Loading...
HomeMy WebLinkAboutBlackhawk Roofing Company - CO #2 - FY21 Young Arena Roof Project, Cont. No. 1040 - 2.7.2022SULTANTS CHANGE ORDER NO. 2 CONTRACTOR: Blackhawk Roofing Company 619 E. 19th Street Cedar Falls, Iowa 50613 OWNER: City of Waterloo Waterloo Leisure Services 1101 Campbell Avenue Waterloo, Iowa 50703 THE CONTRACT SHALL BE CHANGED AS FOLLOWS: PROJECT: FY2021 Young Arena Southeast and Southwest Roof Replacement Project Contract No. 1040 125 Commercial Street Waterloo, Iowa 50703 PROJECT NO: 20WATWATER003C 1. Credit for not installing a new continuous metal cleat at approximately 350 feet of new metal coping cap, deduct $1,312.00. See attached email. 2. Bid allowance adjustment: Remove and replace wood nailer, 200 board foot allowance at $3.00 per board foot, allowance not used, deduct $600.00. 3. Bid allowance adjustment: Remove and replace plywood, 64 square foot allowance at $3.00 per square foot, allowance not used, deduct $192.00. 4. Bid allowance adjustment: Remove and replace steel decking, 100 board foot allowance at $10.00 per square foot, allowance not used, deduct $1,000.00. 5. Bid allowance adjustment: Wire brush, clean and prime paint surface rusted steel decking, 100 board foot allowance at $3.50 per square foot, allowance not used, deduct $350.00. JUSTIFICATION: 1. During the final inspection, it was noted that the continuous metal cleat was not replaced as specified, since the existing cleat was in good condition and the fasteners used to attach the new membrane penetrated through the metal cleat, adding additional fasteners to the attachment of the existing cleat. It was requested that Blackhawk Roofing Company provide the above credit. 2. Price changes items 2 - 5 are adjustments for unused allowances that were included in the contract. OWNER: ORIGINAL CONTRACT SUM $116,400.00 PREVIOUS CHANGE ORDERS $48, 361.00 CURRENT CONTRACT SUM $164,761.00 THIS CHANGE ORDER ($3,454.00) NEW CONTRACT SUM $161,307.00 SCHEDULE CHANGE IN CALENDAR DAYS Unknown City of Waterloo DATE: 2/7/2022 CONSULTANT 4 CONTRACTOR: Jason Hackman, RRO Mike Kerker benchmark, Inc. DATE: January 4, 2022 Blackhawk Roofing DATE: 1/5/22 6065 Huntington Court NE I Cedar Rapids, IA 52402 2110 Pewaukee Road, Suite D • Waukesha, WI 53188 319.393.9100 319.393.3994 fax 319.393.9100 262.549.1308 fax benchmark-inc.com