Loading...
HomeMy WebLinkAboutLangman Construction - CO #1 - 2.21.2022CHANGE ORDER NO. 1 Owner City of Waterloo Date January 27, 2022 Project US Highway 63 Sanitary Sewer Upgrades, Phase I Owner's Contract No. City Contract No.1037 Contractor Langman Construction Inc. Date of Contract Start October 18, 2021 $ 7,190,038.90 You are directed to make the following changes in the Contract Documents. Description: Realign the sanitary sewer from MH 2 to MH 10, install the sanitary sewer pipe which crosses Ansborough Avenue using open cut methods and remove the remaining pipe borings and install them using open cut methods. Reason for Change Order: Langman Construction proposed the removal of the pipe boring, including Ansborough Avenue, which will result in a significant cost savings for the project. After a review of the proposal by AECOM and City staff it was determined this proposal was acceptable. A minor realignment is required between MH 2 and MH 10 to allow for the open cut methods to be utilized in lieu of boring. A new bid item for open cut pipe installation at Ansborough Avenue will be added to cover the extra cost of this installation. Additional rock, temporary surfacing, utility conflicts, traffic control and traffic signal work are unique to this location and create a higher unit cost for the pipe installation. An additional bid item for modified tee manholes will be added to replace the two (2) 120-inch diameter manholes proposed at Manhole 2 and Manhole 8, an additional item for Class E Revetment will be added for erosion control at the open cut pipe installation at the existing drainageways and three trees will also be added to replace trees removed due to construction. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $7,190,038.90 Original Completion Date: Previous CO's (ADD/DEDUCT): $ Previous CO's (ADD/DEDUCT): This CO (ADD/DEDUCT): $ (380,516.00) This CO (ADD/DEDUCT): Contract Price with all REVISED: approved Change Orders: $6,809,522.90 Nov. 18, 2022 28 Days Revised Completion Date: Dec. 16, 2022 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: By: OWNER (Author. Signature) Date 2/21/2022 ACCEPTED: By: CONTRACTOR (Authorized Signature) AECOM, Inc. 60651387 / 1 Project Change Number Order No. Change Order Form AECOM 60671367 Page Co-1