Loading...
HomeMy WebLinkAboutArends Excavating Change Order No.1 Cont. No. 983 - 04.04.2022March 9, 2022 Matt Schindel City of Waterloo 715 Mulberry Street Waterloo, IA 50703 Re: FY 2021 Leversee Road Lift Station Waterloo, Iowa City Contract No. 983 CGA PN 5623 1.06 Dear Matt: CGA ENGINEERS • LAND SURVEYORS Enclosed electronically for your review and processing is one (1) copy of Change Order #01 prepared on the City of Waterloo's standard form for the above referenced project. A full, summarized change order request has not been submitted by Arends Excavating at this time. CGA recommends executing the enclosed change order based on the below summary: • Add bollards around the generator: $10,044.02 • Add signage around the generator: $471.50 • Add fire extinguisher and signage: $633.08 • Change electrical panel to NEMA 12: $2,551.85 • Add additional conduit to separate circuits $5,664.46 Subtotal of changes is $19,364.91. A ten percent markup for the Prune Contractor has been added per SUDAS Standard Specifications Section 1090 Subsection 1.04 to rcach a total of $21,301.40 as shown on the attached copy of Change Order #01. Please return one (1) executed copy of the signed change order to our office for our file. Please contact CGA at your earliest convenience if you have any questions on the information provided. Sincerely, CLAPSADDLE-GARBER ASSOCIATES, IN Lary Koosmann, EI, LSI Project Manager Clapsaddle-Garber Associates, Inc. 16 East Main Street • Marshalltown, Iowa 50158 • Telephone 641-752-6701 • Fax 641-752-2849 Toll Free 800-542-7981 • www.cgaconsultants.com CITY OF WATERLOO, IOWA CHANGE ORDER NO.1 PROJECT: FY 2021 Leversee Road Lift Station, CONTRACT NO. 983 Date Prepared: 11/1312021 AMOUNT: Increase $21,301.40 TO: Arends Excavating , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 12/28/2020. A. Description of change to be made or extra work to be done: Add Item CO 1,1: Generator Bollards Add Item CO 1.2: Generator Signage Add Item CO 1.3: Fire Extinguisher and Signage Add Item CO 1.4: Change Panel Rating to Nema 12 Add Item CO 1.5: Additional Conduit to Separate Circuits B. Reason for ordering change or extra work: Fuel tank permitting requires additional items including bollards, signage and fire extinguisher. Panel schedule required correction. C. Settlement for cost of work to be made as follows: Add Item CO 1.1: Generator Bollards Add Item CO 1.2: Generator Signage Add Item CO 1,3: Fire Extinguisher and Signage Add Item CO 1.4: Change Panel Rating to Nema 12 Add Item CO 1.5: Additional Conduit to Separate Circuits CITY OF WATERLOO BY: 4/4/2022 Mayor Date ATTEST: City Clerk Date Total Net Increase $21,301.40 C BY:. 17-2' Y� 4 TITLE: �� LH4 V� , APPROVED: ity Engineer Ay.9_,n,L (--1) 12{ ONTRACTOR Date Date