HomeMy WebLinkAbout05/27/1997 FINANCE COMMITTEE
May 27, 1997
5 :25 p.m.
Large Conference Room
Members present : Chairperson Mollenhoff, Krizek, Getty.
Moved by Krizek, seconded by Getty that the Agenda, as proposed, be
approved. Ayes : Three. Motion carried.
Moved by Krizek, seconded by Getty that the Minutes of May 12 . 1997
be approved. Ayes : Three. Motion carried.
The following bids received for light fixtures for Rooms 21-23 at
the Five Sullivan Brothers Convention Center were reviewed:
Bidder Bid Amount
3-E Electrical Engineering & Equipment $10, 489 . 00
Van Meter Electric Supply $14, 602 . 13
Crescent Electric Supply $12, 957 . 00
It is the recommendation of the Administrative Director that the
low bid of 3-E Electrical Engineering & Equipment in the amount of
$10, 489 be accepted. Moved by Getty, seconded by Krizek that said
recommendation be approved. Ayes : Three. Motion carried.
The request of the CS/M Supervisor WP/FC to upgrade a PCU and have
a systems check on the TV van at a cost of $800 was reviewed. The
van will be scheduled to go to Wisconsin for installation of a new
reel and the systems check and PCU upgrade could be done at the
same time. Moved by Krizek, seconded by Getty that said request be
approved. Ayes : Three . Motion carried.
The request of the CS/M Supervisor WP/FC to purchase a portable PH
monitor unit was reviewed. The unit is to be used by the lab and
Pretreatment Supervisor for fieldwork. The unit currently being
used is outdated and parts are no longer available for repairs.
The unit is a basic test unit that is required for monitoring PH
inflow from industrial users . It is a necessary item to perform
basic tests needed for reports to establish a user ordinance and to
insure that the guidelines of the ordinance are followed. Two
quotes were received. It is the recommendation of Water
Pollution/Flood Control that the bid of Harry Ferris Company in the
amount of $2, 057 be accepted. Moved by Getty, seconded by Krizek
that said recommendation be approved. Ayes : Three. Motion
carried.
The request of the CS/M Supervisor WP/FC to purchase a portable
sampler and associated equipment was reviewed. The sampler will be
used primarily for pretreatment but would also serve as a backup to
the plant and could be used for special sampling as required by
plant need or the Department of Natural Resources. It is the
recommendation of Water Pollution that the bid of Harry Ferris
Company in the amount of $2, 725 . 01 be accepted. Moved by Getty,
seconded by Krizek that said recommendation be approved. Ayes :
Three. Motion carried.
A Change. Order for a net increase of $42, 992 . 00 for Phase I of the
East and West 5th Street Parking Ramps was reviewed. Phase I of
the parking ramp renovation is near completion. Structural repair,
beam patching, overhead patching, etc. that is being addressed in
Phase I will be adversely affected throughout the winter months by
ice, snow, freezing and thawing without Phase II deck repair in
place. The overall cost of Phase II is $600, 000 . Budgeting does
not permit Phase II deck repair to be constructed this year. To
protect the work in Phase I, it is recommended that the joint and
crack sealing repairs be approved. This work is necessary to
protect the $556, 000 repairs of Phase I . The cost of repairs
recommended to protect the work is $39, 845, with 7 . 9 percent
architect and engineering fees, for a total cost of $42, 992 . Moved
Finance Committee
May 27, 1997
Page 3
Moved by Getty, seconded by Krizek that the request of the
Superintendent of Central Garage to transfer $1, 500 from Line Item
114 (Time & Half) to Line Item 113 (Longevity) be approved. Ayes :
Three. Motion carried.
Moved by Getty, seconded by Krizek that the request of the
Superintendent of Sanitation/Recycling for numerous line item
amendments (a copy is on file in the City Clerk' s office) , be
approved. Three. Motion carried.
Moved by Getty, seconded by Krizek that the request of the City
Planner to transfer $200 from Line Item 1312 (Eng & Con) to Line
Item 1344 (Telephone) ; $100 from 1338 (Data Processing) to Line
Item 1561 (Office Supplies) ; $200 from Line Item 1353 (Printing) to
Line Item 1561 (Office Supplies) be approved. Ayes : Three.
Motion carried.
Moved by Getty, seconded by Krizek that the request of the Police
Chief to transfer $2, 500 from Line Item 1130 (Employee Benefit
Reimbursement) to Line Item 1378 (Other Equipment Repair) ; $800
from Line Item 1130 (Employee Benefit Reimbursement) to Line Item
1385 (Office Equipment) ; $25 from Line Item 1130 (Employee Benefit
Reimbursement) to Line Item 1391 (Dues & Membership) ; $1, 000 from
Line Item 1130 (Employee Benefit Reimbursement) to Line Item 1573
(Safety Equipment) be approved. Ayes : Three . Motion carried.
Moved by Getty, seconded by Krizek that the request of the Police
Chief to transfer $1, 000 from Line Item 1346 (Travel-Training) to
Line Item 1529 (Firearms, Accessories & Supplies) ; $3, 000 from Line
Item 1130 (Employee Benefit Reimbursement) to Line Item 1579
(Wearing Apparel) be approved. Ayes: Three. Motion carried.
Moved by Getty, seconded by Krizek that the request of the
Superintendent of Parking Maintenance to transfer $800 from Line
Item 1371 (Building Maintenance) to Line Item 1533 (Gasoline) ; $400
from Line Item 1371 (Building Maintenance) to Line Item 1571
(Equipment Parts) be approved. Ayes : Three . Motion carried.
Moved by Getty, seconded by Krizek that the request of the
Superintendent of Traffic Operations to transfer $100 from Line
Item 1373 (Fixed Equipment) to Line Item 1314 (Health Services) ;
$100 from Line Item 1373 (Fixed Equipment) to Line Item 1352 (Photo
& Copy) ; $200 from Line Item 1521 (Electrical Supplies) to Line
Item 1513 (Chemicals) ; $1, 000 from Line Item 1130 (Benefit
Reimbursement) to Line Item 1128 (Retirement) ; $200 from Line Item
1521 (Electrical Supplies) to Line Item 2152 (Building
Improvements) ; $200 from Line Item 1521 (Electrical Supplies) to
Line Item 1343 (Postage) ; $200 from Line Item 1521 (Electrical
Supplies) to Line Item 1561 (Office Supplies) ; $800 from Line Item
1569 (Vehicle Parts) to Line Item 1571 (Equipment Parts) ; $300 from
Line Item 1521 (Electrical Supplies) to Line Item 1371 (Building
Maintenance) ; $400 from Line Item 1521 (Electrical Supplies) to
Line Item 1344 (Telephone) be approved. Ayes : Three. Motion
carried.
Moved by Getty, seconded by Krizek that the request of the Fire
Chief for numerous line item amendments (a copy is on file in the
City Clerk' s office) , be approved. Ayes : Three. Motion carried.
Moved by Getty, seconded by Krizek that the request of the
Community Development Program Manager to transfer $81, 277 from Line
Item 3345 (Refunds) to Line Item 1396 (Demolition; $3 , 167 from Line
Item 1396 (Demolition) to Activity 5850 1396 (Demolition) ;
$1, 498 . 15 from Line Item 3722 (Refunds) to Line Item 1375
(Automotive Equipment) ; $10, 000 from Line Item 1327 (Residential
Rehab) to Line Item 1706 (Housing Assistant Pay) ; $3, 000 from Line
Item 2151 (Building Inspection) to Line Item 1334 (Services from
Other Departments) ; $40, 000 from Line Item 1327 (Residential Rehab)