HomeMy WebLinkAboutThomas Industrial Coatings - CO#1 Cont. No. 1054 - 7.18.22CHANGE ORDER
® William Glaus, Thomas Industrial Coatings
® Jamie Knutson, City of Waterloo
PROJECT: 4th Street Bridge Painting
OWNER: City of Waterloo
TO: William Glaus
Thomas Industrial Coatings
2070 Highway Z
Pevely, MO 63070
CO No.: 01
DATE OF ISSUANCE: 07/06/22
FROM:
RITLAND+KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Paint caulk inside bridge canopy black to match other caulk conditions.
TOTAL ADD TO CONTRACT
Attachments:
$4,575.00
$4,575.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time.
The original Contract Sum was $98,280.00
Net change by previously authorized Change Orders $0.00
The Contract Sum prior to this Change Order was $98,280.00
The Contract Sum will be (increased) by this Change Order $4,575.00
The new Contract Sum including this Change Order will be $102,855.00
The Contract Time will be (unchanged) zero ( 0 ) Days
RITLAND+KUIPER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEED AP
Thomas Industrial Coatings
CONTRACTOR
a)agyea.,,,
Signature
William Glaus
City of Waterloo
OWNER
Signature
Jamie Knutson, PE