 319-2344411 WILLIAM J.CLAASSEN,P.E. 319-235-6294
PROJECT IDENTIFICATION I ESTIMATED START DATE * ESTIMATED COMPLETION DATE
2006 TRENT LANE SANITARY SEWER EXTENSION 4-01-2006 6-01-2006
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report,facilities plan or other informationreviousl been submitted for this ro'ecV El
[!!!
IfYes=> CT IDENTITY DATE SUBMITTED
2. Does the project and construction permit application,as submitted,follow the recommendations,design N
loadings,construction schedule,permit limits,and conclusions of the approved engineering report or A
facilities plan?
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? X ❑
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standardspecifications a part of this application? X ❑
If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED
(municipality or firm)
CITY OF WATERLOO,IA
5. Does each set of plans and specifications or engineering report accompanying this application contain a X
"professional engineering seal"executed in conformance with 542B.16,Code of Iowa? ❑
If No-->Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project? ❑ X
If Yes=>A construction premit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? ❑ X
If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ X
If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet;or any private or public well,lake,or public recreation area located
within 400 feet of the proposed construction? ❑ X
If Yes=>Identify and locate the facility(s)relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer em to ed by theapplicant? ❑ X
If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
WAYNE CLAASSEN ENGINEERING AND SURVEYING,INC.
11. Will 2Eoject utilize CWS"loan funds? ❑ X
CERTIFICATION
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC
64,or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application,and to the best of my
—t94; knowledge,such information is complete and accurate.
SIGN TURF DATE SIGN r DATE
--0 t-Zs 0k
*Estimated Construction Start Date: Complete applications must be sub ed at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE A,General Information
DOCUMENT CHECKLIST
Identify all categories included in this project. Also,identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDULE TITLE ATTACHED PROJECT DATE
B Collection system X ❑
C Lateral Sewer Extension X ❑
D Trunk&Interceptor Sewer ❑ ❑
E Wastewater Pump Station ❑ ❑
F Treatment Project Site Selection ❑ ❑
G Treatment Project Design Data ❑ ❑
Hl Schematic Flow Diagram ❑ ❑
H2 Treatment Process Loading and ❑ ❑
Removal Efficiency
H3 Mechanical Plant Reliability ❑ ❑
I Screening,Grit Removal and Flow ❑ ❑
Measurement
J Septic Tank System ❑ ❑
KI Controlled Discharge Pond ❑ ❑
K2 Aerated Pond ❑ ❑
K3 Anaerobic Lagoon ❑ ❑
L Setting Tanks ❑ ❑
M Fixed Film Reactor—Stationary Media ❑ ❑
N Rotating Biological Contactor ❑ ❑
O Aeration Tanks or Basins ❑ ❑
P Gas Chlorination ❑ ❑
Q Sludge Digestion and Holding ❑ ❑
RI Sludge Dewatering and Disposal ❑ ❑
R2(A&B) Low Rate Land Application of Sludge ❑ ❑
R3 Land Application of Sewage Sludge ❑ ❑
(To be developed)
S Land Application of Wastewater ❑ ❑
(To be developed)
Sewage Treatment Agreement ❑ ❑
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A(Apr 04) 542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B,Collections stem
DATE PREPARED PROJECT IDENTITY DNR LJSE
02/01/2006 2006 Trent Lane Sanitary Sewer Extension,Waterloo,IA PROJECT NO.
DATE REVISED
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding,state none.
Segment Flooding Protection
N.A. N.A.
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location
8"on W.4s'St
Design capacity,MGD
1.2
Peak Hourly Dry weather Flow
MGD(actual) 0.05
Peak Hourly Wet Weather Flow
MGD(actual) 0.075
*3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water IA 079001 Fed 0042650
Pollution Control Plant
Facility Loading MGD #BODS/day
Design 34.8 88,000
Average Wet Weather(actual) 24.53 31,500 avg da
Peak Hourly Wet Weather(actual) 60+ 48,000 eak day
Provide projected design loading increase,which will be added to this facility as a result of this project.
Design Loading Initial DesignYe (2007 )
Residential service area 0 Acres 5.5 Acres
Population 0 Persons 68 Persons
Flow(100 GPCD) 0 GPD 6,800 GPD
BODS(0.17#/d/cap) 0 #/day 11.56 #/day
Industrial service area 0 Acres 0 Acres
Rated flow 0 GPD 0 GPD
BODS 0 #/day 0 #/day
Other 0 Acres 0 Acres
Rated Flow 0 GPD 0 GPD
BODS 0 #/day 0 #/day
Total BODS 0 #/day 11.56 #/day
Total Flow 0 GPD 6,800 GPD
Peak Hourly Flow 0 GPD 27,200 GPD
* Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
DNR form 28B(Nov 00) 542-3095
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C,Lateral Sewer Extension
DATE PREPARED PROJECT IDENTITY DNR USE
02-01-2006 2006 TRENT LANE SANITARY SEWER EXTENSION,WATERLOO,IA PROJECT NO.
DATE REVISED
PERMIT NO.
L Design Basis Initial Design Year(2006)
Residential service area 0 Acres 5.5 Acres
Population 0 Persons 68 Persons
Flow(100 GPCD) 0 GPD 6,800 GPD
BOD5 (0.17#/d/cap) 0 #/day 11.56 #/day
Industrial service area 0 Acres 0 Acres
Rated Flow 0 GPD 0 GPD
BODS 0 #/day 0 #/day
Other 0 Acres 0 Acres
Rated Flow 0GPD 0 GPD
BODS 0 #/day 0 #/day
Total BODS 0 #/day 11.56 #/day
Total Flow 0 GPD 6,800 GPD
Peak Hourly Flow 0 GPD 27,200 GPD
2. Pipe
Diameter 8 Inch 8 Inch 12 Inch
Material PVC TRUSS PVC DR 18
Joint ELASTOMERIC ELASTOMERIC
Minimum Slope 2.0 % 0.63 % %
Maximum Manhole Space 178.6 ft. 390 ft. &
Total Sewer Length 190 ft.. 462 ft. ft.
Maximum Cover 11.5 ft. 11.5
Minimum Cover 7.5 ft. 5.5
3. Construction specifications(indicate ASTM No.or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class CLASS IA,95%STD PROCTOR
B. Pipelaying ASTM D3034,D2321,AWWA C-900 WATERLOO STD SPECS
C. Compaction ASTM D698
D. Manhole ASTM C476,C443
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures LOW PRESSURE AIR
G. Alignment&grade test procedures
(1) During construction: Stake&batter board Laser X
(2) After construction: Lamping Other TV
H. Deflection test procedures GO-NO-GO MANDREL
4. Are detailed manhole drawings included: Yes X No ❑
Typical frame and cover assembly DEETER 1268,NEENAH
R-1643
Are manhole covers nonvented: Yes X No
Manhole diameter 48 in.
Manhole opening diameter 24 in. Material PRECAST PCC&CAST IRON
5. Minimum sewer&water main separation: Horizontal 8 ft. Vertical 0 in.
Are specifications included? YES
6. Stream,road,or railroad crossing protection NA
Are specifications included? NA
DNR form 28C(Nov 00) 542-3096