Loading...
HomeMy WebLinkAboutStrand Associates, Inc. Amend No. 1 - 04.04.2022heAl STRAND ASSOCIATES Strand Associates, Inc: March 10, 2022 City of Waterloo 715 Mulberry Street Waterloo, IA 50703 Attention: Mr. Brian M. Bowman, Treatment Operations Supervisor Re: Amendment No. 1 to the April 17. 2019, Agreement for General Services Biogas Utilization Modifications Preliminary Design This is Amendment No. 1 to the referenced Agreement. Under Scope of Services, REPLACE item No. 3 in its entirety with the following: "3. Prepare a preliminary engineering report that summarizes the anticipated facilities and projects to incorporate pipeline quality renewable natural gas production at the wastewater treatment plant and at the lagoon, as appropriate. The report will include a summary of available biogas data, preliminary site layout sketches. opinions of project cost, and opinions of potential revenue. Submit the draft report to OWNER for review." Under Schedule, CHANGE August 31, 2019, to "October 31, 2022." IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: STRAND ASSOCIATES, INC.1 OWNER: CITY OF WATERLOO ate is 4/4/2022 sicxco 4/ dt�y 2<7Z7- Jo ,.�h . Bunker a e Quentin M. Hart Date Corporate Secretary Mayor FLAW ppp',ltM41)DocumrnisAgricrn ni,W11mvlaa,finofllAliiiagasLohzaponModPrclum ign:014AgrAmd-1400061duc, www.strand.com eAl STRAND ASSOCIATES Strand Associates, Inc: March 10, 2022 City of Waterloo 715 Mulberry Street Waterloo, IA 50703 Attention: Mr. Brian M. Bowman, Treatment Operations Supervisor Re: Amendment No. 1 to the April 17, 2019. Agreement for General Services Biogas Utilization Modifications Preliminary Design This is Amendment No. 1 to the referenced Agreement. Under Scope of Services, REPLACE item No. 3 in its entirety with the following: "3. Prepare a preliminary engineering report that summarizes the anticipated facilities and projects to incorporate pipeline quality renewable natural gas production at the wastewater treatment plant and at the lagoon, as appropriate. The report will include a summary of available biogas data, preliminary site layout sketches. opinions of project cost, and opinions of potential revenue. Submit the draft report to OWNER for review." Under Schedule, CHANGE August 31, 2019, to "October 3 I, 2022." IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: STRAND ASSOCIATES, INC.* JosM. Bunker D.te Corporate Secretary OWNER: CITY OF WATERLOO Querttirc / Quentin M. Hart Mayor RAW pppiRMAD Doam,iL AJeemenuW14anion, Ct).afflAAHigfast'ehwa6onModl4dimDesf{,, 010 Agr Amd44b3006Idm 4/4/2022 Date www_strand.com CgAi STRAND ASSOCIATES' Excellence rn Engineenng Since 1946 DATE: 3/15/22 COMPANY NAME: ATTENTION: ADDRESS: CITY/STATE/ZIP: RE: Transmittal Letter Strand Associates, Inc: 910 West Wingra Drive Madison. WI 53715 (P) 608.251.4843 www.strand.com PROJECT NO 4463.006 Waterloo Waste Management Services Brian Bowman 3505 Easton Avenue Waterloo, IA 50702 RNG Amendment WE ARE SENDING YOU V] Change Order Copy of Letter Other • ■ Drawings Enclosed ■ ■ Samples Shop Drawings ■ Specifications Under Separate Cover Copies Date No. Description 2 3/2022 1 Amend #1 to the original contract ITEMS TRANSMITTED AS SHOWN: For approval For your use As requested For review and comment Other ■ ■ REMARKS: • Approved as submitted Approved as noted Approved as noted —Resubmit Not Approved Brian - please return one fully executed copy for our files. Thank you! Copy to: File S kMADk4400449944631006\Protect Mgntacleements\tra is amend1 031522 do« Signed ■ 113 Resubmit copies for approval Submit copies for distribution Additional Information Required For signature R. ndall A. Wirtz h.D., P.E., ENV SP Arizona Illinois Indiana I Iowa Kentucky Ohio Tennessee I Texas I Wisconsin