Loading...
HomeMy WebLinkAbout01.19.1999COUNCIL WORK SESSION January 19, 1999 4:15 p.m. Council Chambers Members present: Getty, Jordan, Krizek, Anders, Murphy. Members absent: Gronen, Collier. Moved by Jordan, seconded by Anders that the Agenda, as proposed, be approved. Ayes: Four. Absent: Murphy, Gronen, Collier. Motion carried. The departmental equipment/vehicle inspections that were held in September/October 1998 were reviewed by Larry Cunningham, Superintendent of Central Garage. Mr. Cunningham reviewed the vehicle./equipment inspection of the Street Department, Sanitation Department, Water Pollution/Flood Control Department, Parks Department, Police Department, Traffic Operations, Engineering and Building Inspection Departments. Mr. Cunningham gave a general overview of the inspections and proposed capital equipment list. The inspections provided a detailed overview not only of equipment but of personnel and departmental functions. The inspections show that although the city has made progress in the last four to five years, there are still improvements that need to be made. The inspections show that the average city employee is a conscientious worker who does take pride in his/her work and equipment and makes an effort to maintain their equipment. During the 1980s the city did minimal replacement on the equipment. Consequently, the condition of the fleet deteriorated and aged rapidly. Oftentimes the city was in the position of having to replace equipment by crisis rather than by schedule. The last five years have seen an improvement as this administration has worked diligently to provide outstanding service to the public and to equip city crews with newer equipment. The John Deere lease program is going to fully equip the operational departments. The five year cycle will provide excellent equipment at all times and will eliminate major repair bills due to failure of the old, obsolete equipment. The inspections showed that the yard waste/leaf collection operation needs to be analyzed for future equipment needs. If the city continues to provide the yard waste/leaf program, it will be necessary to look at purchasing new equipment. The city is on its way of achieving the schedule goals and maintenance of the schedule will achieve a replacement cycle that provides the proper equipment at the proper time. Mr. Cunningham would like to establish cycles of seven years for cars and pick ups, except marked police cars which are ideally on an 18 month turn around. Dump trucks, garbage trucks, street sweepers and like equipment would generally be on a seven to nine year cycle. Heavy equipment on the lease program will cycle in five years. Murphy now present at 4:55 p.m. Bruce Meisinger, Finance Manager, reviewed an agreement with McGladrey & Pullen to provide consulting services for the Year 2000 readiness process. The MIS staff has made significant progress in the necessary steps to review, correct and test the city's MIS systems for Y2K compliance, but more remains to be accomplished in the remaining months prior to January 1, 2000. Work is required in the city's other technology dependent functions that are similarly affected by the Y2K problem. These functions include possible or potential Y2K failures in various operating equipment, elevators in various city facilities, traffic signal controllers, water and sewage systems and heating and cooling systems in city facilities. The consultant will review and validate the work city staff has already accomplished and assist in the review, remediation and testing remaining on all of the other technology functions of the city. The city's financial and credit ratings, liability and legal protection have come to expect that a third party consulting contract is necessary to validate the readiness of our systems and equipment in the event of Y2K failures. The proposed contract with McGladrey & Pullen will provide the services needed to assist the city in completing the readiness plans for Y2K. The proposed fee is $125 per hour for consulting and $63 per hour for travel time. Mr. Meisinger estimates the approximate cost to be $15,000.00 over the next year. The Computer Technical Review Committee has recommended approval of the contract. A Y2K Committee has been established with the first meeting to be held on Wednesday, January 20, 1999. It is estimated that the city has spent $537,900.00 to become Y2K compliance. With no further business before the council, it was moved by Getty, seconded by Jordan that the meeting be adjourned at 5:09 p.m. Ayes: Five. Absent: Gronen, Collier. Motion carried. Nancy Eckert City Clerk