Loading...
HomeMy WebLinkAboutPeterson Contractors, Inc. - CO #7 - FY21 Shaulis Rd, Cont. No. 1020 - 12/20/2021HRGreen HR Green, Inc. 8710 Earhart Lane S.W. Cedar Rapids, IA 52404 (319) 841-4000 FAX (319)841-4012 CHANGE ORDER Distribution: Owner X Engineer X Contractor X Field Other PROJECT: Waterloo, IA Shaulis Road Reconstruction — Hess Road to US-218 Change Order No. 07 Date December 13, 2021 To Contractor: Peterson Contractors, Inc. 104 Black Hawk Street Reinbeck, IA 50669 Project No. 190428.04 Original Contract Date May 17, 2021 This Change Order includes the following: (1) Temporary ACC Paving - $51,606.14 (2) Temporary Paving - $2,553.00 (3) Modified Subbase Safety Shoulder- $6,822.66 (4) Pavement Marking Removal - $875.00 (a) Temporary Painted Pavement Markings - $5,892.54 (6) Temporary Painted Symbols and Legend - $714.00 (7) Additional Paint Mobilization - $2,550.00 (8) Additional Divertors Winter Rental - $1,989.00 (9) Stop Sign Installation - $1,759.50 (1o) Spring 2022 Traffic Control Mobilization - $3,034.50 (Hi) Pavement Removal - $5,212.00 The original Contract Sum was $8,715,769.61 Net change by previously authorized Change Orders ($3,150) The Contract Sum prior to this Change Order was $8,718,919.61 The Contract Sum will be increased by this Change Order in the amount of $83,008.33 The new Contract Sum including this Change order will be $8,798,777.94 The Contract Time will be (decreased) by 0 The date of Substantial Completion as of the date of this Change Order therefore is September 21, 2021 The date of Final Completion as of the date of this Change Order therefore is September 15, 2023 NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE, if applicable, AND OWNER Contractor Peterson Contractors, Inc. Owner's Representative HR Green, Inc. Owner City of Waterloo, IA By oigieiyigneeevChris a Fies_rar Chris 0. Fleshnsr E=cneshner@pcius.corn, By Byoi_a_s2AA.......-Atts,By Date. 204202 ov Date: 142B1�fi"0' Date: Date: I Z. / � /� z, 1 Date: CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 07 PROJECT: Shaulis Road Reconstruction Project , CONTRACT NO. RM-8155(772) — 9D-07 Date Prepared: 12-13-2021 AMOUNT: $83,0008.33 Participating TO: Peterson Contractors Inc , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 04/29/2021. A. Description of change to be made or extra work to be done: (1) Temporary ACC Paving (2) Temporary Paving (3) Modified Subbase Safety Shoulder (4) Pavement Marking Removal (6) Temporary Painted Pavement Markings (6) Temporary Painted Symbols and Legend (7) Additional Paint Mobilization an Additional Divertors Winter Rental (s) Stop Sign Installation (10) Spring 2022 Traffic Control Mobilization (11) Pavement Removal B. Reason for ordering change or extra work: Temporary Paving and Traffic Control for Winter 2021-2022 C. Settlement for cost of work to be made as follows: Participating $83,008.33 CITY OF WATERLOO, IOWA APPROVED: Total Net Increase $83,008.33 Digitally signed by Chris D. Fleshner DN: C=US, E=cfleshner@pcius.com, Chris D. FFIeshnercN=chrisFleshnsr Date: 2022.02.07 14:28:32-06'00' CONTRACTOR BY: Chris D. Fleshner 2-7-22 City Engineer Date Date Project Manager TITLE: EZEt1. PETERSON CONTRACTORS, INC. srra aHM.\�RS K. EXTRA WORK AUTHORIZATION =+"►.' �x 1. It EIABECA IOWA PO Box A Phone: 319-345-2713 Reinbeck, Iowa 50669 Fax: 319-345-2991 www.petersoncontractors,com Project Name: Shaulis Road Reconstruction PCI Job# J9215 Date: 12/08/21 Extra Work Autorization # Remarks or Description of Extra Work: PCI has been asked to provide an estimate of the cost to temperarily open the roadway for the winter of 2021-2022. Please note PCI has reduced the typical 10% Mark up to 2% to just cover bonding costs. Item # Description Quantity Units Base Unit Rate % Mark Up % Discount Adjusted Unit Rate Total Amount 1 Temporary ACC Paving 1,257.00 SY $40.25 2.00% 0.00% $41.06 $51,606.14 2* Temporary Paving 46.00 SY $55.50 0.00% 0.00% $55.50 $2,553.00 3 Modified Subbase Shoulder 552.80 TN $12.10 2.00% 0.00% $12.34 $6,822.66 4* Pavement Marking Removal 2.50 STA $350.00 0.00% 0.00% $350.00 $875.00 5 Temporary Painted Pavement Markings 106.00 STA $54.50 2.00% 0.00% $55.59 $5,892.54 6 Temporary Painted Symbols and Legends 4.00 EA $175.00 2.00% 0.00% $178.50 $714.00 7 Additional Paint Mobilization 1.00 LS $2,500.00 2.00% 0.00% $2,550.00 $2,550.00 8 Additional Divertors Winter Rental 1.00 LS $1,950.00 2.00% 0.00% $1,989.00 $1,989.00 9 Stop Sign Installation 3.00 EA $575.00 2.00% 0.00% $586.50 $1,759.50 10 Spring 2022 Traffic Control Mobilization 1.00 LS $2,975.00 2.00% 0.00% $3,034.50 $3,034.50 11* Pavement Removal 1,303.00 SY $4.00 0.00% 0.00% $4.00 $5,212.00 0.00% 0.00% $0.00 $0.00 Total Amount: $83,008.33 The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract. Work Authorized and Changes Approved by: Prime Contractor or Owner: Peterson Contractors, Inc. By: By: Chris D. Fleshner Title: Dale: Date: 12/8/2021