Loading...
HomeMy WebLinkAboutVieth Construction Corporation - CO #1 - 5 Bros Plaza - 6.20.2022I Change Order Document G701,' — 2017 PROJECT: (Name and address) City of Waterloo Sullivan Brothers Plan Renovation, Wait; tau, IA, OWNER: (Nume and ad(1 s,$) City or Waterton 715 Mulberry Street Waterloo, TA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Nacre and address) I & S Group, Inc. USG) 314 East 4th Street Waterloo, 1A 50703 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: June 3, 2022 CONTRACTOR: (Name and address) Vieth Construction Corporation 6419 Nordic Drive Cedar halts, IA 50613 THE CONTRACT'S CHANGED AS FOLLOWS: Omen a detailed cls aarljtfion of `lhcrchange and, if nppfianbk, ouch ur rcclhreneet speelJie exhibits. Also include agreed upon arlfustirrenrs ullrlhrilnhle io esec,wti d Ca, 1rnelion Change Dim:lives;) A. TO runtish and install MasterSeal Traffic 2500 Light Duty System: proper prep of existing txltict'cic•shalt tlitd joints, install MasterSeal M 270 baseeoat (waterproofing rnetttbraue) and install MasterScal TC 295 (UV stable). All work to be completed in one mobilization Add $24,950.00 REDUCE SPECIFIED EXI4.)X'Y COATING ALLOWANCE FROM S80,000.00 TO S55,050.00. CONTRACT SLIM REMAINS UNCHANGED. The original Caatrnet Sum wits The net cllunge:by previously authorized Change Riders The Contract Suitt prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be nnehanged by Zero (0) days. The new date of Substantial Completion will be September 2, 2022 (per Addenda fit). $ _...1.,692,500.000 $ 0.00 $ 1,692,500.00 0.00 $ 1,692,500.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the ()water and (,nitti'actor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. T Sr. 5 Group, Inc. (1SGI Vieth C onstnrctiort Corporation City of Waterloo ARCHITECT (Firm name) CONT (l•'trrrr nftcc�.' SIGNATURE SIGNATUR SIGNATURE 'Cony Vieth, President Quentin Hart, Mayor OWNER (Lr r anal Querrtui 9 tar Nathan Compton, Architect/Project Maltpger. PRINTED NAME AND TITLE June 3, 2022 DATE PRINTED NA AN TITLE PRINTED NAME AND TITLE June 20, 2022 DATE DATE AIA Document G701" — 2017. Copyright 01979, 1987, 2000 , 2001 and 2017 by The Aniertcan Institute of Architects. At tights reserved. The "Arnericar Institute nt Architects," "AIA,' ILe AIA Logo, anti 'AIA [ onVact Documents' are registered tradema'ks and may not be users will r,ut preinission. This document was produced by AIA software at 11:36:24 CT on 06/03/2022 under Order No.9281462824 which expires on 07 12/2022, is not for resale, is licensed far one- time use only, and may only be used in accordance with the AIA Contract Documents°° Terms of Service. To report copyright vialaltons, e-mail copyrightrryaia.org. User Notes: (369AFJA48)