HomeMy WebLinkAboutAspro - FY22 Asphalt Overlay, CO#1 - Cont. No. 1056 - 6.6.2022CITY OF WATERLOO, IOWA
CHANGE ORDER NO.1
PROJECT: P.Y. 2022 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 1056 Date Prepared: May25,2022 AMOUNT: $435,210.35 INCREASE
TO: ASPRO, INC. , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the
following extra work on your contract dated May 2, 2022.
A. Description of change to be made or extra work to be done:
Addition of overlay work on Falls Avenue from Stephan Avenue to Ansborough Avenue.
See sheet two for change order items and descriptions.
B. Reason for ordering change or extra work:
This street was originally scheduled for inclusion in this contract. During preparation of engineer's cost
estimate, estimated contractor prices (based on bids received for FY 2022 Street Reconstruction
Project) for planned work exceeded project budget requiring streets to be removed. After bids were
received, it was determined that Falls Avenue could be included in the project and still be within budget.
C. Settlement for cost of work to be made as follows:
For items already in the contract, the Contractors unit price for these items is the same. Quantities will
be adjusted to include the quantities for Falls Avenue. For items not included in the project, new items
will be added.
See sheet two for change order item quantities and pricing.
Ottertail 9-(ar�
BY:
,/ 6/6/2022
Mayor
ATTEST:
Rely Fe[ch[e
TOTAL INCREASE $435,210.35
ASPRO, INC.
Date CONTRAC
s
6/6/2022
City Clerk
BY:
TITLE:
v. P
Date
Date APPRS»JED:
ity Engineer
057,01
Date
Change Order #1
Contract No. 1056 Sheet 1 of 2
FY 2022 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 1056
CHANGE ORDER 81
EXISTING BID ITEM REVISIONS
BID
ITEM
ITEM DESCRIPTION
UNIT
EX. ITEM
EST. QTY.
PRO. ADD.
EST. QTY.
REV. ITEM
EST. QTY.
ASPRO UNIT
PRICE
EX. ASPRO ITEM
PRICE
REV. ASPRO
ITEM PRICE
ITEM COST
INCREASE
i
STORM SEWER TRENCHED, RCP, 2000D, 12 INCH
LE
50.0
106.0
156.0
$ 115.00
$ 5,750.00
$ 17)940.00
$ 12,190.00
8
CASTING EXTENSION RING (INLET)
EACH
50.0
11.0
61.0
$ 300.00
$ 15,000.00
$ 18,300.00
$ 3,300.00
9
CASTING EXTENSION RING (MANHOLE)
EACH
83.0
13.0
96.0
$ 900.00
$ 74,700.00
$ 86,400.00
$ 11,700.00
11
MANHOLE ADJUSTMENT, MINOR
EACH
1.0
2.0
3.0
$ 1,600.00
$ 1,600.00
$ 4,800.00
$ 3,200.00
12
PAVEMENT, HMA, STANDARD TRAFFIC (ST) SURFACE,
1/2", PG 58-285, NO FRICTION
TONS
2,589.9
1,615.8
4,205.7
$ 145.45
$ 376)700.96
$ 611,719.07
$ 235,018.11
17
REMOVAL OF SIDEWALK
SY
1,029.8
139.4
1,169.2
$ 21.50
$ 22)140.70
$ 25,137.80
$ 2,997.10
18
SIDEWALK, PCC, C-4, 4-INCH
SY
361.6
46.6
408.2
$ 51.00
$ 18,441.60
$ 20,818.20
$ 2,376.60
19
SIDEWALK, PCC, C-4, 6-INCH
SY
387.5
30.5
418.0
$ 53.00
$ 20,537.50
$ 22,154.00
$ 1,616.50
20
SIDEWALK, PCC, C-4, 6-INCH PEDESTRIAN RAMP
SY
351.7
62.0
413.7
$ 53.00
$ 18,640.10
$ 21,926.10
$ 3,286.00
21
DETECTABLE WARNING
SF
766.0
136.0
902.0
$ 50.00
$ 38,300.00
$ 45,100.00
$ 6,800.00
24
LF
1,270.7
252.6
1,523.3
$ 26.50
$ 33,673.55
$ 40,367.45
$ 6,693.90
REMOVE CURB &GUTTER
27
LF
988.2
231.4
1)219.6
$ 75.00
$ 74,115.00
$ 91,470.00
$ 17,355.00
CURB & GUTTER, 24-INCH WIDE, 13.5-INCH THICK,
PCC C-4
28
REMOVAL OF PAVEMENT
SY
19.3
17.6
36.9
$ 25.00
$ 482.50
$ 922.50
$ 440.00
29
PAVEMENT, HMA, 6-INCH
SY
19.3
12.2
31.5
$ 82.00
$ 1,582.60
$ 2,583.00
$ 1/000.40
34
SUBBASE, MODIFIED, 6-INCH
SY
1,110.0
192.0
1,302.0
$ 15.60
$ 17,316.00
$ 20,311.20
$ 2,995.20
35
GRANULAR SHOULDER
TONS
120.0
15.0
135.0
$ 35.40
$ 4,248.00
$ 4,779.00
$ 531.00
38
PAVEMENT SCARIFICATION
SY
58,475.4
9,575.1
68,050.5
$ 7.55
$ 441,489.27
$ 513,781.28
$ 72,292.00
39
PAINTED PAVEMENT MARKINGS,
SOLVENT/WATERBORNE
STA
284.81
46.03
330.8
$ 57.75
$ 16,447.78
$ 19,106.01
$ 2,658.23
47
LF
800.0
240.0
1,040.0
$ 7.35
$ 5,880.00
$ 7,644.00
$ 1,764.00
EROSION CONTROL, WATTLES, 9-INCH, INSTALL
48
LF
800.0
240.0
1,040.0
$ 4.00
$ 3,200.00
$ 4,160.00
$ 960.00
EROSION CONTROL, WATTLES, REMOVE
49
EARTHWORK, GRADE AND REMOVE TOPSOIL
SY
310.0
119.0
429.0
$ 26.25
$ 8,137.50
$ 11,261.25
$ 3,123.75
50
HYDRAULIC SEEDING, FERTILIZING, & MULCHING
SY
310.0
119.0
429.0
$ 12.25
$ 3,797.50
$ 5,255.25
$ 1,457.75
$ 1,202,180.55
$ 1,595,936.10
$ 393,755.55
NEW BID ITEMS
BID
ITEM
ITEM DESCRIPTION
UNIT
EX. ITEM
EST. QTY.
PRO. ADD.
EST. QTY.
REV. ITEM
ASPRO UNIT
PRICE
EX. ASPRO ITEM
PRICE
REV. ASPRO
ITEM PRICE
ITEM COST
INCREASE
EST. QTY.
1001
INTAKE, SW-511
EACH
-
1.0
-
$ 6'000.00
$ -
$ 6,000.00
$ 6)000.00
1002
CONNECTION TO EXISTING INTAKE, PIPE OR
STRUCTURE
EACH
_
-
1.0
-
$ 1)500.00
$ -
$ 1,500.00
$ 1,500.00
1003
HMA PAVEMENT SAMPLES AND TESTING
LS
-
1.0
-
$ 1,050.00
$ -
$ 1,050.00
$ 1,050.00
1004
LF
-
21.2
-
$ 54.00
$ -
$ 1,144.80
$ 1,144.80
CURB & GUTTER, 24-INCH WIDE, 6-INCH THICK, PCC
C-4
1005
PAVEMENT, HMA, 4-INCH
SY
-
192.0
-
$ 55.00
$ -
$ 10,560.00
$ 10/560.00
1006
TEMPORARY TRAFFIC CONTROL
LS
-
1.0
-
$ 12,000.00
$ -
$ 12,000.00
$ 12,000.00
1007
MOBILIZATION
LS
-
1.0
-
$ 9,200.00
$ -
$ 9,200.00
$ 9,200.00
$ -
$ 41,454.80
$ 41,454.80
TOTAL BID ITEM PRICE INCREASE - CHANGE ORDER 81
$ 435,210.35
Change Order 01 Contract It1056 Sheet 2 of 2