Loading...
HomeMy WebLinkAbout09.25.2000• • COUNCIL WORK SESSION September 25, 2000 3:05 p.m. Council Chambers Members present: Getty, Anders, Jordan, Gronen, Berry. Members absent: Krizek, Murphy. Moved by Jordan, seconded by Getty that the Agenda, as proposed, be approved. Ayes: Five. Absent: Krizek, Murphy. Motion carried. Change Order No. 1 for a net increase of $369,300.00 for work to be performed by Story Construction Company in conjunction with the Anaerobic Digester Project was reviewed. The change order incorporates the Anaerobic Lagoon emergency generator building, standby generator, gas blower controls and cover controls improvement into the Water Pollution Control Facilities, Contract No. 550. Bids received earlier this year for the work were approximately 75 percent higher than the engineer's estimates. In order to reduce overall cost, some of the controls and radio telemetry work was deleted and will be performed by Water Pollution/Flood Control star The work included in Change Order No. 1 is necessary to provide standby power for the Anaerobic Lagoon in the event of power outages in order to keep the raw wastewater pumps, gas controls and lagoon cover functioning properly. The rest of the controls and telemetry system work, being jointly performed under Change Order No. 1 and plant staff, will allow continuous monitoring of lagoon operations from the WPCF site, which will enable staff to respond quickly to developing operational situations or emergencies at the lagoon. With no further business before the council, it was moved by Jordan, seconded by Berry that the meeting be adjourned at 3:10 p.m. Ayes: Five. Absent: Krizek, Murphy. Motion carried. Nancy Eckert City Clerk