Loading...
HomeMy WebLinkAboutWRH - Change Order No. 11, Contract No. 907 - 5.2.2022Owner City of Waterloo FINAL QUAFTITh)ADJUSTMENT Date: 4/18/2022 Project Satellite Wet Well Rehabilitation Owner's Contract No. 907 Date of Contact Start 9/17/2018 Contractor: Contract Amount: WREI, Inc. $ 1,839,380.00 You are directed to make the following changes In the Contract Documents. Description: 11 Satellite Grout 12 Satellite Repair TOTAL DEDUCTIONS $ 1,100.00 /GAL $ 230.00 /CF -75 GAL $ (82,500.00) -7.26 CF $ (1,670.00) $ (84,170.00) Reason for Change Order 11 Removed from contract. 12 Reduction In completed quantity. CONTRACT PRICE Original: Previous C.O.s (ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: $ 1,839,380.00 $ 417,034.00 $ (84,170.00) $ 2,172,244.00 Original Completion Date: Revised Completion Date: CONTRACT TIME To Substantial To Final Completion Completion 11/20/20201 12/18/2020 3/31/2022 it Is agreed by the Contractor that this Change Order Includes any and all costs associated with or resulting from the change(s) ordered herein, Including all Impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of thls Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED}. � BY: `—'�} LX,A.J.SZ�'vc Owner (Authorized Signature) ACCEPTED BY: Mitchell Vargson mn„,,,;5115,0, Contractor (Aulhorized Signature) ACCEPTED: BY: AECOM Date 4/18/22 Dale 4/18/2022 Date AECOM 60488465/606093771 Project No. Final Qty Adj