Loading...
HomeMy WebLinkAboutBrock Even Construction - FY22 Sidewalk Repair Assessment - Zone 1 - CO #2 - Contract 1055 - 6.6.2022CITY OF WATERLOO, IOWA CHANGE ORDER No. 2 PROJECT: F.Y. 2022 SIDEWALK REPAIR ASSESSMENT PROGRAM - ZONE 1 CONTRACT NO. 1055 Date Prepared Mav19,2022 AMOUNT $13,116.00 INCREASE TO BROCK EVEN CONSTRUCTION, LLC Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated September 7, 2021. A. Description of change to be made or extra work to be done: 2001 Remove Sidewalk 2002 Sidewalk, PCC, 4" 2003 Sidewalk, PCC, 6" 2004 Detectable Warning Surface 2005 Clean Roadstone 2" 2006 Pipe Rest 2007 Minor Manhole Adjustment B. Reason for ordering change or extra work: Sidewalk work covered under this change order is work associated with the Canadian National (CN) Railroad crossing improvements at Burton Avenue and West Parker Street. Those crossing improvements were completed in the fall of 2021 under agreements between the Iowa DOT, CN Railroad, and City of Waterloo. A requirement of those agreements is that any pedestrian crossing affected by the railroad crossing improvement shall be reconstructed to meet current ADA requirements. The City elected to have the pedestrian crossing repairs made by the City's sidewalk assessment contractor (who was already working in the vicinity of these crossings) as opposed to hiring a separate contractor. As these pedestrian improvements are part of the railroad crossing improvements, these improvements shall be financed through road funding. 2001 Remove Sidewalk 2002 Sidewalk, PCC, 4" 2003 Sidewalk, PCC, 6" 2004 Detectable Warning Surface — Current ADA guidelines require the placement of Detectable Warning Surfaces at pedestrian railroad crossings. 2005 Clean Roadstone 2" — This item covers replacement stone material for the pedestrian crossing subbase and the outfall protection material for the drain pipe at the Burton Avenue crossing. 2006 Pipe Reset — It was noted during field survey and design for the under the recreation trail to be repaired at the Burton Avenue crossing was an 8" PVC drain pipe that was draining the wrong direction. Under this item, the Contractor shall remove and relay the existing pipe to allow drainage to flow away from the railroad crossing. If the pipe is found unusable, the Contractor is to replace the PVC pipe with similar sized material. Replacement of the pipe is incidental. 2007 Minor Manhole Adjustment — Pedestrian improvements at West Parker Street require the sidewalk to be raised to be the new rail elevation. There is a sanitary manhole in the public Change Order No. 2 Contract No. 1055 Sheet 1 of 2 sidewalk at the northwest corner of the railroad crossing that needs to be raised in order to allow the reconstructed sidewalk to meet ADA regulations. C. Settlement for cost of work to be made as follows: Item tt Est. Qty. Units BEC Unit Price BEC item Price 2001 537.9 SF $ 4.00 $ 2,151.60 2002 79.6 SF $ 7.50 $ 597.00 2003 458.4 SF $ ' 8.50 $ 3,896.40 2004 70.0 SF $ 85.00 $ 5,950.00 2005 0.1 TON $ 200.00 $ 20.00 2006 1,0 EACH $ 250.00 $ 250.00 2007 1.0 EACH $ 250.00 $ 250.00 TOTAL INCREASE $ 13,115.00 Qum -an Sri °LNI BY: 6/6/2022 BROCK EVEN CONSTRUCTION. LLC Mayor ATTEST: Retrey Fe[ch[e Date CONTRACTOR 6/6/2022 City Clerk BY: � 370YZz Date TITLE: O '%-eX Date APPROVED: ty Engineer ' Date Change Order No. 2 Contract No. 1055 Sheet 2 of 2