Loading...
HomeMy WebLinkAboutVieth Construction CO#4 5 Brothers Plaza RenovationDocument G701TM — 2017 Change Order PROJECT; (Name and address) City of Waterloo Sullivan Brothers Plaza Renovation, V atcrlon, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50701 CONTRACT INFORMATION: Contract Iroe: General Construction Project No: 21-25083 Date: February 24, 2022 ARCHITECT: (Name and address) l & S Group, Inc_ (ISG) 314 bast 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION; Change (Order Number: U04 Date: July 14, 2022 CONTRACTOR: (Name and address) Vieth Construction Corporation 6419 Nordic Drive Cedar Palls, IA 50613 THE CONTRACT IS CHANGED AS FOLLOWS: Omen a detailed description ()jibe rhrutge and, ll •uppdic tbk, attach or reference specific exhibits, Also include agreed upon adjustments aarlhutah&' to accrued Can'arue ion Change UGrctivesd A. Cost for 5 Maglin Benehe:st (per Alternate No. 111) Add $33,722.78 REDUCE SPECIFIED MACLIN BENCHES ALLOWANCE FROM $40,025.00 TO S6,302,22. CONTRACT SUM REMAINS UNCIIANGED. The original Contraot Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sunl will be unchanged by this Change Order in the amount of The new Contract Stan including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new Mute of Substantial Completion will be September 1, 2022 (per Addenda #1). NOTE: This Changer Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. 1,692,500.00 0.00 $ 1,692,500.00 $ 0.00 $ I,692,500.00 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1 &.S Group, Inc. (1SG Vieth Construction Corporation City of Waterloo ARCHITECT (Pirm Nome) SIGNATURE Nathan Cornpton, Architect/Project Manager CONTRAC i;-rFit,n er. mv)y. OWNER (Finn name) I Li °uerEut rE SIGNATURE 44.... s SIGNATURE Tony Vieth. Presldent/ Quentin Hart, Mayor PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE July 14, 2022 7/ 2 6/ 2 2 8/15/2022 DATE DATE DATE AIA Document 0701" — 2017, Copyright ®1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American institute of Architects,' -AIA,' II•e AIA Logo, and 'AIA Contract Documents' are registered Uadernarks and may not be used wllNaut permisslou. This document was produced by AIA software at 16:53:07 CT on 07114/2022 under Order No.2114332387 which expires on 07/12/2023, is not for resale, Is licensed for one. time use only. and may only be used in aceardanee with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: i3B9ADA44)