Loading...
HomeMy WebLinkAboutPlumb Tech, Inc. - CO#1 Ridgeway Tower Boiler Replacement - 1.18.22co, = 4-- Document G701 - 2017 Change Order PROJECT: (Name and address) Ridgeway Tower Boiler Replacement OWNER: (Name and address) Waterloo Housing Authority 620 Mulberry Street, Salle 102 Waterloo, IA 50703 CONTRACT INFORMATION: Contract For General Construction Date: 11/22/2021 ARCHITECT: (Name and address) MODUS Engineering 214 East 4th Street Waterloo, lA 50703 CHANGE ORDER INFORMATION; Change Order Number: 001 Date: 11/22/2021 CONTRACTOR: (Name and address) Plumb Tech Inc. 3261 West Airline Hwy Waterloo,1A 50703 THE CONTRACT IS CHANGER AS FOLLOWS: (Insert a detailed description of the change and (jappllcable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Removal of the remaining unused allowance ($5,000) that was included in the bid. The original Contract Sum was $ 105,968.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 105,968,00 The Contract Sum will be decreased by this Change Order in the amount of $ 2,483.00 The new Contract Sum including this Change Order will be $ 103,485.00 The Contract Tine will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. MODUS ARC I jtT CT,{Fin rizane) Plumb Tech Inc, C • NTRACTOR (Firm name) S1eNAYtIRE SIGNATURE cw 1s �7 /47.FILACIS Jacob Connor, PE, Director PRINTED NAME AND TITLE PRINTED NAME AND TITLE 12/6)2022 DATE DATE City of Waterloo Waterloo Housing Authority OWNER (Ffr,n name) SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 1/18/2022 DATE Kerrey TeCcl(e SI SIGNATURE Kelley Felchle, City Clerk PRINTED NAME AND TITLE 1/18/2022 DATE �uQie 1)a.w5o14.- SIGNATURE Julie Dawson, Executive Director PRINTED NAME AND TITLE 1/18/2022 DATE AIA I7ooument G701- - 2017. Copyright 01070, 1987, 2000. 2001 and 2017 by The American institute of Architects. All rights reserved. The "American Institute of Archilo iS, "AIA," the AIA Logo, and 'AIA Contract Documents' are registered trademarks and may not be used without permission. This document was produced by ALA software et 14;5e:08 ET an 11/29/2021 under Order No.0099029435 which expires on 01/07/2022. le not for resale, Is licensed for one-time UM only, and may only be used In accordance with the AIA Contract Documents° Terms of Service, To report copyright violations, email eopyrlght@ele.erg, User Notes: (309A0A53) 1