Loading...
HomeMy WebLinkAboutWoodruff Construction - CO #5 FY20 Wastwater Treatment Plant, Cont. No. 994 - 1.18.2022,...•47A'' STRAND mil ASSOCIATES° EXCELLENCE IN ENGINEERING December 31, 2021 Mr. Brian Bowman City of Waterloo 3505 Easton Avenue Waterloo, IA 50702 Re: F.Y. 2020 Wastewater Treatment Plant Biosolids Modifications Project Contract No. 994 City of Waterloo, Iowa (City) Dear Brian, Strand Associates, Inc.® 910 West Wingra Drive Madison, WI 53715 (P) 608.251.4843 Change Order No. 5 for the Contract with Woodruff Construction related to the above -referenced project is enclosed. This change order captures several modifications to the original Contract resulting in an addition of $55,566.00 to the Contract price. In addition, this change order also results in a change to the completion date of the project because of impacts to the supply chain from COVID-19 in early 2021, resulting in a delay to the procurement of equipment and construction materials. As of Woodruff Construction's most recent pay request for the period ending on November 30, 2021, this project is 88.1 percent complete with 84 percent of the Contract time elapsed. The total value of changes to the original Contract price are summarized in the following table. Change Order Amount Nos. 1, 2, 3 and 4 ADD $78,735.10 No. 5 ADD $55,566.00 Total ADD $134,301.10 The current change in the Contract price is 0.8 percent of the original Contract value. Please call 608-251-4843 if you have any questions. Sincerely, STRAND ASSOCIATES, INC.® Samuel K. Hocevar Enclosure SKH:tII\S:\MAD\4400- 4499\4463\009\Constmction\Change Orders\005\CO 5 Cover Letter.docx Arizona I Illinois I Indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com of EXCELLENCE IN ENGINEERING December 20, 2021 CHANGE ORDER NO. 5 PROJECT: OWNER: CONTRACT: CONTRACTOR: heii STRANDASSOCIATE® Strand Associates, Inc 910 West Wingra Drive Madison, WI 53715 (P) 608.251.4843 F.Y. 2020 Wastewater Treatment Biosolids Modifications Project City of Waterloo, Iowa City Contract No. 994 Woodruff Construction, LLC Description of Change 5a Provide galvanized plate lintels at the four overhead door openings in Structure 330 in accordance with the enclosed cost proposal dated July 26, 2021. 5b Provide gate valve in new 4-inch W2 line in Structure 170 and gate valve in new 4-inch W2 line in Structure 190 in accordance with the enclosed Cost Proposal Request (CPR) 013 dated August 17, 2021. 5c Provide bearing plate for the insulated metal panel at the far southwest end of Structure 330 in accordance with the enclosed cost proposal dated October 1, 2021. 5d Provide identification for process interconnections piping and equipment in accordance with the enclosed CPR 014 dated August 26, 2021. 5e Provide modifications to storm piping near Structure 350 in accordance with the enclosed cost proposal dated September 27, 2021. 5f Provide partial demolition of abandoned tank walls northwest of Structure 190 in accordance with the enclosed CPR 016 dated September 7, 2021. 5g Amend Contract Substantial Completion date and Contract Final Completion date for time lost for construction material procurement as a result of COVID-19 impacts on manufacturing and supply chains TOTAL VALUE OF THIS CHANGE ORDER: ADD Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order SKH:II\S:\MAD\4400--4499\4463\009\Construction \Change Orders\005\CO 5.docx ADD ADD ADD ADD ADD ADD ADD $6,804.00 $7,855.00 $3,239.00 $21,036.00 $6,961.00 $9,671.00 $0.00 $55,566.00 $16,587,300.00 $78,735.10 $55,566.00 $16,721,601.10 Arizona 1 Illinois I Indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com Strand Associates, Inc.r City of Waterloo, Iowa —Woodruff Construction, LLC Contract 994, Change Order No. 5 Page 2 December 20, 2021 Contract Substantial Completion Date Adjustment Original Contract Substantial Completion Date Contract Substantial Completion Date Adjustments due to previous Change Orders Contract Substantial Completion Date Adjustments due to this Change Order Current Substantial Contract Completion Dates including all Change Orders Contract Final Completion Date Adjustment Original Contract Final Completion Date Contract Final Completion Date Adjustments due to previous Change Orders Contract Final Completion Date Adjustments due to this Change Order Current Final Contract Completion Dates including all Change Orders oitiiii `. . roN�,f��This document shall c) •••� •ECOMME IDED _, : RANDALL A. ' 0:: _ z • WI RTZ m fry :-. 1E137 . GINEER—Strand Asso es, Inc �u Date �-j , • January 2, 2022 47 Days 37 Days March 27, 2022 March 3, 2022 47 Days 37 Days May 26, 2022 become a supplement to the Contract and all provisions will apply hereto. CON 2 ACTO €—Woodruff Construction, LLC APPROVED OWNER —City of Waterloo, Iowa SKHaII\S:\MAD\4400-4499\4463\009\Constmction\Change Orders\ 005 \CO 5,docx i/3'7, Zj 12/21/21 Date 1/18/2022 Date www.strand.com