HomeMy WebLinkAboutAspro - FY22 Asphalt Overlay, CO#1 - Cont. No. 1056 - 6.6.2022CITY OF WATERLOO, IOWA CHANGE ORDER NO.1 PROJECT: P.Y. 2022 ASPHALT OVERLAY PROGRAM CONTRACT NO. 1056 Date Prepared: May25,2022 AMOUNT: $435,210.35 INCREASE TO: ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated May 2, 2022. A. Description of change to be made or extra work to be done: Addition of overlay work on Falls Avenue from Stephan Avenue to Ansborough Avenue. See sheet two for change order items and descriptions. B. Reason for ordering change or extra work: This street was originally scheduled for inclusion in this contract. During preparation of engineer's cost estimate, estimated contractor prices (based on bids received for FY 2022 Street Reconstruction Project) for planned work exceeded project budget requiring streets to be removed. After bids were received, it was determined that Falls Avenue could be included in the project and still be within budget. C. Settlement for cost of work to be made as follows: For items already in the contract, the Contractors unit price for these items is the same. Quantities will be adjusted to include the quantities for Falls Avenue. For items not included in the project, new items will be added. See sheet two for change order item quantities and pricing. Ottertail 9-(ar� BY: ,/ 6/6/2022 Mayor ATTEST: Rely Fe[ch[e TOTAL INCREASE $435,210.35 ASPRO, INC. Date CONTRAC s 6/6/2022 City Clerk BY: TITLE: v. P Date Date APPRS»JED: ity Engineer 057,01 Date Change Order #1 Contract No. 1056 Sheet 1 of 2 FY 2022 ASPHALT OVERLAY PROGRAM CONTRACT NO. 1056 CHANGE ORDER 81 EXISTING BID ITEM REVISIONS BID ITEM ITEM DESCRIPTION UNIT EX. ITEM EST. QTY. PRO. ADD. EST. QTY. REV. ITEM EST. QTY. ASPRO UNIT PRICE EX. ASPRO ITEM PRICE REV. ASPRO ITEM PRICE ITEM COST INCREASE i STORM SEWER TRENCHED, RCP, 2000D, 12 INCH LE 50.0 106.0 156.0 $ 115.00 $ 5,750.00 $ 17)940.00 $ 12,190.00 8 CASTING EXTENSION RING (INLET) EACH 50.0 11.0 61.0 $ 300.00 $ 15,000.00 $ 18,300.00 $ 3,300.00 9 CASTING EXTENSION RING (MANHOLE) EACH 83.0 13.0 96.0 $ 900.00 $ 74,700.00 $ 86,400.00 $ 11,700.00 11 MANHOLE ADJUSTMENT, MINOR EACH 1.0 2.0 3.0 $ 1,600.00 $ 1,600.00 $ 4,800.00 $ 3,200.00 12 PAVEMENT, HMA, STANDARD TRAFFIC (ST) SURFACE, 1/2", PG 58-285, NO FRICTION TONS 2,589.9 1,615.8 4,205.7 $ 145.45 $ 376)700.96 $ 611,719.07 $ 235,018.11 17 REMOVAL OF SIDEWALK SY 1,029.8 139.4 1,169.2 $ 21.50 $ 22)140.70 $ 25,137.80 $ 2,997.10 18 SIDEWALK, PCC, C-4, 4-INCH SY 361.6 46.6 408.2 $ 51.00 $ 18,441.60 $ 20,818.20 $ 2,376.60 19 SIDEWALK, PCC, C-4, 6-INCH SY 387.5 30.5 418.0 $ 53.00 $ 20,537.50 $ 22,154.00 $ 1,616.50 20 SIDEWALK, PCC, C-4, 6-INCH PEDESTRIAN RAMP SY 351.7 62.0 413.7 $ 53.00 $ 18,640.10 $ 21,926.10 $ 3,286.00 21 DETECTABLE WARNING SF 766.0 136.0 902.0 $ 50.00 $ 38,300.00 $ 45,100.00 $ 6,800.00 24 LF 1,270.7 252.6 1,523.3 $ 26.50 $ 33,673.55 $ 40,367.45 $ 6,693.90 REMOVE CURB &GUTTER 27 LF 988.2 231.4 1)219.6 $ 75.00 $ 74,115.00 $ 91,470.00 $ 17,355.00 CURB & GUTTER, 24-INCH WIDE, 13.5-INCH THICK, PCC C-4 28 REMOVAL OF PAVEMENT SY 19.3 17.6 36.9 $ 25.00 $ 482.50 $ 922.50 $ 440.00 29 PAVEMENT, HMA, 6-INCH SY 19.3 12.2 31.5 $ 82.00 $ 1,582.60 $ 2,583.00 $ 1/000.40 34 SUBBASE, MODIFIED, 6-INCH SY 1,110.0 192.0 1,302.0 $ 15.60 $ 17,316.00 $ 20,311.20 $ 2,995.20 35 GRANULAR SHOULDER TONS 120.0 15.0 135.0 $ 35.40 $ 4,248.00 $ 4,779.00 $ 531.00 38 PAVEMENT SCARIFICATION SY 58,475.4 9,575.1 68,050.5 $ 7.55 $ 441,489.27 $ 513,781.28 $ 72,292.00 39 PAINTED PAVEMENT MARKINGS, SOLVENT/WATERBORNE STA 284.81 46.03 330.8 $ 57.75 $ 16,447.78 $ 19,106.01 $ 2,658.23 47 LF 800.0 240.0 1,040.0 $ 7.35 $ 5,880.00 $ 7,644.00 $ 1,764.00 EROSION CONTROL, WATTLES, 9-INCH, INSTALL 48 LF 800.0 240.0 1,040.0 $ 4.00 $ 3,200.00 $ 4,160.00 $ 960.00 EROSION CONTROL, WATTLES, REMOVE 49 EARTHWORK, GRADE AND REMOVE TOPSOIL SY 310.0 119.0 429.0 $ 26.25 $ 8,137.50 $ 11,261.25 $ 3,123.75 50 HYDRAULIC SEEDING, FERTILIZING, & MULCHING SY 310.0 119.0 429.0 $ 12.25 $ 3,797.50 $ 5,255.25 $ 1,457.75 $ 1,202,180.55 $ 1,595,936.10 $ 393,755.55 NEW BID ITEMS BID ITEM ITEM DESCRIPTION UNIT EX. ITEM EST. QTY. PRO. ADD. EST. QTY. REV. ITEM ASPRO UNIT PRICE EX. ASPRO ITEM PRICE REV. ASPRO ITEM PRICE ITEM COST INCREASE EST. QTY. 1001 INTAKE, SW-511 EACH - 1.0 - $ 6'000.00 $ - $ 6,000.00 $ 6)000.00 1002 CONNECTION TO EXISTING INTAKE, PIPE OR STRUCTURE EACH _ - 1.0 - $ 1)500.00 $ - $ 1,500.00 $ 1,500.00 1003 HMA PAVEMENT SAMPLES AND TESTING LS - 1.0 - $ 1,050.00 $ - $ 1,050.00 $ 1,050.00 1004 LF - 21.2 - $ 54.00 $ - $ 1,144.80 $ 1,144.80 CURB & GUTTER, 24-INCH WIDE, 6-INCH THICK, PCC C-4 1005 PAVEMENT, HMA, 4-INCH SY - 192.0 - $ 55.00 $ - $ 10,560.00 $ 10/560.00 1006 TEMPORARY TRAFFIC CONTROL LS - 1.0 - $ 12,000.00 $ - $ 12,000.00 $ 12,000.00 1007 MOBILIZATION LS - 1.0 - $ 9,200.00 $ - $ 9,200.00 $ 9,200.00 $ - $ 41,454.80 $ 41,454.80 TOTAL BID ITEM PRICE INCREASE - CHANGE ORDER 81 $ 435,210.35 Change Order 01 Contract It1056 Sheet 2 of 2