Tim Shea, Superintendent of Waste Management Services, updated the coun
Interceptor Corrosion Project. Staff and Bob Bamsey of Earth Tech
alternatives to complete the last 1,100 square feet of the project. Alt
replacing the total line, installing plastic liner and installing four manhol
recommending that four manhole covers be installed at a cost of $122,
manhole covers from a previous project and cleaning and replacing the line
Once the Environment Protection Agency approves using the funds for the
order for an increase of $122,500.00 will be brought back to the council for ap
Tim Shea, Superintendent of Waste Management Services, updated the coun
Interceptor between East 6th and East 11th Streets. The interceptor covers E
downtown to Fay Street on the west side of the flood control dike berm.
development in the area, and this interceptor currently serves most of the E
explained any time there is water, they have a hard time controlling it, and t
key part of the system. Staff anticipated at some time to move it to the dry
There is $6 million pipeline from 6th Street to the river crossing, and the p
shape. The pipe is 48" to East 11 th Street and then goes to 45". This area ha
the Capital Improvement Project for long-term funding.
il on the Satellite
ooked at several
rnatives included:
covers. Staff is
00.00, using two
with plastic liner.
project, a change
royal.
With no further business before the council, it was moved by Welper, second
meeting be adjourned at 4:46 p.m. Ayes: Seven. Motion carried.
Nancy Eckert
City Clerk
il on the Eastside
st 6th Street from
here is proposed
stside. Mr. Shea
is interceptor is a
side of the berm.
pe is not in great