Loading...
HomeMy WebLinkAboutThomas Industrial Coatings - CO#1 Cont. No. 1054 - 7.18.22CHANGE ORDER ® William Glaus, Thomas Industrial Coatings ® Jamie Knutson, City of Waterloo PROJECT: 4th Street Bridge Painting OWNER: City of Waterloo TO: William Glaus Thomas Industrial Coatings 2070 Highway Z Pevely, MO 63070 CO No.: 01 DATE OF ISSUANCE: 07/06/22 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Paint caulk inside bridge canopy black to match other caulk conditions. TOTAL ADD TO CONTRACT Attachments: $4,575.00 $4,575.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was $98,280.00 Net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order was $98,280.00 The Contract Sum will be (increased) by this Change Order $4,575.00 The new Contract Sum including this Change Order will be $102,855.00 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects ARCHITECT Mark Kuiper, ASLA, LEED AP Thomas Industrial Coatings CONTRACTOR a)agyea.,,, Signature William Glaus City of Waterloo OWNER Signature Jamie Knutson, PE