Change Order
PROJECT: (Name ar:d adds xs)
City of Waterloo Sullivan Brothers I'lara
Renovation. Waterloo, IA.
OWNER:.(Natne and address)
City of Waterloo
715 Mulberry Street
Waterloo, IA 50703
CONTRACT INFORMATION:
Contract 1'or: General Construction
Project No: 21-25083
Date: February 24, 2022
ARCHITECT: (Name and address)
I & S Group, Inc. (ISG)
314 East 4th Street
Waterloo, IA 50703
CHANGE ORDER INFORMATION:
Change Order Number: 002
Date: June 8. 2022
CONTRACTOR: (Name and address)
Vieth Construction Corporation
6419 Nordic Drive
Cedar Falls, IA 50613
THE CONTRACT 15 CHANGED AS FOLLOWS:
(Insert a detailed ih wriptiion vfThe change and, i/'applicable, attach or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction C'ha►:gc l]it-cctives.)
A. Cot to complete work- Memorial pedestal support rod, 4" Nom.
Steel pipe .337 wall (sched 80) 4dd $3,969.00
REDUCE SPECIFIED EPDXY COATING ALLOWANCE FROM $55,0S0.00 TO S51,081.00.
CONTRACT SUM REMAINS UNCHANGED.
The original Contract Sum wns
The netchange by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be unchanged by this Change Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be unchanged by Zero (0) days.
The new date of Substantial Completion will be September 2, 2022 (per Addenda #1).
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
$ 1,692,500.00
$ 0.00
$ 1,692,500.00
$ 0.00
$ 1,692,500.00
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
1 & S Group, Irrs:. (IS(ii
ARCHITECT (Firm name)
SIGNATURE
Nathan Compton, Architect/Project
Manager
Vieth Construction Corporation City of Waterloo
CONTRACTOR (Firm rrtrr?el OWNER (Finn name)
L
` ,,e-eQuentin liar(
SIGNATURE SIGNATURE
Tony Vieth, President Quentin Hart, Mayor
PRINTED NAME AND TITLE PRINTED NA E A�T�LE
DATE DATE DATE
PRINTED NAME AND TITLE
7/5/2022
AIA Document G701'" — 2017. Copyright iD 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "Americar
Institute of Architects,' "AIA," the AIA I..ogo. and "AIA Contract Documents" are regislared tradernmks and may not be used without permission. This document
was produced by AIA software at 11:19:29 CT on 06/08/2022 under Order Na 9281462824 which expires on 07/12/2022, is not for resale, is licensed for one-
time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail
copyright@aia.org.
User Notes: (3B9ADA53)