HomeMy WebLinkAboutVieth Construction - CO#3 5 Brothers Plaza Renovation - 8.15.2022AIA Docu m r nt C'/a l 2017 Change Order PROJECT: (Name Mil address) City of waterloo Sullivan Brothers I'1i za Renovation, Valence, IA. OWNER: (Narne and adth'ess) City of Watcrlao 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Name and address) 1 & S Croup, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION: Change Order Number: UO3 Date: August 2, 2022 CONTRACTOR: (Name and address) Vieth Construction Corporatioi; 6419 Nordic Drive Cedar Falls. IA 50613 THE CONTRACT IS CHANGED AS FOLLOWS: (insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon udjushnents attributable to executed Construction Change Directives.) A. PR 04: To install the changes outlined in PR 1I4 at no cost change: A deduct for the future 4" conduit along 4th Street Deduct ($ 5,407.50) B. PR 03: Omit stair demolition for south entrance, 6" PCC pavement at north entrance, concrete stairs at north entrance, concrete topping slab and stairs (includes corrugated metal floor decking in lieu of polymer repair material, wire mesh, Mel -Rol waterproofing membrane, #I4 nosing bar and 4000 PSI topping mix as specified); additional 6" PCC colored pavement, planting are a no cost change; labor deduct for reduced brick pavers (material order is included); handrails are a no cost change (ramp handrail was removed, two additional stair handrails where added) Add $ 43,761.11 TOTAL ADD $ 38,353.61 REDUCE SPECIFIED EPDXY COATING ALLOWANCE FROM $51,081.00 TO $12,727.39. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was The net change by previously authorized Change Orders The Contract Suizi prior to this Change Order was The Contract Stun will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. 'rho now date of Substantial Completion will be September I, 2022 (per Addenda #1). no CHANGE 'ro sUBSTAttTIr,1. COMPLETION GATE, NOTE: This Change Order does not include adjustments to the Contract Stun or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, 1,692,500.00 0.00 $ 1,692,500,00 $ 0.00 1,692,500.00 NOT VALID UNTIE_ SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & 8 Group, Inc. (1S6') ARCHITECT (Firm nani) SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE Angusr 7, 7022 DATE DATE DATE Vieth Construction Corporation City of Waterloo CONTRA (Firm nurse) •- 0 NER f(f innsname) / ClC/til/Z SIGNATURE SIGNATURE Tony Vieth, President Quentin Bart, Mayor PRINTED NAM AND TI LE PINtI9JME AND TITLE a 3 2.uLZ AIA Document G701 .2017. Copyright 01879, 1987, 2000 , 2001 and 2017 by The American institute of Architects. NI rights reserved. The -Americer Institute of Architects.' 'AIA,' tI'e AlA Logo, and 'AIA contract f)nr,Urnents' ace: rerrisrereri trademarks and may not he used wiihnut permissinir. This document was produced by AIA software at 15:07:21 CT on 08102/2022 under Order No.2114332387 which expires on 07112/2023. is not for resale, is licensed for one- time use only, and may only be used in accordance with the AIA Contract Documents' Terms of Service. To report copyright vidaliens, e-mail copyright@aia.org. User Notes: (369ADA3C)